Home / Browse projects / Pune, Maharashtra / LIVMO PHASE I
LIVMO PHASE I
RG-MH-16113 · RERA P52100025084 · Last updated on MahaRERA portal: 12 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LIVMO PHASE I is a Residential / Group Housing project by PRIYANKA BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100025084 on 18 Mar 2020. Possession was promised by 27 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 220 of the 234 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameLIVMO PHASE I
- TypeResidential / Group Housing
- Location
- MIDC Main Road
- Hinjawadi Phase III
- Bhoirwadi
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100025084
- ReraGenie IDRG-MH-16113
Builder
- NamePRIYANKA BUILDERS
- Entity typePartnership
- PartnersJITENDRA SUNDERDAS PANJABI, RAJU RAM PANJABI, NARESH RAM PANJABI
- Other registrations1 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Mar 2020
- Promised completion27 Dec 2025
- Revised completionRevised to 27 Dec 2025 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed121 files
Current status
Figures as on 12 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C Building | NA | 15 | 15 | 220 | 14 | 234 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.
C Building: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 35% |
| Community Buildings | Yes | 90% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 70% |
| Open Parking | Yes | 90% |
Parking filed34
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C Building | NA | Rs 37.02 cr | Rs 37.02 cr |
| - | NA | Rs 8.64 cr | Rs 8.64 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vka Architecture |
| Engineer | Akshay Nigade |
| Engineer | Dayanand Panchappa Sonkamble |
| Chartered Accountant | Madhusudan Jhanwar |
| Chartered Accountant | L. B. Laddha & Co |
| Partner | Role in project |
|---|---|
| PRIYANKA BUILDERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe hereby submit that due to the unavoidable circumstances beyond our control, we are few months behind the planned schedule for completion of the above said project. Therefore in lieu of the above, we humbly request you to kindly grant extension of time for possession of the above mentioned project and allow us to update the date of possession on MAHARERA website as 30th December 2024
Reason as filed by the promoterDue to the unavoidable circumstances beyond our control, we are few months behind the planned schedule for completion of the above said project
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500801 | Avinash Parmar | PRIYANKA BUILDERS | 09/03/2025 |
| CC12501148 | Yeltsin Noel Da Valeta Fernandes | Yeltsin Noel Da Valeta Fernandes (Allottee) | 06/04/2025 |
| CC12501204 | Satish Ramdas Kute | PRIYANKA BUILDERS | 11/04/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Mar 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Mar 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed121
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Livmo Ph-I - Form 2A - Mar 2025 (signed).pdf | 12 Aug 2026 |
| Form 2A (FY 2025-2026)File: Livmo Ph-I - Form 2A - Mar 2026 (signed).pdf | 12 Aug 2026 |
| Form 2A (FY 2024-2025)File: Livmo Ph-I - Form 2A (signed).pdf | 7 Aug 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - F Y 2024-25 - Livmo Ph-I.pdf | 28 Apr 2026 |
| Form 5 (FY 2023-2024)File: Form 5 - F Y 2023-24 - Livmo Ph-I.pdf | 24 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - F Y 2024-25 - Livmo Ph-I.pdf | 24 Apr 2026 |
| Building plan approvalFile: 15-19 C fp.pdf | 10 Mar 2026 |
| Building plan approvalFile: 17-19 C2.pdf | 10 Mar 2026 |
| Building plan approvalFile: 18-19.pdf | 10 Mar 2026 |
| Building plan approvalFile: 19-19 club house.pdf | 10 Mar 2026 |
| Withdrawal Update Form 1File: Livmo Ph-I - Form 1 (signed).pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: Livmo Ph-I - Form 2 (signed).pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: Livmo Ph-I - Form 3 (signed).pdf | 15 Jan 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 - Livmo Ph-I (signed).pdf | 29 Dec 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 - Livmo Ph-I (signed).pdf | 29 Dec 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 - Livmo Ph-I (signed).pdf | 29 Dec 2025 |
| Withdrawal Update Form 1File: Livmo Ph-I - Form 1 (signed).pdf | 21 Nov 2025 |
| Withdrawal Update Form 2File: Livmo Ph-I - Form 2 (signed).pdf | 21 Nov 2025 |
| Withdrawal Update Form 3File: Livmo Ph-I - Form 3 (signed).pdf | 21 Nov 2025 |
