Home / Browse projects / Pune, Maharashtra / LEELA HEIGHTS

Registered No litigation declared Others project

LEELA HEIGHTS

By VISHAL PROPERTIES

RG-MH-22611 · RERA P52100031666 · Last updated on MahaRERA portal: 22 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 72 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 72 months from the original
27 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 50%
93 of 212Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 263 documents Report an error

LEELA HEIGHTS is a Others project by VISHAL PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100031666 on 3 Nov 2021. Possession is promised by 31 Dec 2030. The completion date has moved by 72 months from the original filing. 119 of the 212 units on this registration are recorded sold or booked, and 27 of 66 construction stages are filed complete.

At a glance

Project

  • NameLEELA HEIGHTS
  • TypeOthers
  • Location
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031666
  • ReraGenie IDRG-MH-22611

Builder

  • NameVISHAL PROPERTIES
  • Entity typePartnership
  • PartnersHARGOBIND HAZARIMAL TEJWANI, VISHAL HARGOBIND TEJWANI, DILIP NARAINDAS RAMCHANDANI
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredNov 2021First promiseDec 2024Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Nov 2021
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 28 Dec 2024)
  • Buildings6 building records
  • Documents filed263 files

Current status

56%119 of 212 units booked
98.5%Work done, per cost certificate

Figures as on 22 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA191456056
B BUILDINGNA191455055
C BUILDINGNA2245045
D BUILDINGNA151456056
E BUILDINGNA00000
COMMERCIAL BUILDINGNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 50%.

A BUILDING73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B BUILDING73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C BUILDING44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D BUILDING68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E BUILDING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
COMMERCIAL BUILDING4%
ActivityProgress
Excavation40%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes100%
Street LightingYes75%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered112
BuildingClosed/CoveredTotal
A BUILDING5656
B BUILDING5656

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,216 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Dec 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI35127.06
Proposed, not sanctioned20,316 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPRI PUNE
Estimated costRs 35.64 cr
Cost incurredRs 35.10 cr
Work done98.49%
BuildingWingEstimatedIncurred
A BUILDINGNARs 15.67 crRs 15.67 cr
B BUILDINGNARs 15.67 crRs 15.67 cr
-NARs 2.72 crRs 2.62 cr
D BUILDINGNARs 98.22 lakhRs 92.08 lakh
COMMERCIAL BUILDINGNARs 49.59 lakhRs 16.86 lakh
C BUILDINGNARs 10.07 lakhRs 6.04 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPROJECTION STUDIO ARCHITECTS AND INTERIOR DESIGN
EngineerAMOL HANDE
EngineerVISHAL PROPERTIES
EngineerRohinee Badgujar
Chartered AccountantTILOKCHANDANI AND ASSOCIATES
PartnerRole in project
VISHAL PROPERTIES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019785Dec 2024 → Dec 2025

Reason as filed by the promoterDue to Financial Issue

EA15122518686Dec 2024 → Dec 2030

Reason as filed by the promoterThe project has been delayed due to financial and market-driven constraints affecting both C and E Buildings. The sales activity for C Building could not be initiated as planned because of unfavorable market conditions, resulting in the non-availability of the expected sales revenue required to start its major construction work. Similarly, the construction of E Building has been temporarily halted, as its progress is heavily dependent on the funds expected from the commercial component of the project, which is the primary source of financial inflow for completing the remaining development. Due

