Home / Browse projects / Mumbai Suburban, Maharashtra / LEELA BUSINESS PARK - II

Registered No litigation declared Commercial project

LEELA BUSINESS PARK - II

By ROCKFORT ESTATE DEVELOPERS PRIVATE LIMITED

RG-MH-18817 · RERA P51800077630 · Last updated on MahaRERA portal: 23 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedmoved 4 months from the original
6 of 11Construction stages donefurthest along: Staircases, 80%
29 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

LEELA BUSINESS PARK - II is a Commercial project by ROCKFORT ESTATE DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077630 on 17 Oct 2024. Possession is promised by 30 Apr 2030. The completion date has moved by 4 months from the original filing. 23 of the 52 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameLEELA BUSINESS PARK - II
  • TypeCommercial
  • Location
    • AIRPORT ROAD METRO STATION
    • ANDHER
    • Marol
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • RERA no.P51800077630
  • ReraGenie IDRG-MH-18817

Builder

  • NameROCKFORT ESTATE DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200MH2000PTC128295
  • GSTIN27AABCR7896K1ZL
  • DirectorsDINESH NAIR, VIVEK NAIR, KETAN DANAK, LAKSHMI NAIR, UMESH DOMBE, SALINI MADHU NAIR

Key dates

this monthRegisteredOct 2024First promiseDec 2029Revised toApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Oct 2024
  • Promised completion30 Apr 2030
  • Revised completionRevised to 30 Apr 2030 (originally 31 Dec 2029)
  • Buildings1 building record
  • Documents filed136 files

Current status

44%23 of 52 units booked
50.9%Work done, per cost certificate

Figures as on 23 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LEELA BUSINESS PARK - IINA3305252

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

LEELA BUSINESS PARK - II: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 23 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed546

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots546
Closed/Covered546

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,311 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI90668.16
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchACME PLAZA, C.T.S. NO. 32OPP. SANGAM TALKIES, ANDHERI-KURLA ROAD,'ANDHERI (E), MUMBAI 400 059
Estimated costRs 550.84 cr
Cost incurredRs 280.50 cr
Work done50.92%
BuildingWingEstimatedIncurred
LEELA BUSINESS PARK - IINARs 550.84 crRs 280.50 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSuhas A. Malavade
ArchitectSUHAS MALAVADE
ArchitectSOHAM KSHETRAMADE
EngineerAkshay S. Ambekar
EngineerAKSHAY AMBEKAR
Chartered AccountantM R SHARMA & CO
Chartered AccountantMANMOHAN SHARMA
Chartered AccountantN.S SHETTY CHARTERED ACCOUNTANTS
PartnerRole in project
ROCKFORT ESTATE DEVELOPERS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51800077630/WarDec 2029 → Apr 2030

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A FOR YEAR ENDING MARCH 26 DTD 14 APRIL 2026.pdf23 Sep 2026
Form 5 (FY 2025-2026)File: Form 5.pdf17 Sep 2026
Withdrawal Update Form 1File: FORM 1.pdf14 Jul 2026
Withdrawal Update Form 2File: Rera form 2.pdf14 Jul 2026
Withdrawal Update Form 3File: RERA Form 3 Signed June 26.pdf14 Jul 2026
Layout approvalFile: Latest IOD (1).pdf7 May 2026
Commencement certificateFile: 7th to Terrace LMR CC..pdf7 May 2026
Layout approvalFile: BMC Apporved plan.pdf7 May 2026
Withdrawal Update Form 1File: FORM 1.pdf7 May 2026
Withdrawal Update Form 2File: FORM 2.pdf7 May 2026
Withdrawal Update Form 3File: FORM 3.pdf7 May 2026
Withdrawal Update Form 1File: 2025 12 31 ARCHITECTS CERTI FORM 1 FOR RERA.pdf11 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec 26 Signed.pdf11 Feb 2026
Withdrawal Update Form 3File: CA Form 3 Signed Dec25.pdf11 Feb 2026
Withdrawal Update Form 1File: form 1.pdf8 Nov 2025
Withdrawal Update Form 2File: Form 2 Signed Sep25 (1).pdf8 Nov 2025
Withdrawal Update Form 3File: Form 3 Signed dated041125.pdf8 Nov 2025
Layout approvalFile: Plans gray.pdf10 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A FY 24-25 LBP II RERA - QUALITY CERTIFICATE (2A).pdf6 Sep 2025
Form 5 (FY 2024-2025)File: REDPL Form5 FY 24-25.pdf6 Sep 2025
Layout approvalFile: consession plans gray.pdf25 Jul 2025
Layout approvalFile: Approved Plans gray.pdf25 Jul 2025
Building plan approvalFile: IOD.pdf25 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 24-25 REDPL (1).pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Form 2 upto March 2025.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 final.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf6 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATED.pdf15 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATED.pdf15 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATED.pdf15 Oct 2024
Other - TechnicalFile: Annexure A Layout.pdf11 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B updated.pdf11 Jul 2024
Other - TechnicalFile: Annexure A Layout.pdf11 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B updated.pdf11 Jul 2024
Other - TechnicalFile: Annexure A Layout.pdf11 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B updated.pdf11 Jul 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE SELF DECLARATION FORPROJECT LBP PHASE II.pdf9 Jul 2024
CERSAI detailsFile: CERSAI DECLARATION FOR LBP PHASE II.pdf9 Jul 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE SELF DECLARATION FORPROJECT LBP PHASE II.pdf9 Jul 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE SELF DECLARATION FORPROJECT LBP PHASE II.pdf9 Jul 2024
CERSAI detailsFile: CERSAI DECLARATION FOR LBP PHASE II.pdf9 Jul 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE SELF DECLARATION FORPROJECT LBP PHASE II.pdf9 Jul 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE SELF DECLARATION FORPROJECT LBP PHASE II.pdf9 Jul 2024
CERSAI detailsFile: CERSAI DECLARATION FOR LBP PHASE II.pdf9 Jul 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE SELF DECLARATION FORPROJECT LBP PHASE II.pdf9 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf8 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf8 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ROCKFORT - FORM 3 CA CERTIFICATE FOR LBP II RERA.pdf6 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ROCKFORT - FORM 3 CA CERTIFICATE FOR LBP II RERA.pdf6 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ROCKFORT - FORM 3 CA CERTIFICATE FOR LBP II RERA.pdf6 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate for RERA (2).pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate for RERA (2).pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate for RERA (2).pdf3 Jul 2024
Proforma of Allotment letterFile: DRAFT LBP II - ALLOTMENT LETTER RERA DRAFT.pdf18 Jun 2024
Deviation Report with respect to Allotment letterFile: NO DEVIATION REPORT ALLOTMENT LETTER.pdf18 Jun 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf18 Jun 2024
Proforma of Agreement for saleFile: 2024 09 14 AFS REDPL.pdf18 Jun 2024
Proforma of Allotment letterFile: DRAFT LBP II - ALLOTMENT LETTER RERA DRAFT.pdf18 Jun 2024
Deviation Report with respect to Allotment letterFile: NO DEVIATION REPORT ALLOTMENT LETTER.pdf18 Jun 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf18 Jun 2024
Proforma of Agreement for saleFile: 2024 09 14 AFS REDPL.pdf18 Jun 2024
Proforma of Allotment letterFile: DRAFT LBP II - ALLOTMENT LETTER RERA DRAFT.pdf18 Jun 2024
Deviation Report with respect to Allotment letterFile: NO DEVIATION REPORT ALLOTMENT LETTER.pdf18 Jun 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf18 Jun 2024
Proforma of Agreement for saleFile: 2024 09 14 AFS REDPL.pdf18 Jun 2024
Copy of the legal title reportFile: Title report .pdf7 Jun 2024
Copy of the legal title reportFile: Title report .pdf7 Jun 2024
Copy of the legal title reportFile: Title report .pdf7 Jun 2024
Other - LegalFile: Conveyance Deed dated 28th March 2007_44-86.pdf30 May 2024
Other - LegalFile: Conveyance Deed dated 28th March 2007_1-43.pdf30 May 2024
Other - LegalFile: Conveyance Deed dated 28th March 2007_87-129.pdf30 May 2024
Other - LegalFile: Conveyance Deed dated 28th March 2007_130-172.pdf30 May 2024

How this compares with Mumbai Suburban

44%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LEELA BUSINESS PARK - II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHER6,700+ in Mumbai Suburban

Builder: ROCKFORT ESTATE DEVELOPERS PRIVATE LIMITED

ROCKFORT ESTATE DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including LEELA BUSINESS PARK - II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LEELA BUSINESS PARK - II is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LEELA BUSINESS PARK - II?

The registered promoter entity is ROCKFORT ESTATE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH2000PTC128295 and GSTIN 27AABCR7896K1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LEELA BUSINESS PARK - II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LEELA BUSINESS PARK - II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LEELA BUSINESS PARK - II?

The professionals named in the filing: Architect: Suhas A. Malavade; Architect: SUHAS MALAVADE; Architect: SOHAM KSHETRAMADE; Engineer: Akshay S. Ambekar; Engineer: AKSHAY AMBEKAR; Chartered Accountant: M R SHARMA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LEELA BUSINESS PARK - II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LEELA BUSINESS PARK - II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LEELA BUSINESS PARK - II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.