Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2028Possession promisedmoved 12 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 60%
228 of 352Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Lodha Crown Kolshet - Tower 3 is a Residential / Group Housing project by LODHA DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700046319 on 22 Jun 2022. Possession is promised by 29 Sep 2028. The completion date has moved by 12 months from the original filing. 124 of the 352 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameLodha Crown Kolshet - Tower 3
  • TypeResidential / Group Housing
  • Location
    • Kolshet Road
    • Kolshet
    • Chavindra
    • Thane
    • 400607
  • Pincode400607
  • RERA no.P51700046319
  • ReraGenie IDRG-MH-38054

Builder

  • NameLODHA DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • DirectorsRajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha, Rajendra Lodha and 1 more
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredJun 2022First promiseSep 2027Revised toSep 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Jun 2022
  • Promised completion29 Sep 2028
  • Revised completionRevised to 29 Sep 2028 (originally 30 Sep 2027)
  • Buildings1 building record
  • Documents filed91 files

Current status

35%124 of 352 units booked

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Crown Kolshet - Tower 3NA25243520352

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 60%.

Crown Kolshet - Tower 3: 20% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth60%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,366 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTHANE municipal cORPORATION tHANE
Permissible FSI25303.6
Proposed, not sanctioned23,004 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFORT MUMBAI

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPradeep Kamble
ArchitectVini
EngineerMEHUL KAIVANT SHAH
EngineerTushar Marathe
Chartered AccountantChirag Sarvaiya
Chartered AccountantM S K A & Associates
Chartered AccountantChirag Sarvaiya & Co
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08062621268Sep 2027 → Sep 2028

Reason as filed by the promoterWe hereby submit this application seeking an extension us 6 of the project completion date for our registered project “Lodha Crown Kolshet-Tower 3” bearing MahaRERA Registration No. P51700046319. The applicant promoter respectfully submits that the project has been delayed due to circumstances beyond the control of the promoter, primarily relating to issues concerning the requirement of Environmental Clearance (EC) and jurisdictional ambiguity between the Central and State authorities for granting such clearance. The project site falls within a 5-kilometre radius of Thane Creek Flamingo Sanctu

