Home / Browse projects / Lifescapes Arihant
Lifescapes Arihant
RG-MH-25509 · RERA P51900005185 · Last updated on MahaRERA portal: 26 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 21 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 43 months
- 5 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Lifescapes Arihant is a Residential / Group Housing project by Rohan Developers Pvt Ltd in Prarthna Samaj, 400004, registered with MahaRERA as P51900005185 on 10 Aug 2017. Possession was promised by 31 Jan 2025 and is now 21 months past that date. The completion date has moved by 43 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameLifescapes Arihant
- TypeResidential / Group Housing
- Location
- VP Road
- Prarthna Samaj
- 400004
- Pincode400004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900005185
- ReraGenie IDRG-MH-25509
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 Aug 2017
- Promised completion31 Jan 2025
- Revised completionRevised to 31 Jan 2025 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed125 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Lifescapes Arihant | NA | 26 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
Lifescapes Arihant: 97% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 94% |
| Podiums (if any) | 100% |
| Plinth | 94% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 26 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 75% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed72
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/s Kadakia N.K. |
| Architect | M/s Design Group |
| Engineer | M/s Dr. Kelkar Designs Pvt. Ltd. |
| Engineer | Suresh Appa Patil |
| Chartered Accountant | A.K. Yadav & Associates |
| Chartered Accountant | Anand A Yadav & Associates |
| Partner | Role in project |
|---|---|
| Rohan Developers Pvt Ltd | - |
Extensions applied for5
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Project is near completion and finishing is going on at full swing. We request for the period of 6 months till 30/06/2023 and the allottees have given their consents for the same which is attached herewith for your perusal please!
Reason as filed by the promoterDear Sir, we have completed about 70 % of our super structure. However, due to the break in construction due to covid-19, we are facing several obstacles in adhering to our original timelines due to practical and financial issues due to the covid induced lockdowns. hence we request your goodself to kindly grant us an extension for 1 year for completion of the project.
Reason as filed by the promoterDue to some earlier delays in obtaining approvals from various regulatory authority at the desired timeline, the project execution has been delayed as the civil contractor demobilised number of labourers from the site. Later on, he was not able to remobilise the labour force as per site needs due to which the timelines for other activities of finishing, lift fitting, etc have been delayed accordingly. Now all aspects till obtaining occupation certificate have been lined up and 8 to 9 months are needed to complete the project and obtain OC. Hence Rohan Developers Pvt. Ltd. is seeking 9 month (t
Reason as filed by the promoterDue to some earlier delays in obtaining approvals from various regulatory authorities in the expected timelines, the project execution was already delayed. Construction activities had slowed down and had significantly impacted the project progress due to shortage of labour and material supply during Covid-19 Pandemic. During pandemic, the civil contractor demobilised majority of the labourers from the site. Later on, he was not able to remobilise the labour force as per site needs due to which the timelines for other activities of finishing, lift fitting, etc have been delayed accordingly. As
Reason as filed by the promoterOver the past nine months, a significant number of Government Staffs were assigned to election duties for the Lok Sabha and Maharashtra Assembly Elections. As a result, there has been a shortage of staff in various government departments, causing delays in obtaining the required approval including Occupation Certificate within the expected timeline. The construction of Project Lifescapes Arihant is nearly completed. Currently, we are actively working to obtain the Occupation Certificate and anticipate completing the project within the next three months. In light of this, Rohan Developers Pvt.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000193041 | RIYAL ANAND JAVKAR | ROHAN JITENDRA MEHTA | 15/03/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed125
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A_Arihant_FY 24-25_Signed.pdf | 26 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5_Arihant_FY 2024-25.pdf | 16 Dec 2025 |
| Form 1File: Arihant_Form -1 Q-4 _24-25.pdf | 25 Nov 2025 |
| Form 2File: FORM 2 - Arihant - Q4 24-25.pdf | 25 Nov 2025 |
| Form 3File: RERA_Form 3_Arihant_Q4_FY 24-25.pdf | 25 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Arihant Inventory Disclosure - Q-4 2024-25.pdf | 25 Nov 2025 |
| Certificates of CA (Form 3)File: RERA_Form 3_Arihant_Q3_FY 24-25.pdf | 27 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form -1 Q-3 - 24-25.pdf | 24 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q3 24-25.pdf | 24 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure_Arihant_Q3 FY 2024-25.pdf | 24 Feb 2025 |
| Declaration in FORM BFile: Form B - Arihant 31012025.pdf | 10 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration of RERA Bank account.pdf | 10 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_HNM.pdf | 10 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_MHM.pdf | 10 Dec 2024 |
| Certificates of CA (Form 3)File: Arihant_Form 3_Q1_FY 24-25.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: Arihant_Form 3_Q2_FY 24-25.pdf | 30 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Arihant_Inventory Disclosure_Q1 FY 24-25.pdf | 30 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Arihant_Inventory Disclosure_Q2 FY 24-25.pdf | 30 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Arihant_FY 23-24.pdf | 30 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form -1 Q-2 - 24-25.pdf | 21 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q1 24-25.pdf | 21 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q2 24-25.pdf | 21 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form -1 Q-1 - 24-25.pdf | 14 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form -1 Q-4 - 23-24.pdf | 8 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q4 23-24.pdf | 8 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - Arihant - 2023-2024.pdf | 8 Aug 2024 |
| Certificates of CA (Form 3)File: Form -3 Lifescapes Arihant _Q4_FY 23-24.pdf | 8 Aug 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Appointment Letter - GRO - Arihant.pdf | 2 Aug 2024 |
| Declaration in FORM BFile: Affidavit cum declaration Form B.pdf | 15 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Arihant_Inventory Disclosure - Q-4 2023-24.pdf | 15 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form -1 Q-3 - 23-24.pdf | 18 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q3 23-24.pdf | 18 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Arihant_Inventory Disclosure_Q3 FY 23-24.pdf | 18 Mar 2024 |
| Certificates of CA (Form 3)File: Arihant Q3_Form 3 Lifescapes FY 23-24.pdf | 18 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form -1 Q-2 - 23-24.pdf | 12 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Arihant_Inventory Disclosure_Q2 FY 23-24.pdf | 29 Feb 2024 |
| Certificates of CA (Form 3)File: FORM 3 Lifescapes Arihant-Q-2.pdf | 29 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q2 23-24.pdf | 23 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Arihant_Inventory Disclosure - Q1 2023-24.pdf | 12 Feb 2024 |
| Certificates of CA (Form 3)File: FORM 3-LIFESCAPES ARIHANT-Q 1.pdf | 12 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q1 23-24.pdf | 4 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form 1_Q1_FY 23-24.pdf | 28 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q1 22-23.pdf | 4 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Arihant 31_05_2023.pdf | 26 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Arihant 31_03_2023 - Q4.pdf | 22 Jun 2023 |
| Certificates of CA (Form 3)File: LIFESCAPES Arihant_FY22-23_Q1.pdf | 21 Jun 2023 |
| Certificates of CA (Form 3)File: RERA_Form 3_Arihant_Q3_FY 22-23.pdf | 21 Jun 2023 |
| Certificates of CA (Form 3)File: FORM 3-LIFESCAPES ARIHANT -Q 4.pdf | 21 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-LIFESCAPES ARIHANT-2022-23.pdf | 21 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form -1 Q-1 - 22-23.pdf | 20 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form -1 Q-3 - 22-23.pdf | 20 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form -1 Q-4 - 22-23.pdf | 20 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q4 22-23.pdf | 20 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - Arihant - 2022-2023.pdf | 20 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q3 22-23.pdf | 20 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2 - Arihant - Q3 22-23.pdf | 20 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY DISCLOSURE.pdf | 4 Feb 2023 |
| Certificates of CA (Form 3)File: Arihant-FORM 3 Q2 FY 202223 comp.pdf | 31 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant_Form -1 Q-2 - 22-23.pdf | 30 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - Arihant - Q2 22-23.pdf | 30 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: LIFESCAPES ARIHANT FORM 5 FY2021-22_comp.pdf | 30 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Allottment Letter.pdf | 30 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Model form of Agreement.pdf | 30 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: LIFESCAPES ARIHANT FORM 5 FY2021-22_comp.pdf | 25 Jan 2023 |
| Declaration about Commencement CertificateFile: hENDRE.pdf | 17 May 2022 |
| CERSAI detailsFile: CERSAI.pdf | 17 May 2022 |
| CERSAI detailsFile: Cersai.pdf | 17 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf | 17 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019- 20.pdf | 17 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf | 17 May 2022 |
| Building plan approvalFile: Arihant IOD.PDF | 11 May 2022 |
| Building Plan Approval (IOD)File: Arihant IOD.PDF | 11 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3.pdf | 11 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4.pdf | 11 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3.pdf | 11 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4.pdf | 11 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RERA Arihant Form2A Q4.pdf | 11 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA Arihant Form2A Q4.pdf | 11 May 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD ARIHANT 07-04-2022.pdf | 11 May 2022 |
| Certificates of CA (Form 3)File: Q3.pdf | 11 May 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Lifescapes Aashiana | Nepean Sea Road | 41 | Completed | Dec 2014 | Late, Jun 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 125 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Lifescapes Arihant on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Prarthna Samaj
Filed coordinates, straight-line distance. 70 registered projects within 2 km.
SHREEPATI CASTLE
SHREEPATI CASTLE
Meadows
Celestial Globe (A.O.P.)
SHREEPATI BAYVIEW
SHREEPATI BUILD INFRA INVESTMENT LIMITED
NAKODA MEHTA SUNSHINE HEIGHTS A AND C WINGS
CHANDULAL JORAVARMALJI MEHTA
Earth Enclave
Earth Graphics
Chandan Signature
PAVAN KUMAR BACHHRAJ CHANDAN
Builder: Rohan Developers Pvt Ltd
Rohan Developers Pvt. Ltd. has 5 registrations on MahaRERA, including Lifescapes Mirage and 7 Hughes. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record.
Frequently asked questions
What does it mean that Lifescapes Arihant shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Lifescapes Arihant is delayed beyond 31 Jan 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Lifescapes Arihant?
The registered promoter entity is Rohan Developers Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Lifescapes Arihant?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Lifescapes Arihant?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Lifescapes Arihant?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Lifescapes Arihant?
The professionals named in the filing: Architect: M/s Kadakia N.K.; Architect: M/s Design Group; Engineer: M/s Dr. Kelkar Designs Pvt. Ltd.; Engineer: Suresh Appa Patil; Chartered Accountant: A.K. Yadav & Associates; Chartered Accountant: Anand A Yadav & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Lifescapes Arihant?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback