LINKPARK

By ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED

RG-MH-27226 · RERA P51800005832 · Last updated on MahaRERA portal: 18 Apr 2025

Source: official MahaRERA filing

Red flags

  • 35 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 35%
35Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

LINKPARK is a Residential / Group Housing project by ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005832 on 14 Aug 2017. Possession is promised by 19 Oct 2026. 35 complaints are on record with the regulator.

At a glance

Project

  • NameLINKPARK
  • TypeResidential / Group Housing
  • Location
    • opp Link Road
    • Kanchpada
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005832
  • ReraGenie IDRG-MH-27226

Builder

  • NameADARSH INDUSTRIAL ESTATE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorJia Zhuowen Wei

Key dates

this monthRegisteredAug 2017PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion19 Oct 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed141 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LINKPARKNA400000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 35%.

LINKPARK: 10% average across the applicable activities

ActivityProgress
Excavation35%
Basement (if any)35%
Podiums (if any)7%
Plinth35%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed303

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots303
Closed/Covered303

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,629 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI26076.26
Proposed, not sanctioned16,328 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPart Graound Floor Landmark St Johns Road Pali Naka Pali Road Bandra West Mumbai 400050

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShyam J Hemrajani
PartnerRole in project
ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED-

Litigation declared4

CaseCourtStatus
1168/2010Metropolitan MagistratePending
871/2016Bombay City Civil CourtPending
1078/2018Bombay High CourtPending
469/2021Administrator and Divisional CommissionerPending

Complaints filed with MahaRERA35

Case no.ComplainantRespondentFiled
CC006000000055134Malti Ashok GuptaAdarsh Industrial Estate Pvt. Ltd.28/06/2018
CC006000000055215Sapna Ashok GuptaM/s Adarsh Industrial Estate Pvt. Ltd.03/07/2018
CC006000000055227Ms. Sonal AgarwalM/s Adarsh Industrial Estate Pvt. Ltd.04/07/2018
CC006000000056307SUDHIR KAUSHIK AND KAVITA KAUSHIKADARSH INDUSTRIAL ESTATE & AHUJA CONSTRUCTIONS LTD15/10/2018
CC006000000055926Goshar Infra Projects Pvt LtdADARSH INDUSTRIAL ESTATE PVT LTD24/08/2018
CC006000000057084Jagdish Kumar KaramchandaniAdarsh Industrial Estate Pvt Ltd30/11/2018
CC006000000110795Mohit D. Chedda and Dilip Nanji Chedda (HUF)M/s. Adarsh Industrial Estate Pvt. Ltd.05/09/2019
CC006000000197489Jetking Infotrain LimitedAdarsh Industrial Estate Private Limited05/07/2021
CC006000000221034Thailambal SubramaniamAdarsh Industrial Estate Pvt. Ltd03/05/2022
CC006000000251493SHAKUNTALA SHANTILAL SHAHADARSH INDUSTRIAL ESTATE PVT. LTD.18/06/2022
CC006000000251495MEENA KANAKRAJ JAINADARSH INDUSTRIAL ESTATE PVT. LTD.18/06/2022
CC006000000251558Karan Manohar ChoitramaniAdarsh Industrial Estate Pvt Ltd25/06/2022
CC006000000251559Karan Manohar ChoitramaniAdarsh Industrial Estate Pvt Ltd25/06/2022
CC006000000251714NARAYAN BHAGWANDAS AHUJAAdarsh Industrial Estate Pvt Ltd05/07/2022
CC006000000302912Veena Dwarkadas BajajAdarsh Industrial Estate Pvt. Ltd.03/10/2022
CC006000000395828Bhavesh Natwarlal GanatraM/s Adarsh Industrial Estate Pvt. Ltd.17/05/2023
CC006000000429354Bhavesh Natwarlal GanatraAdarsh Industrial Estate Private Limited21/02/2024
CC006000000429355Bhavesh Natwarlal GanatraAdarsh industrial Estate Pvt Ltd21/02/2024
CC006000000395917Hasmukh Vershi GalaAdarsh Industrial Estate Pvt. Ltd23/05/2023
CC006000000395927Paresh Kantilal GalaAdarsh Industrial Estate Pvt. Ltd24/05/2023
CC006000000396250chandni tannaAdarsh Industrial Estate Pvt Ltd15/06/2023
CC006000000396642Pankaj BehlHive Carbon Developers Private Limited09/07/2023
CC006000000591390Pankaj BehlAdarsh Industrial Estates Pvt. Ltd.01/08/2024
CC006000000397372NANDITA TRIPATHIADARSH INDUSTRIAL ESTATE PVT LTD05/09/2023
CC006000000397373NANDITA TRIPATHIADARSH INDUSTRIAL ESTATE PVT LTD06/09/2023
CC006000000397386DINESH TRIPATHI HUFADARSH INDUSTRIAL ESTATE PVT LTD06/09/2023
CC006000000397392DINESH TRIPATHI HUFADARSH INDUSTRIAL ESTATE PVT LTD07/09/2023
CC006000000397545Sonal Dinesh TekriwalADARSH INDUSTRIAL ESTATE P LTD22/09/2023
CC006000000397544Aman Manoj TekriwalADARSH INDUSTRIAL ESTATE P LTD22/09/2023
CC006000000429358MEETA BHAVESH GANATRAAdarsh Industrial Estate Private Limited21/02/2024
CC006000000429361MEETA BHAVESH GANATRAAdarsh Industrial Estate Private Limited21/02/2024
CC12500910Veena Dwarkadas BajajADARSH INDUSTRIAL ESTATE PRIVATE LIMITED15/03/2025
CC12500911Veena Dwarkadas BajajADARSH INDUSTRIAL ESTATE PRIVATE LIMITED15/03/2025
CC12500912Veena Dwarkadas BajajADARSH INDUSTRIAL ESTATE PRIVATE LIMITED16/03/2025
CC12601575BIPIN TAILORADARSH INDUSTRIAL ESTATE PRIVATE LIMITED21/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 19 Oct 2026

