Home / Browse projects / Nagpur, Maharashtra / Laxmi Nagar-3

Registered No litigation declared Plotted project

Laxmi Nagar-3

By M/s Shree Realtors

RG-MH-99582 · RERA P50500056179 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
2 of 33Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Laxmi Nagar-3 is a Plotted project by M/s Shree Realtors in Nagpur, Maharashtra, registered with MahaRERA as P50500056179 on 16 May 2024. Possession is promised by 31 Dec 2026. 31 of the 33 units on this registration are recorded sold or booked.

At a glance

Project

  • NameLaxmi Nagar-3
  • TypePlotted
  • Location
    • Nagpur Road
    • Mouza Umergaon
    • Umergaon
    • Nagpur (Rural)
    • Nagpur
    • 441204
  • Pincode441204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500056179
  • ReraGenie IDRG-MH-99582

Builder

  • NameM/s Shree Realtors
  • Entity typePartnership
  • PartnersVishakha Abhinav Welekar, Smita Pravin Dhiran, Gaurav Ishwarchandra Khosla, Pooja Atul Bhaiyya, Sushant Shishir Khangar, Saurabh Khosla HUF, Mansukhlal Vitthaldas saglani
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredMay 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 May 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed97 files

Current status

94%31 of 33 units booked

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on18 Jun 2025

Approvals and building plan

Sanctioning authorityNMRDA

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch H No 228 S No 50 PN 144 Balaji Tower Arvi Road Ward No 7 Gandhi Nagar Wardha-442001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDivine Projects
EngineerDivine Projects
Chartered AccountantDushyant parekh & Co.
Chartered AccountantRahul Panjwani & Co.
PartnerRole in project
M/s Shree Realtors-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Laxmi nagar 3_0001.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 Laxmi nagar 3_0001.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 30-06-2026.pdf16 Jul 2026
Withdrawal Update Form 1File: form 1_0001.pdf9 Jun 2026
Withdrawal Update Form 1File: form 1_0001.pdf9 Jun 2026
Withdrawal Update Form 2File: form 2 31-03-2026_0001.pdf9 Jun 2026
Withdrawal Update Form 2File: form 2 31-03-2026_0001.pdf9 Jun 2026
Withdrawal Update Form 3File: form 3 31-03-2026.pdf9 Jun 2026
Withdrawal Update Form 3File: form 3 31-03-2026.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 Laxmi Nagar 3.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2 Laxmi Nagar 3.pdf30 Jan 2026
Withdrawal Update Form 3File: Laxmi Nagar 3 CA Cer.pdf30 Jan 2026
Withdrawal Update Form 1File: form 1-30-09-2025.pdf1 Nov 2025
Withdrawal Update Form 2File: form-2-30-09-2025.pdf1 Nov 2025
Withdrawal Update Form 3File: Form_3 CA_Cert_1 30-09-2025.pdf1 Nov 2025
Withdrawal Update Form 1File: Form 1 30-06-2025.pdf5 Aug 2025
Withdrawal Update Form 1File: Form 1 30-06-2025.pdf5 Aug 2025
Withdrawal Update Form 2File: Form 2 30-06-2025.pdf5 Aug 2025
Withdrawal Update Form 2File: Form 2 30-06-2025.pdf5 Aug 2025
Withdrawal Update Form 3File: 3_Shree_Realtors_Form-3.pdf5 Aug 2025
Withdrawal Update Form 3File: shree Realtors Laxmi Nagar -3.pdf5 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A Scan.pdf8 Jul 2025
Form 5 (FY 2024-2025)File: Form-5 31-03-2025 Sign - Copy.pdf8 Jul 2025
Form 1File: Form 1 Architect's Certificate 30-06-2024.pdf30 Jun 2025
Form 2File: Form 2 Engineers's Certificate 30-06-24.pdf30 Jun 2025
Form 3File: Form-3 Laxmi Nagar -3 30-6-24.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure-29 30-06-2024.pdf30 Jun 2025
Form 1File: Form 1 Architect's Certificate 30-09-2024.pdf30 Jun 2025
Form 2File: Form 2 Engineer's Certificate 30-09-24.pdf30 Jun 2025
Form 3File: Form-3 30-09-2024.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure-29 30-09-2024.pdf30 Jun 2025
Form 1File: 1_FORM-1.pdf30 Jun 2025
Form 2File: 2_Form-2.pdf30 Jun 2025
Form 3File: 3_Form-3 31-12-2024.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure-29 31-12-2024.pdf30 Jun 2025
Form 1File: Form-1 31-03-2025.pdf30 Jun 2025
Form 2File: Form-2 31-03-2025.pdf30 Jun 2025
Form 3File: FORM 3 31-03-2025.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure-29 Sold Unsold Inventory 31-03-2025.pdf30 Jun 2025
