Home / Browse projects / Raigarh, Maharashtra / Legacy Vrindavan

Registered No litigation declared Residential / Group Housing project

Legacy Vrindavan

By Concord Enterprises

RG-MH-25774 · RERA P52000012969 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 108 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 108 months from the original
8 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 70%
84 of 98Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Legacy Vrindavan is a Residential / Group Housing project by Concord Enterprises in Raigarh, Maharashtra, registered with MahaRERA as P52000012969 on 7 Sep 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 108 months from the original filing. 14 of the 98 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameLegacy Vrindavan
  • TypeResidential / Group Housing
  • Location
    • GUNDGE
    • GUNDGE
    • NEXT TO GUNDGE MUNICIPAL SCHOOL
    • Karjat
    • Raigarh
    • 400075
  • Pincode400075
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000012969
  • ReraGenie IDRG-MH-25774

Builder

  • NameConcord Enterprises
  • Entity typePartnership
  • PartnersJayant Shyam Sinari, Chandrashekhar Jamanna Swami

Key dates

this monthRegisteredSep 2017First promiseDec 2018Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Sep 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2018)
  • Buildings2 building records
  • Documents filed99 files

Current status

14%14 of 98 units booked

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA9770070
B wingNA9728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 70%.

A Wing83%
ActivityProgress
Excavation70%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B wing45%
ActivityProgress
Excavation70%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed200

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots200
Open Space200
BuildingOpen SpaceTotal
A Wing100100
B wing100100

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,860 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKARJAT MUNICIPAL COUNCIL
Permissible FSI10665.42
Proposed, not sanctioned10,665 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRigved, Ground Floor, Veer Saverkar Marg, Dadar west, Mumbai

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJayant Shyam Sinari
Chartered AccountantMAMATA VAIBHAV MEHTA
PartnerRole in project
Concord Enterprises-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000019221Dec 2018 → Dec 2027

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 71.43% allottees for purpose of extension of RERA registration period of the said project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 jan to MARCH24.pdf16 Apr 2026
Form 2File: Form 2 31324.pdf16 Apr 2026
Form 3File: Form 3 31324 with udin sign_compressed.pdf16 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory legacy vrindavan.pdf16 Apr 2026
Form 1File: Form 1 april-june 2024.pdf16 Apr 2026
Form 2File: Form 2 30june24.pdf16 Apr 2026
Form 3File: Form 3 concord udin signed stamp 30june24_compressed (1).pdf16 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory legacy vrindavan.pdf16 Apr 2026
Form 1File: FORM 1 July-sept 2024.pdf16 Apr 2026
Form 2File: Form 2 30924.pdf16 Apr 2026
Form 3File: Form 3 jul to sep 24.pdf16 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory legacy vrindavan.pdf16 Apr 2026
Form 1File: FORM 1 oct-dec 2024.pdf16 Apr 2026
Form 2File: Form 2 31DEC24.pdf16 Apr 2026
Form 3File: Form 3 oct to dec 24.pdf16 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory legacy vrindavan.pdf16 Apr 2026
Form 1File: FORM 1 JAN-MAR25.pdf16 Apr 2026
Form 2File: Form 2 31MARCH25.pdf16 Apr 2026
Form 3File: form 3 jan to march 25.pdf16 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory legacy vrindavan.pdf16 Apr 2026
Form 1File: FORM 1 APRIL-JUNE 25.pdf16 Apr 2026
Form 2File: Form 2 30JUNE25.pdf16 Apr 2026
Form 3File: form 3 April to June 25.pdf16 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory legacy vrindavan.pdf16 Apr 2026
Form 1File: FORM1 JULY-SEPT25.pdf16 Apr 2026
Form 2File: Form 2 30 SEP 2025.pdf16 Apr 2026
Form 3File: form 3 jul to sep 25.pdf16 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory legacy vrindavan.pdf16 Apr 2026
Form 1File: FORM1 OCT-DEC 25.pdf16 Apr 2026
Form 2File: form 2 31 DEC 25.pdf16 Apr 2026
Form 3File: form OCT TO DEC 25.pdf16 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory legacy vrindavan.pdf16 Apr 2026
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf6 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Legacy Vrindavan Form 2 Mar 2018.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Legacy Vrindavan Form 2 Mar 2019.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Legacy Vrindavan Form 2 Mar 2020.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Legacy Vrindavan Form 2 Mar 2021.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Legacy Vrindavan Form 2 Mar 2022.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Legacy Vrindavan Form 2 Dec 2022.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Legacy Vrindavan Form 2 Mar 2023.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Legacy Vrindavan Form 2 Jun 2023.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Legacy Vrindavan Form 2 Sep 2023.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Legacy Vrindavan Form 2 Dec 2023.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Legacy Vrindavan as on June 2023.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Legacy Vrindavan as on Sep 2023.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Legacy Vrindavan as on Dec 2023.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Legacy Vrindavan as on 31st March 2018.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Legacy Vrindavan as on 31st March 2019.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Legacy Vrindavan as on 31st March 2020.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Legacy Vrindavan as on 31st March 2021.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Legacy Vrindavan as on 31st March 2022.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Legacy Vrindavan as on 31st December 2022.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Legacy Vrindavan as on 31st March 2023.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Legacy Vrindavan as on 30th june 2023.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Legacy Vrindavan as on 30th September 2023.pdf4 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Legacy Vrindavan as on 31st December 2023.pdf4 Mar 2024
Certificates of CA (Form 5)File: form 5 - Legacy Vrundavan for FY - 2017-18.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Legacy Vrundavan for FY - 2018-19.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Legacy Vrundavan for FY - 2019-20.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Legacy Vrundavan for FY - 2020-21.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Legacy Vrundavan for FY - 2021-22.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Legacy Vrundavan for FY - 2022-23.pdf4 Mar 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf2 Mar 2024
Declaration in FORM BFile: Form B Legacy.pdf29 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf28 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf28 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf28 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf28 Feb 2024
CERSAI detailsFile: Declaration of CERSAI.pdf28 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf28 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf28 Feb 2024
Declaration about Commencement CertificateFile: Format D.pdf22 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 23_11zon.pdf22 Feb 2024
Proforma of Allotment letterFile: Agreement for Sale Karjat.pdf30 Nov 2017
Proforma of Allotment letterFile: Agreement For Sale Final.pdf30 Nov 2017
Proforma of Allotment letterFile: Agreement for Sale Karjat.pdf30 Nov 2017
Proforma of Allotment letterFile: Agreement For Sale Final.pdf30 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginner Certificate-min.pdf12 Aug 2017
Certificates of CA (Form 3)File: Form 3.pdf12 Aug 2017
Certificates of CA (Form 5)File: Form 5.pdf12 Aug 2017

How this compares with Raigarh

14%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 108 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Legacy Vrindavan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GUNDGE, NEXT TO GUNDGE MUNICIPAL SCHOOL5,900+ in Raigarh

2 kmLegacy VrindavanCompleted 17Lapsed / revoked 18Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 69 registered projects within 2 km.

Builder: Concord Enterprises

Concord Enterprises has 1 registration on MahaRERA, including Legacy Vrindavan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Legacy Vrindavan is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Legacy Vrindavan?

The registered promoter entity is Concord Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Legacy Vrindavan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Legacy Vrindavan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Legacy Vrindavan?

The professionals named in the filing: Architect: Jayant Shyam Sinari; Chartered Accountant: MAMATA VAIBHAV MEHTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Legacy Vrindavan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Legacy Vrindavan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Legacy Vrindavan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.