Registration lapsed No litigation declared Residential / Group Housing project

Life Republic/Sector R10/10th Avenue/Universe/Phase III

By KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED

RG-MH-27692 · RERA P52100034733 · Last updated on MahaRERA portal: 4 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
20 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 0%
2 of 326Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Life Republic/Sector R10/10th Avenue/Universe/Phase III is a Residential / Group Housing project by KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100034733 on 20 Apr 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 324 of the 326 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameLife Republic/Sector R10/10th Avenue/Universe/Phase III
  • TypeResidential / Group Housing
  • Location
    • Survey no 74 hinjewadi-marunji-kasarsai road taluka mulshi
    • Jambe
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100034733
  • ReraGenie IDRG-MH-27692

Builder

  • NameKOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorRAHUL TALELE
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live3 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredApr 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on20 Apr 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed72 files

Current status

99%324 of 326 units booked
89.2%Work done, per cost certificate

Figures as on 4 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building BNA25251650165
Building CNA25251610161

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.

Building B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed326

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots326
Closed/Covered326
BuildingClosed/CoveredTotal
Building B165165
Building C161161

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,606 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Kolte-Patil Integrated Townships LimitedJambePune
Pradeep KoltePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI22724.96
Proposed, not sanctioned22,725 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMillennium Star, Sasoon Road, Dhole Patil Rd, Pune 411001
Estimated costRs 101.83 cr
Cost incurredRs 90.82 cr
Work done89.19%
BuildingWingEstimatedIncurred
Building CNARs 34.60 crRs 33.22 cr
Building BNARs 34.47 crRs 31.94 cr
-NARs 32.77 crRs 25.66 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKolhatkar and Gowikar
EngineerKaustubh Kale
Chartered AccountantCA Nikita Bajaj
Chartered AccountantVIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS
PartnerRole in project
KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12604038KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITEDSavita Suresh Chandwani29/06/2026
CC12604055KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITEDBabasaheb Anandrao Balshankar29/06/2026
CC12604105KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITEDAjit Shashikant Pradhan01/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 251231_ Details_Life Republic_R10 Sector_Phase III- B C Building.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2 R10 Phase III.pdf4 Feb 2026
Withdrawal Update Form 3File: From3 R10 Phase III.pdf4 Feb 2026
Withdrawal Update Form 1File: 250630_ Details_Life Republic_R10 Sector_Phase III- B C Building.pdf7 Jan 2026
Withdrawal Update Form 1File: 250930_ Details_Life Republic_R10 Sector_Phase III- B C Building.pdf7 Jan 2026
Withdrawal Update Form 2File: Form-2 R10 Phase-3.pdf7 Jan 2026
Withdrawal Update Form 2File: Form-2 R10 Phase-3.pdf7 Jan 2026
Withdrawal Update Form 3File: R10 Phase-3.pdf7 Jan 2026
Withdrawal Update Form 3File: Form-3 R10 Phase-3.pdf7 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 LR R10 Phase-3.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 LR R10 Phase-3.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 250331_ Details_Life Republic_R10 Sector_Phase III- B C Building.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 241231_ Details_Life Republic_R10 Sector_Phase III- B C Building.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 R10 Phase-III.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form-2 R10 Phase-III.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 LR R10 Phase-III.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 R10 Phase-III.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240930_ Details_Life Republic_R10 Sector_Phase III- B C Building.pdf16 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: R10 PHASE III.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R10 - Phase 3.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 R10 Phase-III.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 R10 Phase III.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R10-Phase 3 signed form-2.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 R10 Phase 3.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240331_ Details_Life Republic_R10 Sector_Phase III- B C Building.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R10 Phase 3 Project.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R10-Phase 3.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R10_Phase 3.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R10 Phase III Signed Form 2.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R10-III.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R10_Phase 3.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: KP Planet Phase III certificate.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Life Republic Sector R 10 - 10th Avenue - Phase 3 New Registration - Uploaded.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Life Republic Sector R 10 - 10th Avenue - Phase 3 New Registration - Uploaded.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R10 Ph III.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R10 Phase III.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: KP Planet Phase 3 Final Inv Dec.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R10 Ph III.pdf19 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R10 Ph III form3 signed.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R10 Phase III.pdf15 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200266191206_For_Debtor_Based_Search_15_04_2023_17_01_01_380.pdf15 Apr 2023
Proforma of Agreement for saleFile: AFS KP Planet Phase III.pdf28 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LR R10 Phase III Form 2.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Final KP Planet Phase 3 In Dec.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA KP R10 Phase III.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert KP Planet R10 Phase 3.pdf19 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200257423436_For_Asset_Based_Search_12_01_2023_15_01_45_941.pdf16 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KP Planet Phase 3.pdf2 Nov 2022
Disclosure of sold/ booked inventoryFile: KP Planet Phase 3.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R10 BC PH III Rera Form Sep'22_ Signed_compressed.pdf19 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_200249958167_For_Debtor_Based_Search_17_10_2022_17_25_10_146.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SECTOR R10 BLDG BC.pdf17 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch - R10 - Ph3.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R 10 Phase III.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: R10 Phase 3.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA R10 Ph 3.pdf7 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200241270212_For_Debtor_Based_Search_02_07_2022_12_46_55_814.pdf4 Jul 2022
Proforma of Allotment letterFile: AFS Phase 3_compressed.pdf29 Jun 2022
Proforma of Allotment letterFile: Phase III AFS April 2022.pdf28 Apr 2022
Declaration about Commencement CertificateFile: R10 Phase 3 - commencement declaration.pdf11 Apr 2022
Declaration in FORM BFile: KP Planet affidavit.pdf28 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 R10 Phase III_compressed.pdf28 Mar 2022
Proforma of Allotment letterFile: Allotment letter and AFS R10 Phase 3.pdf28 Mar 2022
Layout approvalFile: R10 Layout-re.pdf22 Mar 2022
Building plan approvalFile: R10 Layout-re.pdf22 Mar 2022
PAN CardFile: PAN_KP Planet.pdf22 Mar 2022
Copy of the legal title reportFile: Title R10.pdf22 Mar 2022
Details of encumbrancesFile: encumbrance declaration.pdf22 Mar 2022
Copy of Layout Approval (in case of layout)File: R10 Layout-re.pdf22 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: R10 Layout-re.pdf22 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf22 Mar 2022
CERSAI detailsFile: CERSAI Search Report.pdf22 Mar 2022

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Life Republic/Sector R10/10th Avenue/Univers on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Survey no 74 hinjewadi-marunji-kasarsai road taluka mulshi13,700+ in Pune

Builder: KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED

KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED has 5 registrations on MahaRERA, including Life Republic/Sector R10/10th Avenue/Universe/Phase-I and Life Republic/Sector R10/10th Avenue/Universe/Phase-II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Life Republic/Sector R10/10th Avenue/Universe/Phase III shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Life Republic/Sector R10/10th Avenue/Universe/Phase III is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Life Republic/Sector R10/10th Avenue/Universe/Phase III?

The registered promoter entity is KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Life Republic/Sector R10/10th Avenue/Universe/Phase III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Life Republic/Sector R10/10th Avenue/Universe/Phase III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Life Republic/Sector R10/10th Avenue/Universe/Phase III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Life Republic/Sector R10/10th Avenue/Universe/Phase III?

The professionals named in the filing: Architect: Kolhatkar and Gowikar; Engineer: Kaustubh Kale; Chartered Accountant: CA Nikita Bajaj; Chartered Accountant: VIDHI S SHAH & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Life Republic/Sector R10/10th Avenue/Universe/Phase III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Life Republic/Sector R10/10th Avenue/Universe/Phase III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Life Republic/Sector R10/10th Avenue/Univers to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.