Registered No litigation declared Mixed project

Lonavala's Finest Phase2

By RAHUL HANUMANT SATAV

RG-MH-21508 · RERA P52100029628 · Last updated on MahaRERA portal: 6 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
14 of 22Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
14 of 33Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Lonavala's Finest Phase2 is a Mixed project by RAHUL HANUMANT SATAV in Pune, Maharashtra, registered with MahaRERA as P52100029628 on 14 Jun 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 19 of the 33 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameLonavala's Finest Phase2
  • TypeMixed
  • Location
    • Off Mumbai Pune main road
    • Waksai
    • Mawal
    • Pune
    • 410401
  • Pincode410401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100029628
  • ReraGenie IDRG-MH-21508

Builder

  • NameRAHUL HANUMANT SATAV
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2021First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed104 files

Current status

58%19 of 33 units booked
105.3%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PHASE 2 A WINGNA2216016
PHASE 2 B WINGNA2216016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

PHASE 2 A WING64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PHASE 2 B WING64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes42%
Water SupplyYes42%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes42%
Storm Water DrainsYes42%
Landscaping & Tree PlantingYes42%
Street LightingYes42%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes42%
Energy managemcntYes42%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes42%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,432 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Apr 2026

Approvals and building plan

Sanctioning authorityPune Metropolitian Regional Development Authority Pune
Permissible FSI5432.0
Proposed, not sanctioned5,432 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKARJAT
Estimated costRs 22.02 cr
Cost incurredRs 23.19 cr
Work done105.32%
BuildingWingEstimatedIncurred
PHASE 2 A WINGNARs 10.42 crRs 11.47 cr
PHASE 2 B WINGNARs 8.52 crRs 9.39 cr
-NARs 3.07 crRs 2.33 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectParakh Associates
EngineerInavit Consultants
EngineerAnna Jagtap
EngineerSANJIVKUMAR HARISHANKAR BIND
Chartered AccountantMr Rushikesh Anekar
Chartered AccountantP S BAFNA BAFNA
PartnerRole in project
RAHUL HANUMANT SATAV-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024534Dec 2024 → Dec 2025

Reason as filed by the promoterConstruction of the said project is 25% completed. We need extension to complete the remining construction.

EA04042620555Dec 2024 → Dec 2026

Reason as filed by the promoterProject work is 100% completetd we have aaplied for occupancy certificate vide application no.PMRDA202503136. We need extension as we are awating for occupancy certificate.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf6 Aug 2026
Withdrawal Update Form 2File: FORM 2.pdf6 Aug 2026
Withdrawal Update Form 3File: FORM 3 FINAL.pdf6 Aug 2026
Withdrawal Update Form 1File: FORM 1.pdf6 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf6 Jun 2026
Withdrawal Update Form 3File: FORM 3 fINAL.pdf6 Jun 2026
Form 1File: FORM 1 Architects Certificate 31-12-2025_compressed.pdf27 Mar 2026
Form 2File: FORM 2 Eng certificate 31-12-2025.pdf27 Mar 2026
Form 3File: FORM 3 CA CERTIFICATE 31-12-2025.pdf27 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold and unsold INEVNTORY DATED 31-12-2025.pdf27 Mar 2026
Form 1File: FORM 1 Architect Certificate 30-09-2025.pdf24 Dec 2025
Form 2File: FORM 2 ENGINEERS CERTIFICATE 30-09-2025.pdf24 Dec 2025
Form 3File: Form 3 CA Cerificate 30-09-2025.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30-09-2025.pdf24 Dec 2025
Form 1File: form 1_architect certificate - SE Phs II.pdf13 Aug 2025
Form 2File: Engineer Certificate form 2 Lonawala phs 2 june 25.pdf13 Aug 2025
Form 3File: Form 3 (CA ) Lonawala ph 2 june 25.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory FS 2 April to June 2025.pdf13 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Lonavala Phase -2 oct to de 24 final_compressed.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lanawala Phase 2 Form 3 (1)_compressed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 and Lonavla Phase 2 Oct to Dec 24_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lonavla Phase -2 Form 2 Engineering Certificate (1)_compressed.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24 Lonavala Phase 2_compressed.pdf18 Dec 2024
Layout approvalFile: GROUP HOUSING PLAN_11zon.pdf13 Aug 2024
Copy of Layout Approval (in case of layout)File: GROUP HOUSING PLAN_11zon.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A - LFP2.pdf10 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - LFP2.pdf10 Aug 2024
Declaration in FORM BFile: P52100029628_FileName_1_rotated.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lonavala Finest Phase 2 form 1 - 30 09 2022.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lonavala Finest Phase 2, form 1 - 30 06 2024.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Lonavala Phase 2 (30-06-2024)_compressed.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lonavala Finest Phase 2, Form 2 30-06-2024.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Lonavala Finest Phase 2 sold unsold Inventory 30-06-2024.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lonava Finest Phase 2 FORM 2 - 21-12-2021.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lonava Finest Phase 2 FORM 2 - 31-03-2022.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lonava Finest Phase 2 FORM 2 - 30-06-2022.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lonava Finest Phase 2 FORM 2 - 30-09-2022.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lonavala Finest Phase 2 Form 3 21 12 2021.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lonavala Finest Phase 2 Form 3 31 03 2022.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lonavala Finest Phase 2 Form 3 30 06 2022.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lonavala Finest Phase 2 Form 3 30 09 2022.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lonavalas Finest Phase 2 Form 2 Engineers Certificate 31-03-2024.pdf11 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Lonavalas Finest Phase 2 Form 2A 23-24.pdf11 Jul 2024
Disclosure of sold/ booked inventoryFile: Lonavala Finest Phase 2 Sold Unsold Inventory 31-03-2024.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lonavala Finest Phase 2 Form 3 31-03-2024_compressed.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lonavalas Finest Phase 2 Form 3 30-06-2023 (1)_compressed.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lonavala Finest Phase 2 Architect certificate 31-03-24.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lonavala Finest Phase 2 FORM 1 30-09-2023_compressed.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lonavala Finest Phase 2 FORM 1 31-12-2023_compressed.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lonavala Finest Phase 2 FORM 2 30-09-2023.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lonavala Finest Phase 2 FORM 2 31-12-2023.pdf7 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Lonava Finest Phase 2 FORM 2A 2022-23.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: Lonavala Finest Phase 2 DISCLOSURE OF SOLD BOOKED INVENTORY 30-09-2023.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: Lonavala Finest Phase 2 DISCLOSURE SOLD BOOKED INVENTORY 31-12-2023.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lonavala Finest Phase 2 FORM 3, 30-09-2023.pdf7 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lonavala Finest Phase 2 Form 3 31-12-2023_compressed.pdf7 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 (2)_compressed.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lonavalas Finest Phase 2 Form 3 31-03-2023_compressed.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lonavalas Finest Phase 2 Form 3 30-06-2023_compressed.pdf19 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 FORM 1 30-06-2023_compressed.pdf3 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-03-2023.pdf3 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-06-2023.pdf3 Oct 2023
Disclosure of sold/ booked inventoryFile: Lonavalas Finest Phase 2 Sold Unsold Inventory 30-06-23 (2).pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Lonavala Finest Phase 2.pdf24 Apr 2023
Disclosure of sold/ booked inventoryFile: LONAVALA FINEST PHASE 2 DISCLOSURE OF SOLD BOOKED INVENTORY March 2023.pdf24 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold and unsold- Lonavala phase 2.pdf4 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A Phase2.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Phase 2 PDF File-new.pdf1 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Phase-2.pdf27 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE LONAVALA'S FINEST PHASE 2_compressed.pdf26 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Phase-2.pdf25 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Phase2.pdf25 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_compressed.pdf9 Jun 2022
CERSAI detailsFile: CERSAI DECLARATION_compressed.pdf9 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-2021 Lonavala Finest Phase 2.pdf14 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 CA - Phase 2 31-03-2018.pdf5 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 CA - Phase 2 31-03-2019.pdf5 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 CA - Phase 2 31-03-2020.pdf5 Aug 2021
Declaration about Commencement CertificateFile: Declaration for commencement.pdf19 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2a FY 19-20.pdf19 Jul 2021

How this compares with Pune

58%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lonavala's Finest Phase2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Waksai13,700+ in Pune

2 kmLonavala's Finest Phase2Completed 15Lapsed / revoked 7Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: RAHUL HANUMANT SATAV

RAHUL HANUMANT SATAV has 2 registrations on MahaRERA, including LONAVALAS FINEST PHASE 1 and Lonavala's Finest Phase2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Lonavala's Finest Phase2 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lonavala's Finest Phase2?

The registered promoter entity is RAHUL HANUMANT SATAV, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lonavala's Finest Phase2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Lonavala's Finest Phase2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lonavala's Finest Phase2?

The professionals named in the filing: Architect: Parakh Associates; Engineer: Inavit Consultants; Engineer: Anna Jagtap; Engineer: SANJIVKUMAR HARISHANKAR BIND; Chartered Accountant: Mr Rushikesh Anekar; Chartered Accountant: P S BAFNA BAFNA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lonavala's Finest Phase2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lonavala's Finest Phase2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lonavala's Finest Phase2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.