Home / Browse projects / Pune, Maharashtra / Life Republic Sector R3/3rd Avenue-E Building

Completed No litigation declared Residential / Group Housing project

Life Republic Sector R3/3rd Avenue-E Building

By KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED

RG-MH-43606 · RERA P52100016987 · Last updated on MahaRERA portal: 29 Sep 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 80%
1Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

Life Republic Sector R3/3rd Avenue-E Building is a Residential / Group Housing project by KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100016987 on 26 Jun 2018. The registration is recorded completed; possession was promised by 30 Dec 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLife Republic Sector R3/3rd Avenue-E Building
  • TypeResidential / Group Housing
  • Location
    • Hinjewadi-Marunji-Kasarsai Road
    • Pune
    • Jambe
    • Mulshi
    • 411057
  • Pincode411057
  • RERA no.P52100016987
  • ReraGenie IDRG-MH-43606

Builder

  • NameKOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED
  • Entity typeCompany
  • DirectorYashvardhan Patil
  • Other registrations11 more →
  • Completed7 of 12
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2018PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Jun 2018
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ENA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

Building E: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 29 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed282

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots282
Closed/Covered231
Open Space51

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,881 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17111.74
Proposed, not sanctioned17,112 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1st Floor Shop No 103 Plot B Ikon Tower Survey 114 and 115 Plot B Baner Road Pune 411043

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Designers Syndicate
EngineerJW Consultant LLP
PartnerRole in project
KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED-

Litigation declared14

CaseCourtStatus
SPL CS No 265/2013/2013CJJDThe matter is pending adjudication and is pending at evidence stage
RCS No 1487/2005/2005CJJDThe matter is pending adjudication and is currently fixed for evidence
2255/2009/2009CJSDThe matter is pending adjudication and is currently fixed for framing additional issues
SPL CS 575/2015/2015CJSDFraming of issues by Honourable court
SLP CC No 9467/2017/2017Supreme CourtCurrently the matter is pending for final argument
SLP CC No 9463/2017/2017Supreme CourtCurrently the matter is pending for final argument
421/2016/2016CJSDCurrently the suit is pending for withdrawal or dismissal The plaintiff has filed withdrawal purshis
11697/2017/2017High CourtCurrently the matter is pending for admission
11701/2017/2017High CourtCurrently the matter is pending for admission
11702/2017/2017High CourtCurrently the matter is pending for admission
WPST 31252/2017/2017High CourtThe matter is yet to come up for hearing before court Current stage is pre admission for circulation
RCS 1689/2021/2021CJJDCurrently the matter is posted for filing of written statement
Civil MA 372/2022/2022CJSD PuneAppearance and Filing of Say
7264/2022Bombay High CourtAdmission

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000198133Anjnee kumar sharmakolte patil integrated township15/02/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Jan 2023

