Home / Browse projects / Kolhapur, Maharashtra / LAXMI VISHNU RESIDENCY
LAXMI VISHNU RESIDENCY
By LAXMI VISHNU URBAN DEVELOPERS LLP
RG-MH-99444 · RERA P53000018576 · Last updated on MahaRERA portal: 8 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 12 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LAXMI VISHNU RESIDENCY is a Others project by LAXMI VISHNU URBAN DEVELOPERS LLP in Kolhapur, Maharashtra, registered with MahaRERA as P53000018576 on 21 Nov 2018. Possession was promised by 30 Oct 2025 and is now 12 months past that date. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameLAXMI VISHNU RESIDENCY
- TypeOthers
- Location
- STATION ROAD
- NEAR PANCHMUKHI HANUMAN MANDIR NEAR BHARAT MATA HOUSING SOCIETY
- Ichalkaranji (M Cl)
- Hatkanangle
- Kolhapur
- 416115
- Pincode416115
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000018576
- ReraGenie IDRG-MH-99444
Builder
- NameLAXMI VISHNU URBAN DEVELOPERS LLP
- Entity typePartnership
- GSTIN27AAHFL5815F1ZB
- PartnersSANTOSH VISHNU KUPATE, MANISH KISHORILAL AGRAWAL, RAJU SHANKAR CHAVAN, MUKUND MURLIDHAR POTDAR
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on21 Nov 2018
- Promised completion30 Oct 2025
- Revised completionRevised to 30 Oct 2025 (originally 30 Oct 2024)
- Buildings3 building records
- Documents filed62 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LAXMI VISHNU RESIDENCY BUILDING A | NA | 5 | 5 | 0 | 0 | 0 |
| LAXMI VISHNU RESIDENCY BUILDING B | NA | 5 | 0 | 0 | 0 | 0 |
| LAXMI VISHNU RESIDENCY BUILDING C | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 8 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
LAXMI VISHNU RESIDENCY BUILDING A73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
LAXMI VISHNU RESIDENCY BUILDING B73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
LAXMI VISHNU RESIDENCY BUILDING C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 65% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 65% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 70% |
| Water conservation /Rain water harvesting | Yes | 65% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 54% |
| Electrical meter room, sub-station, receiving station | Yes | 65% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VITTHAL DATTATRAY TODKAR |
| Architect | VITTHAL RAJARAM TODKAR |
| Engineer | BANDERAO DATTU VIBHUTE |
| Engineer | MUNIR SHABBIR MANER |
| Engineer | GIRISH ANNASAHEB MOKASHI |
| Chartered Accountant | CA SUNIL K REVANKR |
| Chartered Accountant | SUNIL KESHAV REVANKAR |
| Chartered Accountant | SANTOSH MAHADEV CHAUGALE |
| Chartered Accountant | MAHESH RAMGOPAL PODDAR |
| Partner | Role in project |
|---|---|
| LAXMI VISHNU URBAN DEVELOPERS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo, The Secretary, Maharashtra Real Estate Regulatory Authority (MahaRERA) Subject: Application for Extension of Project Completion Date for [Project Name] - Registration No. P53000018576 Respected Sir/Madam, We representing LAXMI VISHNU URBAN DEVELOPERS, we writing to request an extension of the project completion date for our registered project LAXMI VISHNU RESIDENCY under Section 6 of RERA Act, 2016. We are seeking an extension of 12 months due to the following unavoidable circumstances: 1. COVID-19 Pandemic Impact - Our project operations were significantly affected during the nationwide l
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Nov 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Nov 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Oct 2023
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: 3 Notary Form Bcompressed.pdf | 8 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1A Architecher Certificate Annexture - A FORM 1.pdf | 8 Jul 2025 |
| Certificates of CA (Form 3)File: 1D CA CERTI 3compressed.pdf | 8 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1B Enginner Certificate Annexture - A.pdf | 8 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: 2 Sold Unsold Invertory.pdf | 8 Jul 2025 |
| CERSAI detailsFile: 4 CERSAI DECLARATION.pdf | 8 Jul 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 6 Format A.pdf | 8 Jul 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 5 Annexure A.pdf | 8 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1C Form 2A Quality Assurance certificte.pdf | 8 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1F From 5 - 2024 Annexure F.pdf | 8 Jul 2025 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 6 Nov 2023 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 6 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate LLP.pdf | 30 Oct 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Certificate LLP.pdf | 30 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTREST.pdf | 30 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter.pdf | 25 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter.pdf | 25 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificte Annexure B_compressed.pdf | 25 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificte Annexure B_compressed.pdf | 25 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf | 25 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate B Buidling.pdf | 25 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Annexure.pdf | 24 Oct 2023 |