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Rehab Bldg - Mar 25.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Sale Bldg - Mar 25.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Rehab Bldg - Dec 24.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Sale Bldg - Dec 24.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Rehab Bldg - Sep 24.pdf18 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Sale Bldg - Sep 24.pdf18 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Rehab Bldg - Jun 24.pdf18 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Sale Bldg - Jun 24.pdf18 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Rehab Bldg - Mar 24.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Sale Bldg - Mar 24.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Rehab Bldg - Dec 23.pdf6 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Sale Bldg - Dec 23.pdf6 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Rehab Bldg - Sep 23.pdf7 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Sale Bldg - Sep 23.pdf7 Oct 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate for RERA Compliance - Linkpark Project Sept 23.pdf7 Oct 2023
Certificates of CA (Form 5)File: RERA Certificate Form no 5 of FY 2022-23 - Linkpark.pdf30 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Certificate Form no 5 of FY 2022-23 - Linkpark.pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Rehab Bldg - Jun 23.pdf7 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Sale Bldg - Jun 23.pdf7 Jul 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate for RERA Compliance - Linkpark Project Jun 23.pdf7 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Linkpark.pdf19 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Linkpark.pdf17 Apr 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate for RERA Compliance - Linkpark Project Mar 23.pdf7 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Rehab Bldg - Mar 23.pdf6 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Linkpark - Sale Bldg - Mar 23.pdf6 Apr 2023
Proforma of Allotment letterFile: Revised RERA Proposed Allotment Letter Linkpark.pdf21 Mar 2023
Deviation Report with respect to Allotment letterFile: Revised Deviation Sheet Allotment Letter Linkpark.pdf21 Mar 2023
Proforma of Allotment letterFile: RERA Allotment Letter Proposed Linkpark.pdf13 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Sheet Allotment Letter Linkpark.pdf13 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Rehab Bldg -Dec 22.pdf7 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Sale Bldg - Dec 22.pdf7 Jan 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate for RERA Compliance - Linkpark Project Dec 22.pdf7 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Linkpark - RERA Architect Certificate.pdf6 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Linkpark - RERA Architect Certificate.pdf6 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Sale Bldg - Sep 22.pdf7 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Rehab Bldg -Sep 22.pdf7 Oct 2022
Certificates of CA (Form 3)File: Form 3 CA Certificate for RERA Compliance - Linkpark Project Sept 22.pdf7 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Linkpark.pdf6 Oct 2022
Certificates of CA (Form 5)File: Form no 5 of FY 202122 Linkpark.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form no 5 of FY 202021 Linkpark.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form no 5 of FY 202122 Linkpark.pdf30 Sep 2022
Certificates of CA (Form 5)File: Form no 5 of FY 202122 Linkpark.pdf28 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Linkpark - Architect Certiifcate.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Rehab Bldg -June 22.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Sale Bldg -June 22.pdf7 Jul 2022
Certificates of CA (Form 3)File: Form 3 CA Certificate for RERA Compliance - Linkpark Project June 22.pdf7 Jul 2022
Certificates of CA (Form 3)File: Form 3 CA Certificate for RERA Compliance - Linkpark Project June 22.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Sale Bldg -Mar 22.pdf7 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Rehab Bldg -Mar 22.pdf7 Apr 2022
Certificates of CA (Form 3)File: FORM 3 LINKPARK.pdf7 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Linkpark - RERA Architect Certificate.pdf6 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Linkpark - RERA Architect Certificate.pdf6 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Rehab Bldg -Dec-21.pdf7 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Sale Bldg -Dec-21.pdf7 Jan 2022
Certificates of CA (Form 3)File: FORM 3 LINKINPARK.pdf7 Jan 2022
Proforma of Allotment letterFile: Link Park Draft Agreement - final updated amenities.pdf6 Dec 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate for RERA Compliance - Linkpark Project September 21.pdf7 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Linkpark - RERA Architect Certificate.pdf6 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Rehab Bldg -Sep-21.pdf6 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Sale Bldg -Sep-21.pdf6 Oct 2021
Certificates of CA (Form 5)File: FORM 5 Linkpark.pdf21 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Rehab Bldg -June-21.pdf13 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Linkpark - Sale Bldg -June-21.pdf13 Aug 2021
Certificates of CA (Form 3)File: Linkpark Form 3.pdf13 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6_LINKPARK- RERA Architect Certificate 30th June 2018.pdf9 Aug 2021
Details of encumbrancesFile: Adarsh -Details of Encumbrance-1.pdf1 Jul 2021
Certificates of CA (Form 3)File: Linkpark FORM 3.pdf25 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Linkpark Rehab.pdf21 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Linkpark Sale.pdf21 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6_LINKPARK- RERA Architect Certificate March21.pdf25 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5-LINKPARK PROJECT.pdf2 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: linkpark rehab Sept 20.pdf30 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: linkpark sale Sept 20.pdf30 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: linkpark rehab Dec 20.pdf30 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: linkpark sale Dec 20.pdf30 Mar 2021
Certificates of CA (Form 3)File: LINK PARK SEP 2020.pdf16 Mar 2021
Certificates of CA (Form 3)File: LINK PARK DEC 2020.pdf16 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LINKPARK- RERA Architect Certificate - Dec 2020.pdf25 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Linkpark Rehab - March 20.pdf16 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Linkpark sale - March 20.pdf16 Feb 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LINKPARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kanchpada6,700+ in Mumbai Suburban

2 kmLINKPARKCompleted 140Lapsed / revoked 85Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 376 registered projects within 2 km.

Builder: ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED

ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED has 1 registration on MahaRERA, including LINKPARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LINKPARK is delayed beyond 19 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LINKPARK?

The registered promoter entity is ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LINKPARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LINKPARK?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LINKPARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LINKPARK?

The professionals named in the filing: Architect: Shyam J Hemrajani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LINKPARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LINKPARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LINKPARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.