Completed No litigation declared Residential / Group Housing project

Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137

By POOJA CONSTRUCTIONS

RG-MH-22960 · RERA P50500047883 · Last updated on MahaRERA portal: 8 Jul 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137 is a Residential / Group Housing project by POOJA CONSTRUCTIONS in Nagpur, Maharashtra, registered with MahaRERA as P50500047883 on 1 Dec 2022. The registration is recorded completed; possession was promised by 31 Mar 2024.

At a glance

Project

  • NameLaxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137
  • TypeResidential / Group Housing
  • Location
    • NA
    • Chinchbhawan
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440025
  • Pincode440025
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500047883
  • ReraGenie IDRG-MH-22960

Builder

  • NamePOOJA CONSTRUCTIONS
  • Entity typePartnership
  • GSTIN27AAJFP1925C1ZG
  • PartnerRukmini Krishnkant Prasad
  • Partner (Authorized Signatory)Krishnakant Prasad
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredDec 2022PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Dec 2022
  • Promised completion31 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Laxmi Pooja Multi Family Residential UnitNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Laxmi Pooja Multi Family Residential Unit: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area397 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
M/s Dimensions InfratechNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI1143.77
Proposed, not sanctioned1,144 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSomalwada ,Wardha Road ,Nagpur

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB R Sharma
EngineerB R Sharma
Chartered AccountantCA Abhinav Welekar
PartnerRole in project
POOJA CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Jun 2024

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 15-03-2024.pdf8 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf11 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2_Form 5 15-03-2024.pdf1 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2_Form 5 15-03-2024.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5_Form 1 15-03-2024.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5_FOrm 2 15-03-2024.pdf22 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 15-03-2024.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: 5_Annexure 29 15-03-2024.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6_Form 3 15-03-2024.pdf22 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 with stamp.pdf8 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-2023.pdf16 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-2023.pdf16 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-2023.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: Annexure 29 31-12-2023.pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed 31-12-2023.pdf16 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_Form 1 30-09-2023.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4_Form 2 30-09-2023.pdf8 Dec 2023
Disclosure of sold/ booked inventoryFile: 4_Annexure 29 30-9-2023.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_Form 3 signed 30-09-2023.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-2022.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2023.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2023.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-2022.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2023.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2023.pdf29 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31-03-2023.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: annexure 29 31-12-2022.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: Annexure 29 31-03-2023.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: Annexure 29 30-06-2023.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 31-12-2022.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 31-03-2023.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 30-06-2023.pdf29 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 31-03-2023.pdf29 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect cert.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Cert.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: 11_Annexure 29.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3.pdf20 Oct 2023
Proforma of Allotment letterFile: 9_New ATS after scrutiny with sign.pdf24 Nov 2022
Proforma of Agreement for saleFile: 9_New ATS after scrutiny with sign.pdf24 Nov 2022
Proforma of Agreement for saleFile: 9_New ATS after scrutiny with sign.pdf24 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3.pdf1 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200248539784_For_Asset_Based_Search_30_09_2022_12_04_46_534.pdf30 Sep 2022
Details of encumbrances concerned to FinanceFile: 5A_ Financial Encumbrance.pdf29 Sep 2022
Layout approvalFile: 10 MAP - Copy.pdf26 Sep 2022
Building plan approvalFile: 10 MAP - Copy.pdf26 Sep 2022
PAN CardFile: Pooja Construction PAN.pdf26 Sep 2022
Copy of the legal title reportFile: 4 Search Report.pdf26 Sep 2022
Details of encumbrances concerned to LegalFile: 5B_Legal and Litigation Encumbrance.pdf26 Sep 2022
Copy of Layout Approval (in case of layout)File: 10 MAP - Copy.pdf26 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: 10 MAP - Copy.pdf26 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 7 Building Sanction.pdf26 Sep 2022
Declaration about Commencement CertificateFile: 12_Circular 32.pdf26 Sep 2022
Declaration in FORM BFile: 6 Form B.pdf26 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect cert.pdf26 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Cert.pdf26 Sep 2022
Proforma of Allotment letterFile: 8_Allotment Lettetr.pdf26 Sep 2022
Proforma of Agreement for saleFile: 8_Allotment Lettetr.pdf26 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 14_ Declaration for Bank Edited.pdf26 Sep 2022
Deviation Report with respect to Allotment letterFile: 15_Deviation for Allotment Letter.pdf26 Sep 2022
Deviation Report with respect to model copy of AgreementFile: 13_Deviation for ATS.pdf26 Sep 2022

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Laxmi Pooja Multi Family Residential Unit on on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chinchbhawan2,800+ in Nagpur

2 kmLaxmi Pooja Multi FamilyCompleted 9Lapsed / revoked 1Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: POOJA CONSTRUCTIONS

pooja constructions has 4 registrations on MahaRERA, including Pooja Vertex Apartment and Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137 is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137?

The registered promoter entity is POOJA CONSTRUCTIONS, a partnership as per the filing. Its GSTIN 27AAJFP1925C1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137?

The professionals named in the filing: Architect: B R Sharma; Engineer: B R Sharma; Chartered Accountant: CA Abhinav Welekar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 137. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Laxmi Pooja Multi Family Residential Unit on to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.