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed263

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 263 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate (14).pdf22 Jul 2026
Withdrawal Update Form 1File: Architect Certificate (14).pdf22 Jul 2026
Withdrawal Update Form 1File: Architect Certificate (14).pdf22 Jul 2026
Withdrawal Update Form 2File: Engineer certificate (3).pdf22 Jul 2026
Withdrawal Update Form 2File: Engineer certificate (3).pdf22 Jul 2026
Withdrawal Update Form 2File: Engineer certificate (3).pdf22 Jul 2026
Withdrawal Update Form 3File: CA form 3 march 26 (1).pdf22 Jul 2026
Withdrawal Update Form 3File: CA form 3 march 26 (1).pdf22 Jul 2026
Withdrawal Update Form 3File: CA form 3 march 26 (1).pdf22 Jul 2026
Withdrawal Update Form 1File: Form 1-March-2026.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf14 Jul 2026
Withdrawal Update Form 3File: CA form 3 march 26 (1).pdf14 Jul 2026
Form 5 (FY 2022-2023)File: Form 5-2022-2023.pdf6 Apr 2026
Form 5 (FY 2023-2024)File: Form 5-2023-2024.pdf6 Apr 2026
Form 5 (FY 2024-2025)File: Form 5-2024-2025.pdf6 Apr 2026
Form 2A (FY 2025-2026)File: Rera Certificate (1) (1).pdf28 Mar 2026
Form 5 (FY 2021-2022)File: Form 5 -2021-2022.pdf28 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf17 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf17 Mar 2026
Withdrawal Update Form 3File: CA Certificate dec 25 Quarter.pdf17 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf7 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf7 Feb 2026
Withdrawal Update Form 3File: 11Form 3 March 2024.pdf7 Feb 2026
Withdrawal Update Form 3File: 11Form 3 March 2024.pdf7 Feb 2026
Form 1File: Form 1.pdf27 Dec 2025
Form 2File: Form 2.pdf27 Dec 2025
Form 3File: Form 3 s.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf27 Dec 2025
Form 1File: Form 1.pdf27 Dec 2025
Form 2File: Form 2.pdf27 Dec 2025
Form 3File: Form 3 s_compressed (6).pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf27 Dec 2025
Form 1File: Form 1 s.pdf27 Dec 2025
Form 2File: Form 2.pdf27 Dec 2025
Form 3File: Form 3 s_compressed (7).pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf27 Dec 2025
Form 1File: Form 1 s.pdf27 Dec 2025
Form 2File: Leela heights Dec 24 s.pdf27 Dec 2025
Form 3File: Form 3.pdf27 Dec 2025
Disclosure of Sold and Booked InventoryFile: Dec 2024Sold Unsold.pdf27 Dec 2025
Form 2A (FY 2023-2024)File: Er. Certificate Quality Assurance 2023-24.pdf27 Dec 2025
Form 2A (FY 2024-2025)File: Er. Certificate gor Quality Assurance 2024-25.pdf27 Dec 2025
Form 1File: Vishal properties form 1.pdf13 Nov 2025
Form 2File: Leela heights sep 25 Form 2.pdf13 Nov 2025
Form 3File: Form 3 s_compressed (4).pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Leela Heights Sold unsold Sep 2025.pdf13 Nov 2025
Form 1File: Jun 2025 Form 1 s.pdf25 Aug 2025
Form 2File: LEELA heights june 25 Form 2.pdf25 Aug 2025
Form 3File: CA CERTIFICATE RERA Jun 2025_compressed.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Rera SoldUnsold June 2025_compressed.pdf25 Aug 2025
Form 1File: Form 1.pdf26 Jun 2025
Form 2File: Form 2.pdf26 Jun 2025
Form 3File: Form 3.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf26 Jun 2025
Form 1File: Form 1.pdf26 Jun 2025
Form 2File: Form 2.pdf26 Jun 2025
Form 3File: Form 3.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf26 Jun 2025
Form 1File: Form 1.pdf26 Jun 2025
Form 2File: Form 2.pdf26 Jun 2025
Form 3File: Form 3.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf26 Jun 2025
Form 1File: Form 1.pdf26 Jun 2025
Form 2File: Form 2.pdf26 Jun 2025
Form 3File: Form 3.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf26 Jun 2025
Form 1File: Form 1.pdf26 Jun 2025
Form 2File: Form 2.pdf26 Jun 2025
Form 3File: Form 3.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf26 Jun 2025
Form 1File: Form 1.pdf26 Jun 2025
Form 2File: Form 2.pdf26 Jun 2025
Form 3File: Form 3.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf26 Jun 2025
Form 1File: Form 1.pdf26 Jun 2025
Form 2File: Form 2.pdf26 Jun 2025
Form 3File: Form 3.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf26 Jun 2025

How this compares with Pune

56%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 72 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LEELA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

2 kmLEELA HEIGHTSCompleted 132Lapsed / revoked 47Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 265 registered projects within 2 km.

Builder: VISHAL PROPERTIES

VISHAL PROPERTIES has 2 registrations on MahaRERA, including SKYSCRAPER PHASE 1 and LEELA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if LEELA HEIGHTS is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LEELA HEIGHTS?

The registered promoter entity is VISHAL PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LEELA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LEELA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LEELA HEIGHTS?

The professionals named in the filing: Architect: PROJECTION STUDIO ARCHITECTS AND INTERIOR DESIGN; Engineer: AMOL HANDE; Engineer: VISHAL PROPERTIES; Engineer: Rohinee Badgujar; Chartered Accountant: TILOKCHANDANI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LEELA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LEELA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LEELA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.