Registration lapsed No litigation declared Residential / Group Housing project

Lodha Crown Kolshet-Tower 4

By LODHA DEVELOPERS LIMITED

RG-MH-58345 · RERA P51700046037 · Last updated on MahaRERA portal: 28 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date
  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
9 of 240Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

Lodha Crown Kolshet-Tower 4 is a Residential / Group Housing project by LODHA DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700046037 on 15 Jun 2022. Possession was promised by 31 May 2026 and is now 5 months past that date. 231 of the 240 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameLodha Crown Kolshet-Tower 4
  • TypeResidential / Group Housing
  • Location
    • Kolshet Road
    • Kolshet
    • Chavindra
    • Thane
    • 400607
  • Pincode400607
  • RERA no.P51700046037
  • ReraGenie IDRG-MH-58345

Builder

  • NameLODHA DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • MdAbhishek Mangalprabhat Lodha
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

5 months past promisethis monthRegisteredJun 2022PromisedMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Jun 2022
  • Promised completion31 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed117 files

Current status

96%231 of 240 units booked
99.3%Work done, per cost certificate

Figures as on 28 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Crown Kolshet -Tower 4NA31262400240

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

Crown Kolshet -Tower 4: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes96%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes85%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,363 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Feb 2026

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI17910.0
Proposed, not sanctioned16,282 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHURCHGATE
Estimated costRs 63.29 cr
Cost incurredRs 62.83 cr
Work done99.28%
BuildingWingEstimatedIncurred
Crown Kolshet -Tower 4NARs 41.14 crRs 40.84 cr
-NARs 22.15 crRs 21.99 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPradeep Kamble
EngineerMEHUL KAIVANT SHAH
EngineerParesh Dabhi
Chartered AccountantChirag Sarvaiya & Co
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12503546Sonia Vinod SomaiyaLODHA DEVELOPERS LIMITED05/10/2025
CC12602903Amit KumarLODHA DEVELOPERS LIMITED17/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A - 24-25.pdf28 May 2026
Form 2A (FY 2025-2026)File: From 2A - 25-26.pdf28 May 2026
Withdrawal Update Form 1File: Form1 -Lodha Crown Kolshet-Tower 4 - P51700046037- Mar-26.pdf20 Apr 2026
Withdrawal Update Form 2File: Lodha Crown Kolshet-Tower 4_Form 2_Mar26.pdf20 Apr 2026
Withdrawal Update Form 3File: Lodha Crown Kolshet-Tower 4_Form 3_Mar26.pdf20 Apr 2026
Form 1File: Form-1 Dech5 - P51700046037 -f.pdf24 Jan 2026
Form 2File: Lodha Crown Kolshet-Tower 4 Form 2.pdf24 Jan 2026
Form 3File: Lodha Crown Kolshet-Tower 4 Form 3.pdf24 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf24 Jan 2026
Form 1File: Lodha Crown Kolshet Tower 4 - Form-1-sep-25.pdf25 Oct 2025
Form 2File: Lodha Crown Kolshet-Tower 4_Form 2.pdf25 Oct 2025
Form 3File: Lodha Crown Kolshet-Tower 4_Form 3.pdf25 Oct 2025
Disclosure of Sold and Booked InventoryFile: Lodha Crown Kolshet-Tower 4_Sold Unsold_Sept'25.pdf25 Oct 2025
Form 1File: Form -1 Crown Kolshet Tower 4 -June-25.pdf18 Jul 2025
Form 2File: form 2 Crown kolshet tower 4- June-25.pdf18 Jul 2025
Form 3File: Form 3 Crown kolshet tower 4- June-25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Crown Kolshet Tower 4- june-25.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: Layout Lodha Crown Kolshet Tower - 4.pdf18 Jul 2025
OthersFile: Updated CC.pdf18 Jul 2025
Form 1File: Form 1 - Lodha Crown Kolshet Tower 4.pdf30 May 2025
Form 2File: Form 2 - Lodha Crown Kolshet-Tower 4 - Mar 25.pdf30 May 2025
Form 3File: Form 3 - Lodha Crown Kolshet-Tower 4 Mar -25.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Lodha Crown Kolshet-Tower 4 - Mar 25.pdf30 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Amara 23.pdf27 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Lodha Crown Kolshet-Tower 4.pdf27 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lodha Crown Kolshet-Tower 4 Mar -25 Form-3.pdf16 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lodha Crown Kolshet-Tower 4 - Mar 25.pdf16 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Crown Kolshet Tower 4.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Crown Kolshet T-4 Form-3 Dec-24_compressed.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lodha Crown Kolshet-Tower 4 - Dec 24.pdf3 Mar 2025
Disclosure of sold/ booked inventoryFile: Crown Kolshet T-4 Sold Unsold Signed.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Crown Kolshet T-4 Form-3.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Crown Kolshet Tower 4.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Sep22.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Dec22.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - March23.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - June23.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - June22.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - sep24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - sep24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 3 - June24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 3 - March24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 3 - Sep23.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 2 3 - June23.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 2 3 - March23.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 2 3 - Dec22.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 2 3 - Sep22.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 2 3 - June22.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 2 3 - Dec23.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - June23.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sep-24 form 2.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 3 - June24.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 3 - March24.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 3 - Dec23.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 3 - Sep23.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - March23.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - Dec22.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - Sep22.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - June22.pdf14 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Fy 2022-23.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sigend Form-3 Lodha Kolshet -Tower 4.pdf31 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form-2 Crown Kolshet T-4- Sept-24.pdf31 Dec 2024
Disclosure of sold/ booked inventoryFile: Lodha Crown Kolshet - Tower 4.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha crown kolshet tower 4.pdf4 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700046037 - Lodha Crown Kolshet-Tower 4.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Lodha Crown Kolshet-Tower 4 - P51700046037.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Crown Kolshet-Tower 4 - P51700046037 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Lodha Crown Kolshet-Tower 4 - P51700046037 - June24.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Crown Kolshet-Tower 4 - P51700046037 - March 24.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Crown Kolshet-Tower 4 - P51700046037 - March 24.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Crown Kolshet-Tower 4 - P51700046037 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Crown Kolshet-Tower 4 - P51700046037 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Lodha Crown Kolshet-Tower 4-P51700046037.pdf22 Dec 2023
Disclosure of sold/ booked inventoryFile: Lodha Crown Kolshet Tower 4 - P51700046037.pdf5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Crown Kolshet Tower 4 - Form1 - Sep23.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Lodha Crown Kolshet-Tower 4.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Crown Kolshet-Tower 4.pdf17 Oct 2023
Layout approvalFile: 3 - Layout - Plot - B2 - Amended CC Plan.pdf2 Aug 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Liana BP51700033964Dombivali, Thane140Mar 2022CompletedFeb 2026Jun 2024

How this compares with Thane

96%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lodha Crown Kolshet-Tower 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolshet7,600+ in Thane

Builder: LODHA DEVELOPERS LIMITED

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Lodha Crown Kolshet-Tower 4 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Lodha Crown Kolshet-Tower 4 is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lodha Crown Kolshet-Tower 4?

The registered promoter entity is LODHA DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lodha Crown Kolshet-Tower 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lodha Crown Kolshet-Tower 4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lodha Crown Kolshet-Tower 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lodha Crown Kolshet-Tower 4?

The professionals named in the filing: Architect: Pradeep Kamble; Engineer: MEHUL KAIVANT SHAH; Engineer: Paresh Dabhi; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lodha Crown Kolshet-Tower 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lodha Crown Kolshet-Tower 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lodha Crown Kolshet-Tower 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.