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Sep 2028

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Lodha Crown Kolshet - Tower 3 - P51700046319.pdf24 Jun 2026
Form 1File: Crown Kolshet Tower 3 - Mar 26 - P51700046319 -Mar-26.pdf20 Apr 2026
Form 2File: Lodha Crown Kolshet-Tower 3_Form 2_Mar26.pdf20 Apr 2026
Form 3File: Lodha Crown Kolshet-Tower 3_Form 3_Mar26.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Lodha Crown Kolshet-Tower 3_Mar 26_Sold Unsold.pdf20 Apr 2026
Form 1File: Form-1.pdf24 Jan 2026
Form 2File: Lodha Crown Kolshet-Tower 3 Form 2.pdf24 Jan 2026
Form 3File: Lodha Crown Kolshet-Tower 3 Form 3.pdf24 Jan 2026
Disclosure of Sold and Booked InventoryFile: Lodha Crown Kolshet-Tower 3 Sold Unsold.pdf24 Jan 2026
Form 1File: Lodha Crown Kolshet Tower 3 - Form-1 Sep-25.pdf25 Oct 2025
Form 2File: Lodha Crown Kolshet-Tower 3_Form 2.pdf25 Oct 2025
Form 3File: Lodha Crown Kolshet-Tower 3_Form 3.pdf25 Oct 2025
Disclosure of Sold and Booked InventoryFile: Lodha Crown Kolshet-Tower 3_Sold Unsold_Sept'25.pdf25 Oct 2025
Form 1File: Form-1 Crown Kolshet Tower 3 - June 25.pdf18 Jul 2025
Form 2File: form 2 Crown kolshet tower 3- June-25.pdf18 Jul 2025
Form 3File: Form 3 Crown kolshet tower 3- June-25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Crown Kolshet Tower 3- June-25.pdf18 Jul 2025
OthersFile: Updated CC.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: Layout Lodha Crown Kolshet Tower -3.pdf18 Jul 2025
Form 1File: Form 1- Lodha Crown Kolshet Tower 3.pdf30 May 2025
Form 2File: Form 2 - Lodha Crown Kolshet-Tower 3 - Mar 25.pdf30 May 2025
Form 3File: Form-3- Lodha Crown Kolshet-Tower 3 Mar -25.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Lodha Crown Kolshet-Tower 3 - Mar 25.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Crown Kolshet Tower 3.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Crown Kolshet T-3 Form-3 Dec-24_compressed.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lodha Crown Kolshet-Tower 3 - Dec 24 Signed.pdf3 Mar 2025
Disclosure of sold/ booked inventoryFile: Crown Kolshet T-3 Sold Unsold Signed.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Crown Kolshet Tower 3.pdf27 Jan 2025
Declaration in FORM BFile: Form B Crown Kolshet - Tower 3.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep-23.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June-24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar-24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec-23.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June-23.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar-23.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec-22.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep-22.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June-24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mar-24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec-23.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sep-23.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June-23.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mar-23.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec-22.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sep-22.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha crown kolshet tower 3.pdf4 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lodha crown Kolshet tower 3 - Sep24.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lodha Crown Kolshet tower 3 - Sep24.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Crown Kolshet-Tower 3 - P51700046319 - June24.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Lodha Crown Kolshet - Tower 3.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700046319 - Lodha Crown Kolshet-Tower 3.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Lodha Crown Kolshet-Tower 3 - P51700046319.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Crown Kolshet-Tower 3 - P51700046319 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Lodha Crown Kolshet-Tower 3 - P51700046319 - June24.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Crown Kolshet-Tower 3 - P51700046319 - March 24.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Crown Kolshet-Tower 3 - P51700046319 - March 24.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Crown Kolshet-Tower 3 - P51700046319 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Crown Kolshet-Tower 3 - P51700046319 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Lodha Crown Kolshet-Tower3 - Sep23-merged - P51700046319.pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Crown Kolshet Tower 3 - Form1 - Sep23.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Crown Kolshet-Tower 3.pdf17 Oct 2023
Layout approvalFile: 3 - Layout - Plot - B2 - Amended CC Plan.pdf2 Aug 2023
Building plan approvalFile: 25 -Tower-3 - Plot - B2 - Amended CC Plan.pdf2 Aug 2023
Building plan approvalFile: 26 -Tower-3 - Plot - B2 - Amended CC Plan.pdf2 Aug 2023
Copy of Layout Approval (in case of layout)File: 3 - Layout - Plot - B2 - Amended CC Plan.pdf2 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 25 -Tower-3 - Plot - B2 - Amended CC Plan.pdf2 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 26 -Tower-3 - Plot - B2 - Amended CC Plan.pdf2 Aug 2023
Disclosure of sold/ booked inventoryFile: Kolshet _ T3.pdf29 Mar 2023
Details of encumbrancesFile: Tower 3.pdf9 Aug 2022
Declaration about Commencement CertificateFile: CC Decla-Tower 3.pdf29 Jul 2022
Building plan approvalFile: B2 Crown-Building Plan.pdf28 Jul 2022
Layout approvalFile: Crown Kolshet Layout.pdf28 Jul 2022
Building plan approvalFile: B 2 Tower 3.pdf28 Jul 2022
Copy of Layout Approval (in case of layout)File: Crown Kolshet Layout.pdf28 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: B2 Crown-Building Plan.pdf28 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: B 2 Tower 3.pdf28 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Amara CC_compressed.pdf28 Jul 2022
Layout approvalFile: 2_71- Layout Approval.pdf17 Jun 2022
Building plan approvalFile: 30_71- Building Approval.pdf17 Jun 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Liana BP51700033964Dombivali, Thane140Mar 2022CompletedFeb 2026Jun 2024

How this compares with Thane

35%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lodha Crown Kolshet - Tower 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolshet7,600+ in Thane

Builder: LODHA DEVELOPERS LIMITED

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Lodha Crown Kolshet - Tower 3 is delayed beyond 29 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lodha Crown Kolshet - Tower 3?

The registered promoter entity is LODHA DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lodha Crown Kolshet - Tower 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Lodha Crown Kolshet - Tower 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lodha Crown Kolshet - Tower 3?

The professionals named in the filing: Architect: Pradeep Kamble; Architect: Vini; Engineer: MEHUL KAIVANT SHAH; Engineer: Tushar Marathe; Chartered Accountant: Chirag Sarvaiya; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lodha Crown Kolshet - Tower 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lodha Crown Kolshet - Tower 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lodha Crown Kolshet - Tower 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.