LIGHT HALL F WING
By Gamma Constructions Pvt Ltd
RG-MH-28481 · RERA P51800026229 · Last updated on MahaRERA portal: 28 Aug 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LIGHT HALL F WING is a Others project by Gamma Constructions Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800026229 on 30 Aug 2020. The registration is recorded completed; possession was promised by 30 Sep 2023.
At a glance
Project
- NameLIGHT HALL F WING
- TypeOthers
- Location
- SAKI VIHAR ROAD
- CHANDIVALI
- Kurla
- Mumbai Suburban
- 400072
- Pincode400072
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800026229
- ReraGenie IDRG-MH-28481
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on30 Aug 2020
- Promised completion30 Sep 2023
- Revised completionNone
- Buildings1 building record
- Documents filed62 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LIGHTHALL F WING | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
LIGHTHALL F WING: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| BALAJI TELEDEVELOPERS LLP | Andheri | Mumbai Suburban |
| SHOBHA KAPOOR | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PUSHKAR B SUTHAR of PUSHKAR CONSULTANTS |
| Engineer | C K PITHAWALLA |
| Chartered Accountant | SWATI H PATRAWALA of PATRAWALA AND CO |
| Chartered Accountant | PRABODH DESAI of P B DESAI AND CO |
| Partner | Role in project |
|---|---|
| Gamma Constructions Pvt Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Feb 2023
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: LIGHT HALL F Wing _Form 5_Rera _Gamma.pdf | 28 Aug 2023 |
| Status of ConveyanceFile: Lighthall F Conveyance Deed_Pg 1 to 30_compressed.pdf | 28 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: LIGHT HALL F Wing-Form V-Annual Report -till 31st March 2023.pdf | 4 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- LIGHTHALL F Wing- P51800026229 -dated 9th Feb 2023.pdf | 10 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LIGHT HALL - F Wing- Form 2 - Engg Certificate- dated 9th Feb 2023.pdf | 9 Feb 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4- ARC CERTIFICATE -Light Hall F Wing - dated 6th Feb 2023-1.pdf | 6 Feb 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Light Hall F Wing - Status of Society Formation - dated 6th Feb 2023.pdf | 6 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: F Wing -Full OC Letter - dated 3rd Feb 2023.pdf | 4 Feb 2023 |
| Other - TechnicalFile: FORM 4-Ar Rera Completion Certificate for Wing F- 12th Sep 2022.pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5- LightHall F Wing dated 31st March 2022.pdf | 1 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Engg Certificate_LIGHT HALL - F Wing- DS-12th Sep 2022.pdf | 17 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- Lighthall F Wing- CA certificate 12-09-2022.pdf | 17 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5- LightHall F Wing dated 31st March 2022.pdf | 17 Sep 2022 |
| Other - FinanceFile: FORM 5- LightHall F Wing dated 31st March 2022.pdf | 17 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Arc Rera Certificate for LightHall Wing F -till 30th June 2022.pdf | 6 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- LIGHT HALL F Wing till 30th June 2022.pdf | 6 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A-LIGHTHALL F Wing till 30th June 2022.pdf | 6 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Lighthall F Wing- CA certificate till 30th June 2022.pdf | 6 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: LightHall F Wing - OC -Letter _dated 20th June 2022.pdf | 6 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Rera Certificate - Light Hall Wing F- 4th April 2022.pdf | 10 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineers Rera Certificate - Light Hall F Wing - till 31st March 2022.pdf | 10 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- Certificate- LightHall F Wing - till 31st March 2022.pdf | 10 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- CA Certificate - Light Hall F Wing - till 31st March 2022.pdf | 10 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Ar Rera Certificate wing F dt 04-01-2022-com.pdf | 4 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- LIGHT HALL - F Wing- 31-12-2021.pdf | 4 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - Light Hall F Wing - 31-12-2021.pdf | 4 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- Lighthall F Wing - CA certificate 31-12-2021.pdf | 4 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Rera Certificate till 30th Sep 2021-comp.pdf | 5 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-LightHall F Wing - till 30th Sep 2021.pdf | 5 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- LightHall F Wing - till 30th Sep 2021.pdf | 5 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Lighthall F Wing- CA certificate 30th Sep 2021.pdf | 5 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: LightHall F Wing - Form V- Annual Report- till 31st March 2021.pdf | 15 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate- F Wing - Rera-till 31st July 2021.pdf | 14 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- LightHall F Wing- RERA- till 31-07-2021.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A - RERA Light Hall F - till 31st July 2021.pdf | 14 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certificate-till 31st July 2021.pdf | 14 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- ARCHITECT CERTIFICATE - F WING -31st May 2021-RERA.pdf | 11 Jun 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - LIGHT HALL - F Wing - 31st May 2021.pdf | 11 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 A - LIGHT HALL - F Wing - 31st May 2021.pdf | 11 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unit- 31st May 2021.pdf | 11 Jun 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- CA Certificate - LightHall F Wing - 31st May 2021.pdf | 11 Jun 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- Architect Work Completion Cert till 28th Feb 2021.pdf | 15 Mar 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineers Certificate - LightHall F Wing - till 28th Feb 2021.pdf | 15 Mar 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM - 2A- LIGHT HALL -F Wing -till 28th Feb 2021.pdf | 15 Mar 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Lighthall F Wing- CA Certificate till 28th Feb 2021.pdf | 15 Mar 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Rera -Architect Certificate - LightHall Wing F - till 30th Nov 2020-4th Dec.pdf | 11 Dec 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- LightHall F wing - till 30th Nov 2020.pdf | 11 Dec 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A - Light Hall - F Wing - till 30th Nov 2020-dated 1st Dec.pdf | 11 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lighthall F Wing - CA certificate till 30th Nov 2020.pdf | 11 Dec 2020 |
| Details of encumbrancesFile: Encumbrance Certificate -Gamma- F wing.pdf | 27 Aug 2020 |
| Declaration in FORM BFile: FORM B DECLARATION LightHall Wing F by Promoter.pdf | 27 Aug 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- CA certificate - Lighthall F Wing dated 27th Aug 2020.pdf | 27 Aug 2020 |
| Layout approvalFile: F WING _ APPROVAL _PROFORMA.pdf | 19 Aug 2020 |
| Building plan approvalFile: F WING_ TYPICAL FLOORS.pdf | 19 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: F WING _ APPROVAL _PROFORMA.pdf | 19 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: F WING_ TYPICAL FLOORS.pdf | 19 Aug 2020 |
| PAN CardFile: Pan Card - Gamma Const P Ltd.pdf | 14 Aug 2020 |
| Copy of the legal title reportFile: LightHall F Wing - Title Certificate - dated 23rd Dec 2019.pdf | 14 Aug 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - Wing F - dated 31st July 2020.pdf | 14 Aug 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- Architect Certificate - for Rera - Wing F.pdf | 14 Aug 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer Certificate - for Rera Registration - Wing F.pdf | 14 Aug 2020 |
| Proforma of Allotment letterFile: Allotment Letter -Term Sheet - LightHall F Wing-pdf.pdf | 14 Aug 2020 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| LIGHTHALL D WING | LIGHTHALL HIRANANDANI BUSINESS PARK SAKI VIHAR ROAD ANDHERI EAST MUMBAI 400072 | 1 | Completed | Dec 2018 | Jun 2018 |
| LIGHTHALL A B AND C WING | LIGHTHALL HIRANANDANI BUSINESS PARK SAKI VIHAR ROAD ANDHERI EAST MUMBAI 400072 | 20 | Completed | Aug 2015 | Aug 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
Keep LIGHT HALL F WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHANDIVALI6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 147 registered projects within 2 km.
AMARYLLIS TOWERS AND PLAZA
NAHAR BUILDERS LTD.
JANGID MEADOWS
JANGID HOME PVT LTD
NAHAR'S CHANDI VALLEY - PHASE I
NAHAR BUILDERS LIMITED
KABRA RESIDENCY PARK
AHINSA BUILDTECH PVT LTD
IBIS at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
BARBET at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
See every Mumbai Suburban project, with the district possession charts
Builder: Gamma Constructions Pvt Ltd
Gamma Constructions Pvt Ltd has 3 registrations on MahaRERA, including LIGHTHALL D WING and LIGHTHALL E WING. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if LIGHT HALL F WING is delayed beyond 30 Sep 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LIGHT HALL F WING?
The registered promoter entity is Gamma Constructions Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LIGHT HALL F WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for LIGHT HALL F WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LIGHT HALL F WING?
The professionals named in the filing: Architect: PUSHKAR B SUTHAR of PUSHKAR CONSULTANTS; Engineer: C K PITHAWALLA; Chartered Accountant: SWATI H PATRAWALA of PATRAWALA AND CO; Chartered Accountant: PRABODH DESAI of P B DESAI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LIGHT HALL F WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback