Home / Browse projects / Pune, Maharashtra / Life Established

Registered No litigation declared Residential / Group Housing project

Life Established

By PANASIA RISING SPACES LLP

RG-MH-94665 · RERA P52100054094 · Last updated on MahaRERA portal: 21 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 24 months from the original
5 of 16Construction stages doneacross 2 buildings; furthest along: Internal walls, 70%
76 of 114Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Life Established is a Residential / Group Housing project by PANASIA RISING SPACES LLP in Pune, Maharashtra, registered with MahaRERA as P52100054094 on 27 Dec 2023. Possession is promised by 31 Dec 2028. The completion date has moved by 24 months from the original filing. 38 of the 114 units on this registration are recorded sold or booked, and 5 of 16 construction stages are filed complete.

At a glance

Project

  • NameLife Established
  • TypeResidential / Group Housing
  • Location
    • KASARSAI
    • Mulshi
    • Pune
    • 410506
  • Pincode410506
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054094
  • ReraGenie IDRG-MH-94665

Builder

  • NamePANASIA RISING SPACES LLP
  • Entity typePartnership
  • PartnerBhujangrao Sonba Kalaskar

Key dates

this monthRegisteredDec 2023First promiseDec 2026Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2023
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2026)
  • Buildings2 building records
  • Documents filed88 files

Current status

33%38 of 114 units booked
42.0%Work done, per cost certificate

Figures as on 21 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA7657057
Building No 2NA7657057

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 16 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 70%.

Building No 159%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 229%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed250

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots250
Closed/Covered250
BuildingClosed/CoveredTotal
Building No 1125125
Building No 2125125

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,000 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025
LandownerVillageDistrict
Ganesh Barku ShedgeKasarsaiPune

Approvals and building plan

Sanctioning authorityPune metropolitan Region Development Authority,Pune
Permissible FSI6420.2
Proposed, not sanctioned6,401 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSURVEY NO 244 3 5 RAJIV GANDHI INFOTECH PARK, NEAR TATA JOHNSON CONTROLS, HINJEWADI, PUNE 411057
Estimated costRs 19.23 cr
Cost incurredRs 8.08 cr
Work done42.0%
BuildingWingEstimatedIncurred
Building No 1NARs 7.69 crRs 5.77 cr
Building No 2NARs 7.69 crRs 38.46 lakh
-NARs 3.85 crRs 1.92 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVARSETILE STUDIO
ArchitectSahil Khinvasara
ArchitectArc Atelier
EngineerARJUN ENGINEER
EngineerPratik Construction structural engineers and project management consultant
EngineerP D PHULARI
Chartered AccountantGirish Jagtap & Co
Chartered AccountantPurushottam R dhemare
Chartered AccountantSHRIPAD WAIKAR AND ASSOCIATES
PartnerRole in project
PANASIA RISING SPACES LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30062621621Dec 2026 → Dec 2028

Reason as filed by the promoterConstruction of the said project is 55% completed. We want to apply for extension to complete remaining construction of the project till 31/12/2028.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 final.pdf21 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf21 Jul 2026
Withdrawal Update Form 3File: form 3 (2).pdf21 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-2025.pdf16 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-2026.pdf16 Jun 2026
Form 5 (FY 2023-2024)File: Form-5_2023-24.pdf16 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Apr 2026
Withdrawal Update Form 3File: CA Certificate with Form-3 Final Signed.pdf24 Apr 2026
Withdrawal Update Form 1File: form1.pdf23 Jan 2026
Withdrawal Update Form 2File: FORM 3 Panasia 31-12-2025.pdf23 Jan 2026
Withdrawal Update Form 3File: FORM 3 Panasia 31-12-2025_compressed.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 September 2025.pdf19 Oct 2025
Withdrawal Update Form 2File: FORM 2 ENGINEERu0027S CERTIFICATE September 2025.pdf19 Oct 2025
Withdrawal Update Form 3File: Form-3 Panasia Rising Spaces - september 2025.pdf19 Oct 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf20 Jul 2025
Withdrawal Update Form 2File: Form 2 ENGINEER CERTIFICATE - LIFE ESTABLISHED.pdf20 Jul 2025
Withdrawal Update Form 3File: Form 3 as on 30-06-2025_compressed.pdf20 Jul 2025
Form 5 (FY 2024-2025)File: Form-5 period from - 01-04-2024 to 31-03-2025.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Panasia 07-05-2025_compressed.pdf20 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold, unsold and booked inventory correction - 20-06-2025.pdf20 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: CC VERIFICATION.pdf30 Apr 2025
Declaration about Commencement CertificateFile: Format D - commencement declaration.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Life Estsblished CA certificate2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 31-03-2025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 31-03-2024 with sign and stamp.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold, unsold and booked inventory (1).pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Mar 2024 compressed.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2024 compressed.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 2024 compressed.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 30-06-2024.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 30-09-2024.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 31-12-2024.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 31-03-2025.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD DISCLOSURE-old with corret details 31-03-2024.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD DISCLOSURE-old with corret details -30-06-2024.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD DISCLOSURE-old with corret details -30-09-2024.pdf9 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA certificat 2023-2024.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECTS CERTIFICATE_RERA_LIFE ESTBALISH-1.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 life established_compressed.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30 06 2024.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30 09 2024.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31 12 2024.pdf2 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Revision plan CC Kasarsai.pdf2 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 life established.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf23 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf3 Mar 2025
Layout approvalFile: REVISION PLAN BLUE 1.pdf14 Jan 2025
Building plan approvalFile: REVISION PLAN BLUE PRINT KASARSAI2.pdf14 Jan 2025
Building plan approvalFile: REVISION PLAN BLUE PRINT KASARSAI 3.pdf14 Jan 2025
Building plan approvalFile: REVISION PLAN BLUE PRINT KASARSAI 4.pdf14 Jan 2025
Copy of Layout Approval (in case of layout)File: REVISION PLAN BLUE 1.pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: REVISION PLAN BLUE PRINT KASARSAI2.pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: REVISION PLAN BLUE PRINT KASARSAI 3.pdf14 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: REVISION PLAN BLUE PRINT KASARSAI 4.pdf14 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a-1_merged.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VD.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 vd.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2a vd-1_merged_compressed.pdf16 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: New NA Order.pdf18 Dec 2023
Other - FinanceFile: dec land owner_compressed.pdf18 Dec 2023
Other - LegalFile: 1 Other - Legal_merged.pdf14 Dec 2023
Layout approvalFile: 5 (2)_compressed.pdf12 Dec 2023
Copy of the legal title reportFile: Legal Title Report_ RERA_compressed.pdf12 Dec 2023
Copy of Layout Approval (in case of layout)File: 5 (2)_compressed.pdf12 Dec 2023
PAN CardFile: pan.pdf25 Nov 2023
Details of encumbrances concerned to FinanceFile: encumb_compressed.pdf25 Nov 2023
Details of encumbrances concerned to LegalFile: encumb_compressed.pdf25 Nov 2023
Declaration about Commencement CertificateFile: cc dec_compressed.pdf25 Nov 2023
Declaration in FORM BFile: ilovepdf_merged_organized_compressed (1).pdf25 Nov 2023
CERSAI detailsFile: cersa1.pdf25 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: vahida disc_compressed.pdf25 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Partner 2_compressed.pdf25 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank_compressed (1).pdf25 Nov 2023
Deviation Report with respect to Allotment letterFile: devi alot_compressed.pdf25 Nov 2023
Deviation Report with respect to model copy of AgreementFile: devi agreement_compressed.pdf25 Nov 2023
Layout approvalFile: 1 (3)_compressed.pdf24 Nov 2023
Building plan approvalFile: 2_compressed.pdf24 Nov 2023
Building plan approvalFile: 3_compressed.pdf24 Nov 2023

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Life Established on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASARSAI13,700+ in Pune

2 kmLife EstablishedLapsed / revoked 2Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: PANASIA RISING SPACES LLP

PANASIA RISING SPACES LLP has 1 registration on MahaRERA, including Life Established. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Life Established is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Life Established?

The registered promoter entity is PANASIA RISING SPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Life Established?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Life Established?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Life Established?

The professionals named in the filing: Architect: VARSETILE STUDIO; Architect: Sahil Khinvasara; Architect: Arc Atelier; Engineer: ARJUN ENGINEER; Engineer: Pratik Construction structural engineers and project management consultant; Engineer: P D PHULARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Life Established?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Life Established. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Life Established to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.