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: LR R3 E.pdf29 Sep 2023
Proforma of Agreement for saleFile: LR R3 E Building AFS.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R3E_Q3 Form 2.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: R3 E Building.pdf20 Jan 2023
Certificates of CA (Form 3)File: CA R3 E building.pdf20 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sector R3_E Building Completion Certificate.pdf18 Jan 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 -R3 E.pdf18 Jan 2023
CERSAI detailsFile: Final Cersai File.pdf16 Jan 2023
Disclosure of sold/ booked inventoryFile: Life Republic R3 E building.pdf20 Oct 2022
Certificates of CA (Form 3)File: FROM 3_R3 E.pdf20 Oct 2022
CERSAI detailsFile: Cersai Report.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SECTOR R 3 BLDG E.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: LR 3RD Avenue E Building.pdf30 Sep 2022
Other - FinanceFile: LR 3RD Avenue E Building.pdf29 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch - R3 E.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R 3 E.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Inventory Declaration 3rd Avenue E Building.pdf7 Jul 2022
Certificates of CA (Form 3)File: CA - R3 E_compressed.pdf7 Jul 2022
CERSAI detailsFile: KPIT Cersai details.pdf4 Jul 2022
Proforma of Allotment letterFile: AFS LR-R3 E Building_compressed.pdf30 Jun 2022
Disclosure of sold/ booked inventoryFile: R3 3Avenue E building.pdf18 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_LR R3 E.pdf12 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_LR R3 E.pdf7 Apr 2022
Certificates of CA (Form 3)File: CA_LR R3 E_compressed.pdf7 Apr 2022
CERSAI detailsFile: KPIT Cersai.pdf6 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: JAMBE SECTOR-R-3 REVISED SANCTION PMRDA ORDER.pdf21 Jan 2022
Declaration about Commencement CertificateFile: LR Sec R-3 E _commencement revised declaration.pdf21 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate LR R3 3Avenue E Building.pdf20 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHITECTS CERTIFICATE JAMBE SECTOR-R-3, BLDG-E.pdf18 Jan 2022
Disclosure of sold/ booked inventoryFile: LR R3 _ E BUILDING.pdf12 Jan 2022
Certificates of CA (Form 3)File: R3 3RD AVENUE.pdf7 Jan 2022
Proforma of Allotment letterFile: 26-10-2021-FINAL-AFS-LR- R3 -Building E.pdf28 Oct 2021
Disclosure of sold/ booked inventoryFile: R 3 E bldg Inventory sold declaration 30 sep 21.pdf19 Oct 2021
Certificates of CA (Form 3)File: Form 3 sep 21 R3 E.pdf13 Oct 2021
Certificates of CA (Form 3)File: Form 3 sep 21 C1.pdf8 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 LR R3E 2020-21.pdf30 Sep 2021
PAN CardFile: Self attested PAN.pdf22 Sep 2021
Declaration about Commencement CertificateFile: R 3 E bldg commencement declaration.pdf22 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: R3 E bldg declaration NA quality assurance.pdf22 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: R3 E bldg declaration NA quality assurance.pdf22 Sep 2021
Disclosure of sold/ booked inventoryFile: R 3 E bldg inventory declaration.pdf22 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: R3 E March 19 Form 5.pdf22 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sector R3-E RERA Certificate - FY 2019-20.pdf22 Sep 2021
Proforma of Allotment letterFile: FINAL-AFS-LR- R3 -Building E_compressed.pdf22 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Life Republic R3 - Society Registration Certificate.pdf5 Jul 2021
Proforma of Allotment letterFile: FINAL-AFS-LR- R3 -Building E - 30-06-2021_compressed(1).pdf1 Jul 2021
Annual Audit Report of Statutory CA (Form 5)File: 12051 KPIT - LR-Sector R3-E RERA Certificate - FY 2019-20.pdf30 Sep 2020
Proforma of Allotment letterFile: LR- R3 -Building E.pdf21 Jan 2020
Proforma of Allotment letterFile: 15-12-2019-FINAL-LR- R3 -Building E-.pdf7 Jan 2020
Annual Audit Report of Statutory CA (Form 5)File: Signed certificate LR R3 E March 19.pdf30 Sep 2019
Proforma of Allotment letterFile: Revised Allotment Letter and Application Form Life Republic.pdf29 Oct 2018
Proforma of Allotment letterFile: AFS Life Republic Sector R3-E Building.pdf4 Sep 2018
Building plan approvalFile: Sanction plan R3 E building.pdf22 Jun 2018
Layout approvalFile: Sanction plan R3 E building.pdf22 Jun 2018
Copy of the legal title reportFile: Search and Title Report.pdf22 Jun 2018
Details of encumbrancesFile: Details of Encrumbances Sector R3 Ebuilding.pdf22 Jun 2018
Copy of Layout Approval (in case of layout)File: Sanction plan R3 E building.pdf22 Jun 2018
Building Plan Approval (IOD)File: Sanction plan R3 E building.pdf22 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate R3 E building.pdf22 Jun 2018
Declaration in FORM BFile: Affidavit cum Declaration Sector R3.pdf22 Jun 2018
Certificates of CA (Form 3)File: R3_E-Building,CA Certificate.pdf22 Jun 2018
Proforma of Allotment letterFile: Self Declaration_Agreement Sector R3 Building.pdf22 Jun 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Life Republic Sector R4Marunji Hinjewadi Pune660CompletedDec 2015Late, Dec 2016
Life Republic Sector R2 Phase IMarunji Hinjewadi Pune120CompletedDec 2013Dec 2013

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Life Republic Sector R3/3rd Avenue-E Buildin on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

Builder: KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED

KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED has 12 registrations on MahaRERA, including Life Republic Sector R2 - 2nd Avenue and Life Republic Sector R16 - 16th Avenue. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Life Republic Sector R3/3rd Avenue-E Building is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Life Republic Sector R3/3rd Avenue-E Building?

The registered promoter entity is KOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Life Republic Sector R3/3rd Avenue-E Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Life Republic Sector R3/3rd Avenue-E Building?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Life Republic Sector R3/3rd Avenue-E Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Life Republic Sector R3/3rd Avenue-E Building?

The professionals named in the filing: Architect: Space Designers Syndicate; Engineer: JW Consultant LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Life Republic Sector R3/3rd Avenue-E Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Life Republic Sector R3/3rd Avenue-E Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Life Republic Sector R3/3rd Avenue-E Buildin to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.