ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Lodha Splendora - River View

Completed No litigation declared Residential / Group Housing project

Lodha Splendora - River View

By MACROTECH DEVELOPERS LIMITED

RG-MH-73767 · RERA P51700016375 · Last updated on MahaRERA portal: 18 Oct 2024

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
3Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Lodha Splendora - River View is a Residential / Group Housing project by MACROTECH DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700016375 on 8 May 2018. The registration is recorded completed; possession was promised by 30 Sep 2024. 3 complaints are on record with the regulator.

At a glance

Project

  • NameLodha Splendora - River View
  • TypeResidential / Group Housing
  • Location
    • Near Ghodbunder Road
    • BHAYANDERPADA
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700016375
  • ReraGenie IDRG-MH-73767

Builder

  • NameMACROTECH DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • ChairpersonRAJENDRA NARPATMAL LODHA
  • Other registrations140 more →
  • Completed126 of 141
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredMay 2018PromisedSep 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 May 2018
  • Promised completion30 Sep 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Platino DNA330000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Platino D: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed265

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots265
Open Space265

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,250 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI16533.63
Proposed, not sanctioned16,021 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAMALA MILLS COMPOUND

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS DESAI & ASSOCIATES
EngineerK C SHAH CONSULTANTS
Chartered AccountantB B JAIN & ASSOCIATES
Chartered AccountantMSKA & ASSOCIATES
Chartered AccountantChirag Sarvaiya & Co
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Litigation declared1

CaseCourtStatus
865 to 870/2013In the court of Civil Judge JD ThaneDismissed

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000056130Prashant khamgaonkarLodha Splendora08/09/2018
CC006000000056618Vaibhav Vasant BodkheLodha Developers Private Limited18/10/2018
CC006000000479885Macrotech Developers Ltd.JAMES MATHEW03/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jun 2024

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700016375 - Lodha Splendora - River View.pdf18 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 17 - OC (part) DATED - 01 02 2023-Riverview Platino D - 1119.PDF5 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 18 - O C (part) DATED - 23 03 2023 (Riverview) - 1134_compressed.pdf5 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 19 - O C (part) DATED - 22 06 2023 ( Riverview -Platino D) - 1165.pdf5 Jun 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4- Lodha Slpendora River View.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Splendora - River View - P51700016375 - March 24.pdf28 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 - Lodha Splendora - River View - P51700016375 - March 24.pdf15 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 - Lodha Splendora - River View - P51700016375 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Splendora - River View - P51700016375 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Lodha Splendora River view - P51700016375.pdf6 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lodha Splendore River View - Form1 - Sep23.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Splendora - River View.pdf17 Oct 2023
Certificates of CA (Form 3)File: Splendora River view.pdf21 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 37 splendora river view.pdf27 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (1).pdf24 Apr 2023
Disclosure of sold/ booked inventoryFile: LODHA SPLENDORA - RIVER VIEW.pdf30 Mar 2023
Details of encumbrancesFile: River View.pdf7 Dec 2022
CERSAI detailsFile: Lodha Splendora River View.pdf5 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 20 LODHA SPLENDORA - RIVER VIEW.pdf13 Nov 2022
Certificates of CA (Form 3)File: 20 LODHA SPLENDORA - RIVER VIEW.pdf13 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20 LODHA SPLENDORA - RIVER VIEW.pdf8 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20 LODHA SPLENDORA - RIVER VIEW.pdf30 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 95 LODHA SPLENDORA - RIVER VIEW.pdf17 Dec 2021
Certificates of CA (Form 3)File: 20 LODHA SPLENDORA - RIVER VIEW.pdf15 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 172 LODHA SPLENDORA - RIVER VIEW.pdf18 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 105_Crown Splendora Tower 1.pdf15 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1 Lodha Splendora - River View.pdf15 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 95 LODHA SPLENDORA - RIVER VIEW.pdf14 Oct 2021
Disclosure of sold/ booked inventoryFile: P51700016375.pdf14 Oct 2021
Certificates of CA (Form 3)File: 20 LODHA SPLENDORA - RIVER VIEW.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Vipul Pandya Conso[064-066].pdf12 Aug 2021
Layout approvalFile: Layout Riverview-min.pdf24 Mar 2021
Building plan approvalFile: Riverview Amended 1.pdf24 Mar 2021
Building plan approvalFile: Riverview Amended PlansV2.pdf24 Mar 2021
Copy of Layout Approval (in case of layout)File: Layout Riverview-min.pdf24 Mar 2021
Building Plan Approval (IOD)File: Riverview Amended 1.pdf24 Mar 2021
Building Plan Approval (IOD)File: Riverview Amended PlansV2.pdf24 Mar 2021
Details of encumbrancesFile: splendora rieverview.pdf29 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 1 Lodh Splendora River View.pdf27 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Splendora Riverview.pdf25 Aug 2020
Details of encumbrancesFile: Lodha Splendora River View.pdf11 Nov 2019
Annual Audit Report of Statutory CA (Form 5)File: Lodha Splendora River View.pdf30 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: River View C C dated 26022019.pdf17 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: Platino D C C dated 26 02 2019.pdf16 May 2019
Details of encumbrancesFile: SPLENDORA RIVER VIEW.pdf25 Feb 2019
Details of encumbrancesFile: Splendora River view.pdf16 Nov 2018
Details of encumbrancesFile: Lodha Splendora River View.pdf14 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LODHA SPLENDORA RIVER VIEW.pdf11 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LODHA SPLENDORA RIVER VIEW.pdf11 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: River View CCcompressed.pdf24 May 2018
Proforma of Allotment letterFile: ATS Lodha Splendora River View.pdf29 Apr 2018
Layout approvalFile: layout plan approved.pdf27 Apr 2018
Building plan approvalFile: APPROVED BUILDING PLAN.pdf27 Apr 2018
Building plan approvalFile: Building Plan for Approval 1.pdf27 Apr 2018
Building plan approvalFile: Building Plan for Approval 2.pdf27 Apr 2018
PAN CardFile: Lodha Developers Limited_Pan Card.pdf27 Apr 2018
Copy of the legal title reportFile: TITLE REPORT 1.pdf27 Apr 2018
Copy of the legal title reportFile: Supplemetal Report _02_03_2017.pdf27 Apr 2018
Copy of the legal title reportFile: 05_Addendum dated 28_03_2018_Splendora.pdf27 Apr 2018
Details of encumbrancesFile: ENCUMBRANES.pdf27 Apr 2018
Copy of Layout Approval (in case of layout)File: layout plan approved.pdf27 Apr 2018
Building Plan Approval (IOD)File: APPROVED BUILDING PLAN.pdf27 Apr 2018
Building Plan Approval (IOD)File: Building Plan for Approval 1.pdf27 Apr 2018
Building Plan Approval (IOD)File: Building Plan for Approval 2.pdf27 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC for Platino D.pdf27 Apr 2018
Declaration in FORM BFile: Form B.pdf27 Apr 2018
Certificates of CA (Form 3)File: FORM 3.pdf27 Apr 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PALAVA SAVANNA AND SIENAKalyan Shilphata road423CompletedAug 2020Sep 2018

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lodha Splendora - River View on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDERPADA7,600+ in Thane

2 kmLodha Splendora - River Completed 35Lapsed / revoked 9Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 68 registered projects within 2 km.

Builder: MACROTECH DEVELOPERS LIMITED

Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Lodha Splendora - River View is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lodha Splendora - River View?

The registered promoter entity is MACROTECH DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lodha Splendora - River View?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lodha Splendora - River View?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lodha Splendora - River View?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lodha Splendora - River View?

The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lodha Splendora - River View?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lodha Splendora - River View. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lodha Splendora - River View to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.