Home / Browse projects / Thane, Maharashtra / Lodha Quality Home Tower 3
Lodha Quality Home Tower 3
By MACROTECH DEVELOPERS LIMITED
RG-MH-14397 · RERA P51700022533 · Last updated on MahaRERA portal: 18 Oct 2024
Source: official MahaRERA filing
Red flags
- Litigation declared, 1 case
- 2 complaints at MahaRERA
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Lodha Quality Home Tower 3 is a Residential / Group Housing project by MACROTECH DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700022533 on 1 Oct 2019. The registration is recorded completed; possession was promised by 30 Sep 2024. 2 complaints are on record with the regulator.
At a glance
Project
- NameLodha Quality Home Tower 3
- TypeResidential / Group Housing
- Location
- Sainath Nagar
- Majiwada Thane
- Thane (M Corp.)
- Thane
- 400601
- Pincode400601
- RERA no.P51700022533
- ReraGenie IDRG-MH-14397
Builder
- NameMACROTECH DEVELOPERS LIMITED
- Entity typeCompany
- CINL45200MH1995PLC093041
- GSTIN27AAACL1490J1ZG
- ChairpersonRAJENDRA NARPATMAL LODHA
- WtdRaunika Malhotra
- Other registrations140 more →
- Completed126 of 141
- No longer live13 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on1 Oct 2019
- Promised completion30 Sep 2024
- Revised completionNone
- Buildings1 building record
- Documents filed84 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 3 | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Tower 3: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 18 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| Closing Parking | Yes | 100% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners10
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS DESAI & ASSOCIATES |
| Architect | VINI VILAS DESAI |
| Engineer | K C SHAH CONSULTANTS |
| Engineer | MEHUL KAIVANT SHAH |
| Engineer | K C SHAH DESIGNS LLP |
| Chartered Accountant | B B JAIN & ASSOCIATES |
| Chartered Accountant | MSKA & ASSOCIATES |
| Chartered Accountant | Chirag Sarvaiya & Co |
| Chartered Accountant | Chirag Bharat Sarvaiya |
| Chartered Accountant | M S K A |
| Partner | Role in project |
|---|---|
| LODHA DEVELOPERS LIMITED | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 66/2016 | Court of Civil Judge Senior Division Thane | For Argument |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000196409 | Saurabh Mittal | Sonali Talreja | 27/03/2021 |
| CC12501815 | MACROTECH DEVELOPERS LIMITED | Usha Ajit Chaudhary | 03/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Sep 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Oct 2024
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Layout Approval - Tower 3 - Compress.pdf | 18 Oct 2024 |
| Building plan approvalFile: Building Plan - Tower 3 - Compress.pdf | 18 Oct 2024 |
| Building plan approvalFile: Building Plan - Tower 3 - 2 - Compress.pdf | 18 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Approval - Tower 3 - Compress.pdf | 18 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form4 - Quality Home Tower 3.pdf | 18 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - Tower 3 - Stilt - Ground to 23 floor.pdf | 18 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan - Tower 3 - Compress.pdf | 18 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan - Tower 3 - 2 - Compress.pdf | 18 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Quality Home Tower 3 and 4 - Ground Floor OC.pdf | 18 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Crown T3 and MLCP part OC.PDF | 18 Oct 2024 |
| Declaration about Commencement CertificateFile: 2024 06 28 - Luxuria Crown - Amended CC -Tower 3 4 - Letter - Compress.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700022533 - Lodha Quality Homes - Tower 3.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Quality Homes Tower 3 - P51700022533 - June24.pdf | 10 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Lodha Quality Homes Tower 3 - P51700022533 - June24.pdf | 8 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Quality Homes Tower 3 - P51700022533 - March 24.pdf | 17 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Quality Homes Tower 3 - P51700022533 - March 24.pdf | 7 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Quality Homes Tower 3 - P51700022533 - Dec23.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Lodha Quality Homes T3 Sold Unsold Sept 23.pdf | 27 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Quality home Tower 3 - Form1 - Sep23.pdf | 21 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Quality Homes - Tower 3.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lodha Quality Tower - 3.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Lodha Quality homes Tower 3 March 23.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Lodha Quality homes Tower 3.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold_Quality Homes_T3.pdf | 25 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Lodha Quality Homes Tower 3.pdf | 26 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: T3.pdf | 15 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Lodha Quality Homes Tower 3.pdf | 14 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LODHA QUALITY HOMES TOWER 3.pdf | 5 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LODHA QUALITY HOMES TOWER 3.pdf | 3 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 97 LODHA QUALITY HOMES TOWER 3.pdf | 30 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Lodha Quality Homes Tower 3.pdf | 27 Dec 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 47 LODHA QUALITY HOMES TOWER 3.pdf | 17 Dec 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 97 LODHA QUALITY HOMES TOWER 3.pdf | 15 Dec 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 88 LODHA QUALITY HOMES TOWER 3.pdf | 18 Nov 2021 |
| Details of encumbrancesFile: Lodha Quality Homes- Tower 3.pdf | 27 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: P51700022533.pdf | 18 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 46_LQH Tower 3.pdf | 15 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 96 LODHA QUALITY HOMES - TOWER 3.pdf | 15 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 47 LODHA QUALITY HOMES TOWER 3.pdf | 14 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: P51700022533.pdf | 14 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 97 Lodha Quality Homes - Tower 3.pdf | 9 Oct 2021 |
| Details of encumbrancesFile: LQH T-3.pdf | 22 Sep 2021 |
| Details of encumbrancesFile: LQH-3.pdf | 16 Sep 2021 |
| Details of encumbrancesFile: Lodha Quality Home Tower_3.pdf | 23 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Anuj Chavan Form 2A-8.pdf | 12 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth CC dated 28 10 2020.pdf | 29 Oct 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 99 Lodha Quality Homes Tower 3.pdf | 27 Oct 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Lodha Quality Homes Twr 3.pdf | 28 Aug 2020 |
| Building plan approvalFile: T3 GF.pdf | 27 Jan 2020 |
| Building plan approvalFile: T3 Refuge.pdf | 27 Jan 2020 |
| Building plan approvalFile: T3 Typical.pdf | 27 Jan 2020 |
| Layout approvalFile: Layout.pdf | 27 Jan 2020 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 27 Jan 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: T3 GF.pdf | 27 Jan 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: T3 Refuge.pdf | 27 Jan 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: T3 Typical.pdf | 27 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: T3 23rd Fl.pdf | 27 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 261219.pdf | 27 Jan 2020 |
| Building plan approvalFile: For approval T3 Part 1.pdf | 13 Dec 2019 |
| Building plan approvalFile: For Approval T3 Part 3.pdf | 13 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: For approval T3 Part 1.pdf | 13 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: For Approval T3 Part 3.pdf | 13 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: For Approval T3 Part 2.pdf | 13 Dec 2019 |
| Building plan approvalFile: Compressed.pdf | 26 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Compressed.pdf | 26 Nov 2019 |
| Declaration in FORM BFile: Form B_Updated.pdf | 27 Sep 2019 |
| Layout approvalFile: Layout.pdf | 25 Sep 2019 |
| Building plan approvalFile: Building Plan 1.pdf | 25 Sep 2019 |
| Building plan approvalFile: Building Plan 2.pdf | 25 Sep 2019 |
| Building plan approvalFile: Building Plan 3.pdf | 25 Sep 2019 |
| Copy of the legal title reportFile: Majiwade _51A_compressed.pdf | 25 Sep 2019 |
| Copy of the legal title reportFile: Majiwade_Survey No 32_15.pdf | 25 Sep 2019 |
| Copy of the legal title reportFile: Title Report - Majiwade_4.pdf | 25 Sep 2019 |
| Copy of the legal title reportFile: Title Report - Majiwade_28.pdf | 25 Sep 2019 |
| Copy of the legal title reportFile: Title Report Majiwade_34_7B.PDF | 25 Sep 2019 |
| Details of encumbrancesFile: Encumbrances.pdf | 25 Sep 2019 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 25 Sep 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1.pdf | 25 Sep 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf | 25 Sep 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf | 25 Sep 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PALAVA SAVANNA AND SIENA | Kalyan Shilphata road | 423 | Completed | Aug 2020 | Sep 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 140 other registrations, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
Keep Lodha Quality Home Tower 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Majiwada Thane7,600+ in Thane
ASHAR PULSE
Ms ASHAR VENTURES
SHETH ZURI
Sheth Developers Private Limited
Jagdale Edge
JAGDALE INFRASTRUCTURE PVT. LTD.
Bliss
Kapstone Constructions Private Limited
RUSTOMJEE LA VIE Wing D
Kapstone Constructions Private Limited
Thane Project
LODHA DEVELOPERS LIMITED
See every Thane project, with the district possession charts
Builder: MACROTECH DEVELOPERS LIMITED
Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Lodha Quality Home Tower 3 is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Lodha Quality Home Tower 3?
The registered promoter entity is MACROTECH DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Lodha Quality Home Tower 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Lodha Quality Home Tower 3?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Lodha Quality Home Tower 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Lodha Quality Home Tower 3?
The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Architect: VINI VILAS DESAI; Engineer: K C SHAH CONSULTANTS; Engineer: MEHUL KAIVANT SHAH; Engineer: K C SHAH DESIGNS LLP; Chartered Accountant: B B JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Lodha Quality Home Tower 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback