Home / Browse projects / Thane, Maharashtra / Lodha Miraroad Tower - 1 and Tower - 2

Registered No litigation declared Residential / Group Housing project

Lodha Miraroad Tower - 1 and Tower - 2

By LODHA DEVELOPERS LIMITED

RG-MH-95028 · RERA P51700034071 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
66 of 372Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Lodha Miraroad Tower - 1 and Tower - 2 is a Residential / Group Housing project by LODHA DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700034071 on 24 Mar 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 306 of the 372 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameLodha Miraroad Tower - 1 and Tower - 2
  • TypeResidential / Group Housing
  • Location
    • .
    • Ghodbunder Road
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • RERA no.P51700034071
  • ReraGenie IDRG-MH-95028

Builder

  • NameLODHA DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • WtdRaunika Malhotra
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredMar 2022First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Mar 2022
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings2 building records
  • Documents filed95 files

Current status

82%306 of 372 units booked
98.8%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lodha Miraroad Tower - 1NA32321860186
Lodha Miraroad Tower - 2NA32321860186

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Lodha Miraroad Tower - 182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Lodha Miraroad Tower - 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes58%
Street LightingYes90%
Community BuildingsYes60%
Treatment And Disposal Of Sewage And Sullage WaterYes65%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes55%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes60%
Open ParkingYes0%

Parking filed345

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots345
Closed/Covered325
Open Space20
BuildingClosed/CoveredOpen SpaceTotal
Lodha Miraroad Tower - 118010190
Lodha Miraroad Tower - 214510155

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,890 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Oct 2025

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Corporation,Thane
Permissible FSI33487.0
Proposed, not sanctioned30,443 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRahimtullah house, Homji Street, Horniman Circle, Fort Mumbai 400001
Estimated costRs 160.00 cr
Cost incurredRs 158.01 cr
Work done98.75%
BuildingWingEstimatedIncurred
-NARs 56.00 crRs 55.30 cr
Lodha Miraroad Tower - 1NARs 52.00 crRs 51.35 cr
Lodha Miraroad Tower - 2NARs 52.00 crRs 51.35 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associate
ArchitectPradeep
EngineerK C Shah Consultants
EngineerVinayak Bellana
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A & Associates
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24122518961Mar 2026 → Mar 2027

Reason as filed by the promoterConstruction Delay resulting from directives issued by the National Green Tribunal (NGT).

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC12602174rahul surendra yadavLODHA DEVELOPERS LIMITED13/04/2026
CC12501869DHARMENDRA RAJENDRA LUNAWATMACROTECH DEVELOPERS LIMITED09/06/2025
CC12602167Sumit Sushil PardeshiLODHA DEVELOPERS LIMITED13/04/2026
CC12604335Fakhruddin Taiyebali MotorwalaLODHA DEVELOPERS LIMITED11/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Lodha Miraroad Tower - 1 and Tower - 2.pdf23 Jun 2026
Withdrawal Update Form 1File: Form1.pdf19 May 2026
Withdrawal Update Form 2File: Form-2.pdf19 May 2026
Withdrawal Update Form 3File: Form-3.pdf19 May 2026
Withdrawal Update Form 1File: Form-1 Mira Road T-1 and T-2 Dec-25.pdf24 Jan 2026
Withdrawal Update Form 2File: Lodha Miraroad - Tower 1 And Tower 2 Form 2.pdf24 Jan 2026
Withdrawal Update Form 3File: Lodha Miraroad - Tower 1 And Tower 2 Form 3.pdf24 Jan 2026
Layout approvalFile: Layout plan for Lodha Miraroad - T1 u0026 T2.pdf26 Nov 2025
Building plan approvalFile: Layout plan for Lodha Miraroad - T1 u0026 T2.pdf26 Nov 2025
Withdrawal Update Form 1File: Form 1 - Sep25.pdf26 Nov 2025
Withdrawal Update Form 2File: Lodha Miraroad - Tower 1 And Tower 2_Form 2.pdf26 Nov 2025
Withdrawal Update Form 3File: Lodha Miraroad - Tower 1 And Tower 2_Form 3.pdf26 Nov 2025
Layout approvalFile: Layout plan for Lodha Miraroad - T1 & T2.pdf20 Nov 2025
Building plan approvalFile: Building plan _ New Mira Road.pdf20 Nov 2025
Form 5 (FY 2024-2025)File: Mira Road Tower 1 and 2.pdf31 Oct 2025
Form 2A (FY 2024-2025)File: Lodha Miraroad - Tower 1 And Tower 2 - P51700034071 - Form 2A.pdf25 Jul 2025
OthersFile: Updated CC.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: Layout Lodha Miraroad Tower 1 & 2.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Miraroad Tower 1 & 2- June-25.pdf18 Jul 2025
Form 1File: Mira Road Tower 1 and 2 - Form1 - June 25.pdf18 Jul 2025
Form 2File: form 2 Mira road T1 & T2-June-25.pdf18 Jul 2025
Form 3File: Form 3 Miraroad Tower 1&2- June-25.pdf18 Jul 2025
Form 1File: Form1 -Mira Road Tower 1 and 2 - March25.pdf27 Jun 2025
Form 2File: Form 2 - Lodha Miraroad - Tower 1 And Tower 2 - Mar 25.pdf27 Jun 2025
Form 3File: Form- 3 Lodha Miraroad - Tower 1 And Tower 2 Mar -25 Form-3_compressed.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Miraroad Supremo.pdf27 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Miraroad Tower 1 and 2.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mira road Tower 1 2 Dec-24 Form-3 Signed.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lodha Miraroad - Tower 1 And Tower 2 - Dec 24 Signed.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: Mira road T-1 2 Sold Unsold Signed.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Mira Road Tower 1 and 2.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Sep22.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec22.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - June23.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mira Road tower 1 and 2.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - June22.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mira Road - Form3.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 3 - June 24.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 3 - March 24.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 2 3 - June23.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 2 3 - Sep22.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 2 3 - June22.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Lodha Miraroad - Tower 1 And Tower 2 - Dec 22.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lodha Miraroad - Tower 1 And Tower 2 - Dec22.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - June22.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - Sep22.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - June23.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 3 - March 24.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 3 - June 24.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form-2 Mira road Supremo.pdf17 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 0529_001.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sigend Form-3 Lodha Mira road Supremus.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form-2 Mira road Supremo.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: Lodha Miraroad - Tower 1 And 2 .pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mira Road tower 1 and 2.pdf5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700034071 - Lodha Miraroad - Tower 1 and Tower 2.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Lodha Miraroad - Tower 1 And Tower 2 - P51700034071.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Miraroad - Tower 1 And Tower 2 - P51700034071 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Lodha Miraroad - Tower 1 And Tower 2 - P51700034071 - June24.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Miraroad - Tower 1 And Tower 2 - P51700034071 - March 24.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 - Lodha Miraroad - Tower 1 And Tower 2 - Jan24.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lodha Miraroad - Tower 1 And Tower 2 - P51700034071 - March 24.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lodha Miraroad - Tower 1 And Tower 2 - Form2 - Jan24.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 - Lodha Miraroad - Tower 1 And Tower 2 - P51700034071 - Dec-23.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Miraroad - Tower 1 And Tower 2 - P51700034071 - Dec23.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Miraroad - Tower 1 And Tower 2 - P51700034071 - Dec23.pdf26 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hinjewadi Project - P52100050124 - Form2 - Sep23.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lodha Miraroad - Tower 1 And Tower 2 - P51700034071 - Form3.pdf8 Dec 2023
Disclosure of sold/ booked inventoryFile: Lodha Miraroad - Tower 1 And Tower 2 - Sold Unsold - Sep23.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Mira Road Tower 1 and 2 - Form1 - Sep23.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Mira Road Tower 1 - 2 - June23 - Form1.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mira Road Tower 1 and 2.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mira road Tower Form 2 Mar 23.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mira road Tower Form 3 Mar 23.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Miraroad - Tower 1 and Tower 2.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Lodha Miraroad - Tower 1 And Tower 2.pdf30 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Amended CC-Mira Road.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 131 Lodha Miraroad - Tower 1 And Tower 2.pdf14 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf16 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 132 Lodha Miraroad - Tower 1 And Tower 2.pdf5 Aug 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Liana BP51700033964Dombivali, Thane140Mar 2022CompletedFeb 2026Jun 2024

How this compares with Thane

82%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lodha Miraroad Tower - 1 and Tower - 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghodbunder Road7,600+ in Thane

Builder: LODHA DEVELOPERS LIMITED

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Lodha Miraroad Tower - 1 and Tower - 2 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lodha Miraroad Tower - 1 and Tower - 2?

The registered promoter entity is LODHA DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lodha Miraroad Tower - 1 and Tower - 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lodha Miraroad Tower - 1 and Tower - 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lodha Miraroad Tower - 1 and Tower - 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lodha Miraroad Tower - 1 and Tower - 2?

The professionals named in the filing: Architect: Vilas Desai & Associate; Architect: Pradeep; Engineer: K C Shah Consultants; Engineer: Vinayak Bellana; Chartered Accountant: Chirag Sarvaiya & Co; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lodha Miraroad Tower - 1 and Tower - 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lodha Miraroad Tower - 1 and Tower - 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lodha Miraroad Tower - 1 and Tower - 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.