| Declaration about Commencement CertificateFile: Building Sold Details-Form D.pdf | 23 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate -Annexure C - Form 2A.pdf | 23 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Building Sold Details-Form D.pdf | 23 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Letter.pdf | 23 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate A Building.pdf | 23 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate A Building.pdf | 23 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf | 2 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf | 2 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Lakshmi Vishnu form 5 2019-20.pdf | 23 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Lakshmi Vishnu form five 2020 21.pdf | 23 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Lakshmi Vishnu form 5 202122.pdf | 23 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19 1 Annual Audit Report of Statutory CA (Form 5).pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5)File: LAXMI VISHNU.pdf | 28 Sep 2019 |
| Building plan approvalFile: BUILDING-A-PLAN.pdf | 5 Nov 2018 |
| Building plan approvalFile: BUILDING-B-PLAN.pdf | 5 Nov 2018 |
| Building plan approvalFile: BUILDING-C-PLAN.pdf | 5 Nov 2018 |
| Layout approvalFile: BUILDING-A-PLAN.pdf | 5 Nov 2018 |
| Layout approvalFile: BUILDING-B-PLAN.pdf | 5 Nov 2018 |
| Layout approvalFile: BUILDING-C-PLAN.pdf | 5 Nov 2018 |
| PAN CardFile: Firm Pan Card.pdf | 5 Nov 2018 |
| Copy of the legal title reportFile: PROPERTY CARD.pdf | 5 Nov 2018 |
| Copy of the legal title reportFile: SEARCH REPORT.pdf | 5 Nov 2018 |
| Details of encumbrancesFile: ENCRUBRANCE.pdf | 5 Nov 2018 |
| Copy of Layout Approval (in case of layout)File: BUILDING-A-PLAN.pdf | 5 Nov 2018 |
| Copy of Layout Approval (in case of layout)File: BUILDING-B-PLAN.pdf | 5 Nov 2018 |
| Copy of Layout Approval (in case of layout)File: BUILDING-C-PLAN.pdf | 5 Nov 2018 |
| Building Plan Approval (IOD)File: BUILDING-A-PLAN.pdf | 5 Nov 2018 |
| Building Plan Approval (IOD)File: BUILDING-B-PLAN.pdf | 5 Nov 2018 |
| Building Plan Approval (IOD)File: BUILDING-C-PLAN.pdf | 5 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION.pdf | 5 Nov 2018 |
| Declaration in FORM BFile: FORM B.pdf | 5 Nov 2018 |
| Certificates of CA (Form 3)File: CA CERTIFICATE.pdf | 5 Nov 2018 |
| Proforma of Allotment letterFile: SALE DEED.pdf | 5 Nov 2018 |
| OtherFile: GST Certificate.pdf | 5 Nov 2018 |
| OtherFile: Potdar.pdf | 5 Nov 2018 |
| OtherFile: Mete.pdf | 5 Nov 2018 |
| OtherFile: Kupte.pdf | 5 Nov 2018 |
| OtherFile: Chavan.pdf | 5 Nov 2018 |
| OtherFile: Agrawal.pdf | 5 Nov 2018 |
| OtherFile: RERA DECLARATION.pdf | 5 Nov 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep LAXMI VISHNU RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR PANCHMUKHI HANUMAN MANDIR NEAR BHARAT MATA HOUSING SOCIETY880+ in Kolhapur
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
Gajalaxmi Park
Amit Yashwant Singh and Others
Vrindavan Paradise
HBD DEVELOPERS
Vihanga Residency
INDO BUILDCON DEVELOPERS
CHOUNDESHWARI PLANET
VIJAY VIRUPAKSHA GALGALE
VATHARE ELITES
JAHIR CHANDSAB SOUDAGAR
NISARGAYAN
SIDRA DEVELOPERS
See every Kolhapur project, with the district possession charts
Builder: LAXMI VISHNU URBAN DEVELOPERS LLP
LAXMI VISHNU URBAN DEVELOPERS LLP has 1 registration on MahaRERA, including LAXMI VISHNU RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What does it mean that LAXMI VISHNU RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if LAXMI VISHNU RESIDENCY is delayed beyond 30 Oct 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LAXMI VISHNU RESIDENCY?
The registered promoter entity is LAXMI VISHNU URBAN DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AAHFL5815F1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LAXMI VISHNU RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for LAXMI VISHNU RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LAXMI VISHNU RESIDENCY?
The professionals named in the filing: Architect: VITTHAL DATTATRAY TODKAR; Architect: VITTHAL RAJARAM TODKAR; Engineer: BANDERAO DATTU VIBHUTE; Engineer: MUNIR SHABBIR MANER; Engineer: GIRISH ANNASAHEB MOKASHI; Chartered Accountant: CA SUNIL K REVANKR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LAXMI VISHNU RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback