Completed No litigation declared Others project

Legacy Celestia

By Legacy Lifespaces LLP

RG-MH-22158 · RERA P52100030612 · Last updated on MahaRERA portal: 5 Mar 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2024Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

Legacy Celestia is a Others project by Legacy Lifespaces LLP in Pune, Maharashtra, registered with MahaRERA as P52100030612 on 8 Sep 2021. The registration is recorded completed; possession was promised by 1 Sep 2024.

At a glance

Project

  • NameLegacy Celestia
  • TypeOthers
  • Location
    • Vinode vasti
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030612
  • ReraGenie IDRG-MH-22158

Builder

  • NameLegacy Lifespaces LLP
  • Entity typeOthers
  • Named personsNikky Naresh Vaswani, Kundan Ramchandra Jachak, Roshan Kishanchand Ramnani, Bina Dayaram Chandani
  • Other registrations7 more →
  • Completed4 of 8
  • Past their filed date1
  • Declared earlier projects11 →

Key dates

this monthRegisteredSep 2021PromisedSep 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Sep 2021
  • Promised completion1 Sep 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA80000
BNA80000
CNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 5 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered50
BuildingClosed/CoveredTotal
A1414
B1818
C1818

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,374 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Dhanaji Rambhau VinodeWakadPune
Nadu Alias Nadkumar Rambhau VinodeWakadPune
Rajendra Rambhau VinodeWakadPune

Approvals and building plan

Permissible FSI9315.03
Proposed, not sanctioned8,415 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivar Chowk Rahatani

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMehul Shah
EngineerRupesh Mahamuni
Chartered AccountantRajendra Ekbote
PartnerRole in project
Legacy Lifespaces LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Apr 2023

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: Conveyance Deed Index II.pdf5 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement 29-12-2021_rotated.pdf7 Feb 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: C A CERTIFICATE FORM 5.pdf6 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: C A CERTIFICATE FORM 5.pdf6 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CAMPLETION 138-2023_compressed.pdf5 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Artichect Certificate for Completion.pdf5 Apr 2023
Other - TechnicalFile: Form 4 Artichect Certificate for Completion.pdf5 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30-09-2021.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30-12-2021.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -31-03-2022.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -30-06-2022.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31-12-2022.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificate of cost incurred Development_compressed.pdf20 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificate of Percentage of Construction Work 05-04-2022.pdf20 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificate of Percentage of Construction Work 15-10-2022.pdf20 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificate of Percentage of Construction Work 19-12-2022.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Legacy Celestia CA Certificate 05-10-2022.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Legacy Celestia CA Certificate 05-10-2022.pdf20 Feb 2023
Other - LegalFile: Declaration Form 5.pdf20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LEGACYCELESTIASEPT22.pdf4 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Legacy Celestia.pdf1 Oct 2022
Disclosure of sold/ booked inventoryFile: Celestia_Sold_unsold_compressed.pdf1 Oct 2022
Other - LegalFile: Nandu Vinode 701and702 MOU_Registered (1).pdf19 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Celestia_compressed.pdf2 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Legacy Celestia_compressed (1).pdf29 Jul 2022
Disclosure of sold/ booked inventoryFile: Celestia_compressed.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Celestia Architect.pdf18 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Celestia 03-2022_compressed.pdf9 Apr 2022
Layout approvalFile: Layout_Revised_compressed.pdf2 Feb 2022
Copy of Layout Approval (in case of layout)File: Layout_Revised_compressed.pdf2 Feb 2022
Disclosure of sold/ booked inventoryFile: Celestia.pdf20 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Celestia_organized.pdf19 Jan 2022
Copy of the legal title reportFile: Adv Nanekar search.pdf16 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA-Celestia -Sep-21.pdf2 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Celestia_compressed.pdf14 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold-unsold.pdf14 Oct 2021
Copy of the legal title reportFile: Search Report RERA formate_compressed.pdf4 Sep 2021
Copy of the legal title reportFile: Search Report RERA formate_compressed.pdf4 Sep 2021
Declaration in FORM BFile: Revised Form B_compressed.pdf4 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA- Celestia 24-08-21.pdf26 Aug 2021
Proforma of Allotment letterFile: Legacy Celestia.pdf26 Aug 2021
Proforma of Allotment letterFile: Allotment Form.pdf26 Aug 2021
Copy of the legal title reportFile: Search Report_compressed.pdf20 Aug 2021
Declaration about Commencement CertificateFile: CC Declaration formate D.pdf20 Aug 2021
Layout approvalFile: Layout.pdf19 Aug 2021
Building plan approvalFile: Layout.pdf19 Aug 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf19 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Layout.pdf19 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC dtd 12-08-2021_compressed.pdf19 Aug 2021
PAN CardFile: Legacy Lifespaces LLP Pan card.pdf18 Aug 2021
Details of encumbrancesFile: Details of Encumbrances.pdf18 Aug 2021
Declaration in FORM BFile: Form B Declaration 1.pdf18 Aug 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Legacy AuraLegacy Aura Rahatni118CompletedDec 2019Jul 2019
Aqua MistAqua Mist Ravet Shinde Vasti80CompletedDec 2017Apr 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Legacy Celestia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

2 kmLegacy CelestiaCompleted 127Lapsed / revoked 53Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 252 registered projects within 2 km.

Builder: Legacy Lifespaces LLP

Legacy Lifespaces LLP has 8 registrations on MahaRERA, including Legacy Aura and Legacy Vista. Its filings disclose 11 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Legacy Celestia is delayed beyond 1 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Legacy Celestia?

The registered promoter entity is Legacy Lifespaces LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Legacy Celestia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Legacy Celestia?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Legacy Celestia?

The professionals named in the filing: Architect: Mehul Shah; Engineer: Rupesh Mahamuni; Chartered Accountant: Rajendra Ekbote. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Legacy Celestia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Legacy Celestia. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Legacy Celestia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.