Home / Browse projects / Pune, Maharashtra / LIFE REPUBLIC SECTOR R9-ORO AVENUE

Completed No litigation declared Others project

LIFE REPUBLIC SECTOR R9-ORO AVENUE

By KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED

RG-MH-98194 · RERA P52100017116 · Last updated on MahaRERA portal: 9 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2024Possession promisedregistration recorded completed
65 of 66Construction stages doneacross 6 buildings; furthest along: Staircases, 0%
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

LIFE REPUBLIC SECTOR R9-ORO AVENUE is a Others project by KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100017116 on 13 Jul 2018. The registration is recorded completed; possession was promised by 31 Jul 2024.

At a glance

Project

  • NameLIFE REPUBLIC SECTOR R9-ORO AVENUE
  • TypeOthers
  • Location
    • HINJEWADI-MARUNJI-KASARSAI ROAD
    • JAMBE
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100017116
  • ReraGenie IDRG-MH-98194

Builder

  • NameKOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED
  • Entity typeCompany
  • DirectorYashvardhan Patil
  • Other registrations11 more →
  • Completed7 of 12
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2018PromisedJul 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Jul 2018
  • Promised completion31 Jul 2024
  • Revised completionNone
  • Buildings6 building records
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA250000
Building BNA250000
Building CNA250000
Building DNA250000
Building ENA250000
ShopsNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 9 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

65 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 0%.

Building A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Shops91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed977

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots977
Closed/Covered586
Open Space391
BuildingClosed/CoveredOpen SpaceTotal
Building A9479173
Building B9578173
Building C9578173
Building D9578173
Building E20778285

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area30,697 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI61009.96
Proposed, not sanctioned50,028 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1st Floor Shop No 103 Plot B Icon Tower Survey 114 and 115 Plot B Baner Rd Pune-411043

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Designers Syndicate
EngineerJW Consultant LLP
Chartered AccountantVIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS
PartnerRole in project
KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED-

Litigation declared14

CaseCourtStatus
SPL CS No 265/2013/2013CJJDThe matter is pending adjudication and is pending at evidence stage
RCS No 1487/2005/2005CJJDThe matter is pending adjudication and is currently fixed for evidence
SPL CS 2255/2009/2009CJSDThe matter is pending adjudication and is currently fixed for framing additional issues
SPL CS 575/2015/2015CJSDdisposed off
SLP CC No 9467/2017/2017Supreme Courtdisposed off
SLP CC No 9463/2017/2017Supreme Courtdisposed off
421/2016/2016CJSDCurrently the suit is pending for withdrawal or dismissal
11697/2017/2017High CourtCurrently the matter is pending for admission
11701/2017/2017High CourtCurrently the matter is pending for admission
11702/2017/2017High CourtCurrently the matter is pending for admission
WPST 31252/2017/2017High CourtThe matter is yet to come up for hearing before court Current stage is pre admission for circulation
RCS 1689/2021/2021CJJDCurrently the matter is posted for filing of written statement
Civil MA 372/2022/2022CJSD PuneAppearance and Filing of Say
7264/2022Bombay High CourtAdmission

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Mar 2024

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: R9.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: R9.pdf9 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: R9 A Completion Certificate.pdf20 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - R9.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R9.pdf19 Jan 2024
Certificates of CA (Form 3)File: R9.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R9_oro avenue.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector R9.pdf20 Oct 2023
Certificates of CA (Form 3)File: CA R9_compressed.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R9 - oro.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: LR R9.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LIFE REPUBLIC SECTOR R9-ORO AVENUE.pdf20 Jul 2023
Certificates of CA (Form 3)File: LR R9-compressed.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LR R9.pdf17 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: R9 part OC.pdf17 Jul 2023
Proforma of Agreement for saleFile: 22-05-2023- FINAL-Draft AFS-ALL SHOPS-LR-R9 -AFS-OC revision track mode.pdf15 Jun 2023
Proforma of Agreement for saleFile: 22-05-2023-FINAL-Draft AFS-Building A-LR-R9 -AFS-OC revision in track mode.pdf15 Jun 2023
Proforma of Agreement for saleFile: 22-05-2023-FINAL-Draft AFS-Building-B, C, D and E -LR-R9 -AFS - OC revision.pdf15 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LR R9.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R9.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: R9 Oro Avenue Final Inv Declaration.pdf20 Apr 2023
Certificates of CA (Form 3)File: R9_compressed.pdf20 Apr 2023
CERSAI detailsFile: Cersai File.pdf15 Apr 2023
Proforma of Agreement for saleFile: AFS LR R9 Shops.pdf28 Feb 2023
Proforma of Agreement for saleFile: AFS R9 B and D Buildings and Shops.pdf28 Feb 2023
Proforma of Agreement for saleFile: AFS R9 Residential Buildings.pdf28 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cer LR R9.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LR R9 Form 2.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Final R9 Oro Avenue.pdf20 Jan 2023
Certificates of CA (Form 3)File: CA R9 Oro Avenue.pdf20 Jan 2023
CERSAI detailsFile: Final Cersai File.pdf16 Jan 2023
Disclosure of sold/ booked inventoryFile: R9 Oro Avenue.pdf20 Oct 2022
Certificates of CA (Form 3)File: Form 3 R 9 _compressed.pdf20 Oct 2022
CERSAI detailsFile: Cersai Report.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SECTOR R 9 BLDG A B C D E SHOPS.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: LR -R9 Oro Avenue.pdf30 Sep 2022
Other - FinanceFile: LR -R9 Oro Avenue.pdf29 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch - R9.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R 9.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Inventory Declaration R9 Oro Avenue.pdf7 Jul 2022
CERSAI detailsFile: KPIT Cersai details.pdf4 Jul 2022
Disclosure of sold/ booked inventoryFile: R9 Oro Avenue.pdf18 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_LR R9.pdf12 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_LR R9.pdf7 Apr 2022
Certificates of CA (Form 3)File: CA_LR R9_compressed.pdf7 Apr 2022
CERSAI detailsFile: KPIT Cersai.pdf6 Apr 2022
Proforma of Allotment letterFile: AFS_RESI_APT_LR_R9_AFS_.pdf10 Feb 2022
Proforma of Allotment letterFile: AFS_SHOPS_LR_R9 _AFS _Title report handover clause_compressed.pdf10 Feb 2022
Proforma of Allotment letterFile: AFS_Building_B D_SHOPS_LR_R9 _AFS_Title report handover clause_compressed.pdf10 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate R9.pdf20 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHITECTS R-9_compressed.pdf18 Jan 2022
Disclosure of sold/ booked inventoryFile: LR R-9 A to E bldg.pdf12 Jan 2022
CERSAI detailsFile: KPIT Cersai details.pdf7 Jan 2022
Certificates of CA (Form 3)File: R9 ORO COMPRESSED-compressed.pdf7 Jan 2022
Proforma of Allotment letterFile: FINAL-Draft AFS-Building-B, D-SHOPS-LR-R9 -AFS -26-10-2021.pdf28 Oct 2021
Proforma of Allotment letterFile: AFS_RESI_ APT_LR_R9_AFS 26102021.pdf28 Oct 2021
Proforma of Allotment letterFile: AFS_SHOPS_LR_R9_AFS26102021.pdf28 Oct 2021
Disclosure of sold/ booked inventoryFile: R 9 Inven decla-compressed.pdf21 Oct 2021
Disclosure of sold/ booked inventoryFile: R 9 Inventory declaration.pdf11 Oct 2021
Certificates of CA (Form 3)File: Form 3 sep 21 R9.pdf8 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SIGNED FORM 5 LR R9.pdf30 Sep 2021
PAN CardFile: Self attested PAN.pdf22 Sep 2021
Declaration about Commencement CertificateFile: R 9 declaration commencement.pdf22 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: R 9 declaration NA quality assurance.pdf22 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: R 9 declaration NA quality assurance.pdf22 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: R9 Oro March 19 form 5.pdf22 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sector R9 RERA Certificate - FY 2019-20.pdf22 Sep 2021
Proforma of Allotment letterFile: AFS-SHOPS-LR-R9 -AFS -20-07-2021_compressed.pdf22 Jul 2021
Proforma of Allotment letterFile: AFS-Building-B, D-SHOPS-LR-R9 -AFS -20-07-2021_compressed.pdf22 Jul 2021
Proforma of Allotment letterFile: AFS_RESI APT LR R9.pdf22 Jul 2021
Details of encumbrancesFile: Encumbrance update july R9.pdf7 Jul 2021
Proforma of Allotment letterFile: FINAL-Draft AFS-SHOPS-LR-R9 -AFS -30-06-2021.pdf2 Jul 2021
Proforma of Allotment letterFile: FINAL-Draft AFS-Building-B, D-SHOPS-LR-R9 -AFS -30-06-2021.pdf2 Jul 2021
Proforma of Allotment letterFile: AFS RESI APT LR R9.pdf2 Jul 2021
Annual Audit Report of Statutory CA (Form 5)File: 12061 KPIT - LR-Sector R9 RERA Certificate - FY 2019-20.pdf30 Sep 2020
Layout approvalFile: 1-12 Layout R9.pdf24 Sep 2020
Copy of Layout Approval (in case of layout)File: 1-12 Layout R9.pdf24 Sep 2020
Proforma of Allotment letterFile: FINAL-AFS-Building-B, D-SHOPS-LR-R9 -AFS -13-01-2020.pdf21 Jan 2020
Proforma of Allotment letterFile: FINAL-AFS-RESI APT-LR-R9 -AFS -13-01-2020.pdf21 Jan 2020
Proforma of Allotment letterFile: FINAL-AFS-SHOPS-LR-R9 -AFS -13-01-2020.pdf21 Jan 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Life Republic Sector R4Marunji Hinjewadi Pune660CompletedDec 2015Late, Dec 2016
Life Republic Sector R2 Phase IMarunji Hinjewadi Pune120CompletedDec 2013Dec 2013

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LIFE REPUBLIC SECTOR R9-ORO AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JAMBE13,700+ in Pune

Builder: KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED

KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED has 12 registrations on MahaRERA, including Life Republic Sector R2 - 2nd Avenue and Life Republic Sector R16 - 16th Avenue. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if LIFE REPUBLIC SECTOR R9-ORO AVENUE is delayed beyond 31 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LIFE REPUBLIC SECTOR R9-ORO AVENUE?

The registered promoter entity is KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LIFE REPUBLIC SECTOR R9-ORO AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LIFE REPUBLIC SECTOR R9-ORO AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LIFE REPUBLIC SECTOR R9-ORO AVENUE?

The professionals named in the filing: Architect: Space Designers Syndicate; Engineer: JW Consultant LLP; Chartered Accountant: VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LIFE REPUBLIC SECTOR R9-ORO AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LIFE REPUBLIC SECTOR R9-ORO AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LIFE REPUBLIC SECTOR R9-ORO AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.