Withdrawal Update Form 1File: 1_Architect certificate umargaon.pdf30 Jun 2025
Withdrawal Update Form 2File: 2_Engineer certificate umargaon.pdf30 Jun 2025
Withdrawal Update Form 3File: 3_Shree_Realtors_Form-3.pdf30 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Shree Realtors.pdf6 May 2025
Form-1 31-03-202529 Apr 2025
Form-2 31-03-202529 Apr 2025
Disclosure of sold/ booked inventoryFile: Annexure-29 Sold Unsold Inventory 31-03-2025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-03-2025.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_FORM-1.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form-2.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-12-2024.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Annexure-29 31-12-2024.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Dec-24 Laxmi Nagar-3.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate 30-06-2024.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate 30-09-2024.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers's Certificate 30-06-24.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate 30-09-24.pdf25 Dec 2024
Disclosure of sold/ booked inventoryFile: Annexure-29 30-06-2024.pdf25 Dec 2024
Disclosure of sold/ booked inventoryFile: Annexure-29 30-09-2024.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Laxmi Nagar -3 30-6-24.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-2024.pdf24 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separation Bank Account.pdf12 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Architect certificate umargaon.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engineer certificate umargaon.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Shree_Realtors_Form-3.pdf13 Apr 2024
Other - LegalFile: Shree Raltors Partnership Cert.pdf13 Apr 2024
Other - LegalFile: 23_Sale Deed_Full - Copy.pdf13 Apr 2024
Other - LegalFile: 18_Clarification about Plot Area.pdf13 Apr 2024
Layout approvalFile: 10_Map.pdf12 Apr 2024
Building plan approval or NA orderFile: 7_CC Tentative Sanctioned.pdf12 Apr 2024
PAN CardFile: SHREE REALTORS PAN CARD.pdf12 Apr 2024
Copy of the legal title reportFile: 4_Search Report.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: 5A_Financial Encumbrance.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: 5B_Legal encumbrance.pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: 5A_Financial Encumbrance.pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: 5B_Legal encumbrance.pdf12 Apr 2024
Copy of Layout Approval (in case of layout)File: 10_Map.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_CC Tentative Sanctioned.pdf12 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: 7_CC Tentative Sanctioned.pdf12 Apr 2024
Declaration about Commencement CertificateFile: 12_Declaration about Commencement certificate.pdf12 Apr 2024
Declaration in FORM BFile: 6_Form B.pdf12 Apr 2024

How this compares with Nagpur

94%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Laxmi Nagar-3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mouza Umergaon2,800+ in Nagpur

2 kmLaxmi Nagar-3Lapsed / revoked 2Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: M/s Shree Realtors

M/s Shree Realtors has 3 registrations on MahaRERA, including Shree Laxmi Nagar - 2 , Residential Layout Plan for Kh No 28/1 and 28/2 and Laxmi Nagar-3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Laxmi Nagar-3 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Laxmi Nagar-3?

The registered promoter entity is M/s Shree Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Laxmi Nagar-3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Laxmi Nagar-3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Laxmi Nagar-3?

The professionals named in the filing: Architect: Divine Projects; Engineer: Divine Projects; Chartered Accountant: Dushyant parekh & Co.; Chartered Accountant: Rahul Panjwani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Laxmi Nagar-3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Laxmi Nagar-3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Laxmi Nagar-3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.