| Withdrawal Update Form 1File: Livmo Ph-I - Form 1 (signed).pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Livmo Ph-I - Form 2 (signed).pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: Livmo Ph-I - Form 3 (signed).pdf | 15 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Livmo Ph-I - Form 1 (signed).pdf | 20 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Livmo Ph-I - Form 3 (signed).pdf | 20 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Livmo Ph-I - Form 2 (signed).pdf | 20 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Livmo Ph-I - Inventory Disclosure.pdf | 20 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Livmo Ph-I - Form 2A (signed).pdf | 20 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Livmo Ph-I.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Livmo Ph-I.pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Livmo Ph-I.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Livmo Ph-I.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Livmo Ph-I.pdf | 11 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Livmo Ph-I.pdf | 9 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mar'2023 - Livmo Ph-I.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jun'2023 - Livmo Ph-I.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mar'2023 - Livmo Ph-I_compressed.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar'2023 - Livmo Ph-I.pdf | 21 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - F Y 2023-24 - Livmo Ph-I.pdf | 25 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Livmo Ph-I.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Livmo Ph-I.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Livmo Ph-I.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Livmo Ph-I.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LivMo Ph-I.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LivMo Ph-I.pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: LivMo Ph-I.pdf | 15 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LivMo Ph-I.pdf | 13 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A LIVMO PH-I.pdf | 13 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LivMo Ph-I.pdf | 16 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LivMo Ph-I.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LivMo Ph-I.pdf | 12 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: LivMo Ph-I.pdf | 11 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A LIVMO PH-I.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Livmo Phase I.pdf | 24 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Livmo Phase I.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Livmo Phase I.pdf | 22 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Livmo Ph-I.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Livmo Ph-I.pdf | 16 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 LIVMO PH-I 01 APRIL 2022 TO 31 MARCH 2023.pdf | 5 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Livmo Ph-I Kami Jast Patra.pdf | 30 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 LIVMO PH-I SEP-23 071023_11zon.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A LivMO Ph-I SEPTEMBER-23.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 LivMO Ph-I SEPTEMBER-23.pdf | 18 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 LivMO Ph-I SEPTEMBER-23.pdf | 13 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: LIVMO PH-I Inventory.pdf | 12 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 LivMO Ph-I.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 LIVMO PH-I 070723_4_11zon.pdf | 20 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 Livmo Phase-I 2019-20_11zon.pdf | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Livmo Phase-I DEC-22_11zon.pdf | 16 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Livmo Ph-I DEC-22_11zon.pdf | 16 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 LivMO Ph-I GE 210 Priyanka Builders_001908.pdf | 28 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 LivMO PH-I_11zon.pdf | 11 Oct 2022 |
| Building plan approvalFile: 13-19_11zon.pdf | 30 Sep 2022 |
| Building plan approvalFile: 14-19_11zon.pdf | 30 Sep 2022 |
| Building plan approvalFile: 16-19_11zon.pdf | 30 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 13-19_11zon.pdf | 30 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 14-19_11zon.pdf | 30 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 16-19_11zon.pdf | 30 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 15-19_11zon.pdf | 30 Sep 2022 |
| Layout approvalFile: 1-19_Layout_11zon Rotated.pdf | 20 Sep 2022 |
| Copy of Layout Approval (in case of layout)File: 1-19_Layout_11zon Rotated.pdf | 20 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 121 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LIVMO PHASE I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hinjawadi Phase III13,700+ in Pune
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: PRIYANKA BUILDERS
PRIYANKA BUILDERS has 2 registrations on MahaRERA, including LIVMO PHASE I and LIVMO PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that LIVMO PHASE I shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if LIVMO PHASE I is delayed beyond 27 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LIVMO PHASE I?
The registered promoter entity is PRIYANKA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LIVMO PHASE I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against LIVMO PHASE I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for LIVMO PHASE I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LIVMO PHASE I?
The professionals named in the filing: Architect: Vka Architecture; Engineer: Akshay Nigade; Engineer: Dayanand Panchappa Sonkamble; Chartered Accountant: Madhusudan Jhanwar; Chartered Accountant: L. B. Laddha & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LIVMO PHASE I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.