LAXMIKRUPA
RG-MH-48878 · RERA P52100045252 · Last updated on MahaRERA portal: 21 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LAXMIKRUPA is a Residential / Group Housing project by GANGOTREE GREENBUILD in Pune, Maharashtra, registered with MahaRERA as P52100045252 on 10 May 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 48 of the 93 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameLAXMIKRUPA
- TypeResidential / Group Housing
- Location
- Lokmanya Colony
- Kothrud
- Haveli
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045252
- ReraGenie IDRG-MH-48878
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 May 2022
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed115 files
Current status
Figures as on 21 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LAXMIKRUPA | NA | 15 | 13 | 40 | 53 | 93 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
LAXMIKRUPA: 89% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 88% |
Progress on shared amenities15
As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed81
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| LAXMIKRUPA CO OP HSG SOCIETY LTD | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| LAXMIKRUPA | NA | Rs 23.04 cr | Rs 21.80 cr |
| - | NA | Rs 1.80 cr | Rs 1.67 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANDEEP HARDIKAR & ASSOCIATES |
| Architect | Abhiraj Mahadik |
| Engineer | Mr Tushar Shivarkar |
| Chartered Accountant | Chandorkar & Limaye |
| Chartered Accountant | Maps & Company Chartered Accountants |
| Partner | Role in project |
|---|---|
| GANGOTREE HOMES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. The Promoter of the project LAXMIKRUPA bearing MahaRERA Registration No. P52100045252 respectfully submits this Explanatory Note while seeking extension of project registration under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016. 2. The project has been physically completed in all respects, which is duly supported by the latest Architect’s Certificate in Form-1 uploaded on the MahaRERA portal. There is no pending construction or incomplete work at the project site. 3. However, due to procedural and administrative delays at the end of the competent authority, the Ful
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500123 | Ram Gawali | GANGOTREE HOMES | 09/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1- LK.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: Eng_LK.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 -LK (2).pdf | 21 Jul 2026 |
| Form 5 (FY 2025-2026)File: Form 5 - Laxmikrupa - 2025-26.pdf | 26 May 2026 |
| Form 2A (FY 2022-2023)File: Form 2A-LK- 2022-23.pdf | 14 May 2026 |
| Form 2A (FY 2023-2024)File: Form 2A-LK- 2023-24.pdf | 14 May 2026 |
| Form 2A (FY 2024-2025)File: Form 2A-LK- 2024-25.pdf | 14 May 2026 |
| Form 2A (FY 2025-2026)File: Form 2A-LK- 2025-26.pdf | 14 May 2026 |
| Withdrawal Update Form 1File: Form 1 - LK.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - LK.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - LK.pdf | 18 Apr 2026 |
| Layout approvalFile: plan 1-5 N.pdf | 5 Mar 2026 |
| Withdrawal Update Form 1File: Form 1_ LK.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - LK.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - LK.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: ARCH-LK.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: ENG-LK.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - LK (2).pdf | 15 Oct 2025 |
| Form 5 (FY 2023-2024)File: Form 5 - LK.pdf | 27 Sep 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - LK.pdf | 27 Sep 2025 |
| Form 5 (FY 2022-2023)File: Laxmikrupa.pdf | 27 Sep 2025 |
| Withdrawal Update Form 1File: Arch_LK.pdf | 16 Jul 2025 |
| Withdrawal Update Form 2File: ENG_LK.pdf | 16 Jul 2025 |
| Withdrawal Update Form 3File: LK_CA.pdf | 16 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch_LK.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -LK.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_LK.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: LK.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG-LK.pdf | 12 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: LK.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch_LK.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LK.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_LK.pdf | 18 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 -LK.pdf | 7 Dec 2024 |
| Building plan approvalFile: 1-5.pdf | 9 Nov 2024 |
| Building plan approvalFile: 2-5.pdf | 9 Nov 2024 |
| Building plan approvalFile: 3-5.pdf | 9 Nov 2024 |
| Building plan approvalFile: 4-5.pdf | 9 Nov 2024 |
| Building plan approvalFile: 5-5.pdf | 9 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: C C 1940.pdf | 9 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-5.pdf | 9 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5-5.pdf | 9 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf | 9 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-5.pdf | 9 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-5.pdf | 9 Nov 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_Merged.pdf | 9 Nov 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Encumbrance concern to Finance (1) (1)-merged.pdf | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LK.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Laxmikrupa Form 3.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LK.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: LK-Sold unsold.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: LK.pdf | 27 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LK.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert - Laxmikrupa.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_CH.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_LK.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: LK.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf | 26 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: LK.pdf | 26 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LK.pdf | 26 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Laxmikrupa.pdf | 27 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: LK.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Laxmikrupa_CA cert.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate-Laxmikrupa.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer - LK.pdf | 16 Jan 2024 |
| Building plan approvalFile: 1_compressed (1).pdf | 10 Nov 2023 |
| Building plan approvalFile: 2_compressed (1).pdf | 10 Nov 2023 |
| Building plan approvalFile: 3_compressed.pdf | 10 Nov 2023 |
| Building plan approvalFile: 4_compressed.pdf | 10 Nov 2023 |
| Building plan approvalFile: 5_compressed.pdf | 10 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1_compressed (1).pdf | 10 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2_compressed (1).pdf | 10 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3_compressed.pdf | 10 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4_compressed.pdf | 10 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5_compressed.pdf | 10 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 10 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LK-Architect Certificate-19-10-23.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Laxmikrupa-16-10-23.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LK-Architect Certificate-19-07-23.pdf | 26 Sep 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SUHRUD | CTS No 1367 Mehendale Garage Road Erandwane Pune | 73 | Completed | Nov 2022 | Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LAXMIKRUPA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kothrud13,700+ in Pune
Filed coordinates, straight-line distance. 252 registered projects within 2 km.
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: GANGOTREE GREENBUILD
Gangotree Greenbuild has 7 registrations on MahaRERA, including Priyadarshan and SUHRUD. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that LAXMIKRUPA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if LAXMIKRUPA is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LAXMIKRUPA?
The registered promoter entity is GANGOTREE GREENBUILD, a partnership as per the filing. Its GSTIN 27AAMFG9762B1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LAXMIKRUPA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against LAXMIKRUPA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for LAXMIKRUPA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LAXMIKRUPA?
The professionals named in the filing: Architect: SANDEEP HARDIKAR & ASSOCIATES; Architect: Abhiraj Mahadik; Engineer: Mr Tushar Shivarkar; Chartered Accountant: Chandorkar & Limaye; Chartered Accountant: Maps & Company Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LAXMIKRUPA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback