Home / Browse projects / Pune, Maharashtra / Life Republic/Sector R10/10th Avenue/Universe/Phase-I
Life Republic/Sector R10/10th Avenue/Universe/Phase-I
By KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED
RG-MH-17015 · RERA P52100027629 · Last updated on MahaRERA portal: 27 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 9 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Life Republic/Sector R10/10th Avenue/Universe/Phase-I is a Others project by KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100027629 on 25 Dec 2020. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 9 complaints are on record with the regulator.
At a glance
Project
- NameLife Republic/Sector R10/10th Avenue/Universe/Phase-I
- TypeOthers
- Location
- Hinjewadi-Marunji-Kasarsai Road
- Hinjewadi
- Jambe
- Mulshi
- Pune
- 411057
- Pincode411057
- RERA no.P52100027629
- ReraGenie IDRG-MH-17015
Builder
- NameKOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED
- Entity typeCompany
- DirectorRAHUL TALELE
- Other registrations4 more →
- Completed1 of 5
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on25 Dec 2020
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings3 building records
- Documents filed71 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 25 | 25 | 0 | 0 | 0 |
| Building H | NA | 26 | 26 | 0 | 0 | 0 |
| Building I | NA | 26 | 26 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 27 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 97%.
Building A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building H100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building I87%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 63% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 27 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 80% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 40% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed577
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building A | 255 | 255 |
| Building H | 161 | 161 |
| Building I | 161 | 161 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED | - |
Complaints filed with MahaRERA9
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000441126 | DR DEEPAK GOPAL DUBEY | KOLTE PATIL PLANET REAL ESTTE P LTD | 13/06/2024 |
| CC12603977 | KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED | Babasaheb Dalvi | 26/06/2026 |
| CC12603980 | KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED | Pramod Khandu Bankar | 26/06/2026 |
| CC12603981 | KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED | Rajesh Harishchandra Tale | 26/06/2026 |
| CC12604039 | KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED | Deepak Gopal Dube | 29/06/2026 |
| CC12604048 | KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED | Harun Ismail Tamboli | 29/06/2026 |
| CC12604050 | KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED | Jeelan Basha SHaik | 29/06/2026 |
| CC12604051 | KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED | Sainath Shivajirao Jagatkar | 29/06/2026 |
| CC12604056 | KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED | Sandip Dhondiram Dhemare | 29/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Dec 2024
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Phase 1.pdf | 27 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf | 27 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 LR R10 Phase-I.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 R10 Phase-I.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240930_ Details_Life Republic_R10 AHI Sector.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: R10 PHASE I.pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R10 - Phase 1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 R10 Phase-I.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 R10-Phase-I.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R10-Phase 1 Signed Form-2.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 R10 Phase 1.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240331_ Details_Life Republic_R10 AHI Sector.pdf | 12 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R10 Phase 1 Project.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R10-Phase 1.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R10_Phase 1.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R10 Phase I Signed Form 2.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R10-I.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R10_Phase 1.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: KP PLanet Phase I certificate.pdf | 30 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Life Republic Sector R 10 - 10th Avenue - Phase 1.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R10 PH I.pdf | 20 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R10 Phase I.pdf | 17 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: KP PLanet Phase 1 Final Inv Dec.pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R10 Ph I.pdf | 19 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R10 Phase I Form3 signed.pdf | 19 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R10 Phase I.pdf | 15 Apr 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200266191206_For_Debtor_Based_Search_15_04_2023_17_01_01_380.pdf | 15 Apr 2023 |
| Proforma of Agreement for saleFile: AFS LR KP Planet Phase I.pdf | 28 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LR R10 Phase I Form 2.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Final KP Planet R10 Phase 1 In Dec.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA KP R10 Phase I.pdf | 20 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cer KP Planet R10 Phase 1.pdf | 19 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200257423436_For_Asset_Based_Search_12_01_2023_15_01_45_941.pdf | 16 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KP Planet Phase 1.pdf | 2 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: KP Planet Phase 1.pdf | 20 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R10 AHI PH I Rera Form Sep'22_ Signed_compressed__.pdf | 19 Oct 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200249958167_For_Debtor_Based_Search_17_10_2022_17_25_10_146.pdf | 18 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SECTOR R 10, BLDG A H I AND SHOPS.pdf | 17 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Certificate_KP Planet_Phase I.pdf | 30 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch - R10 - Ph1.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R 10 Phase I.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: R10 Phase 1_compressed.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - R10 Ph1_compressed.pdf | 7 Jul 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200241270212_For_Debtor_Based_Search_02_07_2022_12_46_55_814.pdf | 4 Jul 2022 |
| Proforma of Allotment letterFile: AFS Phase 1-compressed.pdf | 29 Jun 2022 |
| Proforma of Allotment letterFile: Phase I AFS April 2022.pdf | 27 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Phase 1 Planet Inventory Declaration.pdf | 19 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KP Planet form 2-Phase 1.pdf | 7 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_R 10 Phase I_compressed.pdf | 7 Apr 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200234305077_For_Debtor_Based_Search_04_04_2022_18_17_08_061.pdf | 6 Apr 2022 |
| Proforma of Allotment letterFile: LR-SECTOR R10_Phase_I_AFS compressed.pdf | 10 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 2 Planet R 10 phase 1.pdf | 18 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Universe Phase 1.pdf | 18 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: R10 Phase 1 Universe.pdf | 17 Jan 2022 |
| CERSAI detailsFile: KP Planet.pdf | 7 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 1.pdf | 7 Jan 2022 |
| Proforma of Allotment letterFile: AFS Oct 21 Phase 1 R10-compressed.pdf | 29 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 12011 RERA Certificate- KP Planet.pdf | 29 Sep 2021 |
| Proforma of Allotment letterFile: 31-07-2021-FINAL-LR-SECTOR R10-Phase-I-Draft RERA AFS_compressed.pdf | 2 Aug 2021 |
| Proforma of Allotment letterFile: FINAL-LR-SECTOR R10-Draft RERA AFS_compressed.pdf | 22 Jul 2021 |
| PAN CardFile: PAN_KP Planet.pdf | 18 Dec 2020 |
| Proforma of Allotment letterFile: revise agreement1812.pdf | 18 Dec 2020 |
| Declaration in FORM BFile: declaration - R10 Phase 1.pdf | 11 Dec 2020 |
| Layout approvalFile: R10 Layout-re.pdf | 10 Dec 2020 |
| Building plan approvalFile: R10 Layout-re.pdf | 10 Dec 2020 |
| Copy of the legal title reportFile: Search and Title Report R10.pdf | 10 Dec 2020 |
| Details of encumbrancesFile: Encumbrances.pdf | 10 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: R10 Layout-re.pdf | 10 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: R10 Layout-re.pdf | 10 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf | 10 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf | 10 Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Life Republic/Sector R10/10th Avenue/Univers on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hinjewadi13,700+ in Pune
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED
KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED has 5 registrations on MahaRERA, including Life Republic/Sector R10/10th Avenue/Universe/Phase-I and Life Republic/Sector R10/10th Avenue/Universe/Phase-II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Life Republic/Sector R10/10th Avenue/Universe/Phase-I shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Life Republic/Sector R10/10th Avenue/Universe/Phase-I is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Life Republic/Sector R10/10th Avenue/Universe/Phase-I?
The registered promoter entity is KOLTE-PATIL PLANET REAL ESTATE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Life Republic/Sector R10/10th Avenue/Universe/Phase-I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Life Republic/Sector R10/10th Avenue/Universe/Phase-I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Life Republic/Sector R10/10th Avenue/Universe/Phase-I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Life Republic/Sector R10/10th Avenue/Universe/Phase-I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback