Home / Browse projects / Mumbai Suburban, Maharashtra / Lawns And Beyond - Phase 3, Omkar International District

Registered No litigation declared Residential / Group Housing project

Lawns And Beyond - Phase 3, Omkar International District

By Omkar Ventures Pvt. Ltd.

RG-MH-64440 · RERA P51800014037 · Last updated on MahaRERA portal: 15 Jul 2024

Source: official MahaRERA filing

Red flags

  • 73 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 48 months from the original
13 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 62%
73Complaints at MahaRERAon this registration
Jump to the 178 documents Report an error

Lawns And Beyond - Phase 3, Omkar International District is a Residential / Group Housing project by Omkar Ventures Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014037 on 7 Nov 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 48 months from the original filing. 73 complaints are on record with the regulator.

At a glance

Project

  • NameLawns And Beyond - Phase 3, Omkar International District
  • TypeResidential / Group Housing
  • Location
    • -
    • Mogra
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800014037
  • ReraGenie IDRG-MH-64440

Builder

  • NameOmkar Ventures Pvt. Ltd.
  • Entity typeCompany
  • CINU70102MH2013PTC239568
  • DirectorKIRIT MEHTA
  • Other registrations4 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2017First promiseMar 2023Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2017
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Mar 2023)
  • Buildings3 building records
  • Documents filed178 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FLORESTA-INA250000
FLORESTA-JNA250000
FLORESTA-KNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 62%.

FLORESTA-I36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
FLORESTA-J51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
FLORESTA-K39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor34%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 15 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Fitness CentreYes0%

Parking filed341

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots341
Closed/Covered341
BuildingClosed/CoveredTotal
FLORESTA-I7575
FLORESTA-J147147
FLORESTA-K119119

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,815 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
OMKAR ANDHERI REALTORS PVT. LTD.BhosariMumbai City
NIRMAN REALTORS PVT. LTD.BhosariMumbai City
GOLDEN AGE INFRASTRUCTUREBhosariMumbai City
VIMAL ASSOCIATESBhosariMumbai City

Approvals and building plan

Permissible FSI21587.13
Proposed, not sanctioned19,675 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUNIT NO G01 AND G02A GROUND FLOOR VALUE ENCLAVE PLOT NO 55A DR AMBEDKAR ROAD SION MUMBAI MAHARASHTRA

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANAND V DHOKAY AAAPD3944L
EngineerPrasad Sheety
Chartered AccountantSSMG & Associates LLP
Chartered AccountantNeelesh Jain & Associates
PartnerRole in project
Omkar Ventures Pvt. Ltd.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019449Mar 2023 → Mar 2027

Reason as filed by the promoterThe reasons for seeking extension which were beyond the control of Promoter are briefly set out hereunder: A. Discontinuation of Subvention Scheme: B. Economic downturn and Demonetization: C. Promoters Account became NPA: D. Force majeure (COVID 19 Pandemic): E. Delay caused due to Status Quo/Injunction on G Wing Lawns & Beyond for demolition of structures

EXT51800013523Mar 2023 → Mar 2024

Reason as filed by the promoterDue to Covid-19 Pandemic and other force majeure reasons, there has been a delay in the construction completion of the project. Hence, we request this Hon’ble Authority to grant us extension for completion of project till 29th March, 2024 and oblige.

Litigation declared26

CaseCourtStatus
339/2017CITY CIVIL COURT DINDOSHIMatter adjourned there is no adverse order
1109/2017CITY CIVIL COURT DINDOSHIMatter adjourned there is no adverse order
2557/2017CITY CIVIL COURT DINDOSHIMatter adjourned there is no adverse order
352/2013HIGH COURTMatter adjourned there is no adverse order
262/2016Small Causes CourtMatter adjourned there is no adverse order
414/2017High court of BombayFor Hearing
38/2015High court of BombayFor Hearing
1221/2018High court of BombayFor Hearing
120/2017High court of BombayFor Hearing
2096/2018City Civil court DindoshiFor Hearing
2097/2018City Civil court DindoshiFor Hearing
2098/2018City Civil court DindoshiFor Hearing
2099/2018City Civil court DindoshiFor Hearing
2117/2018City Civil court DindoshiFor Hearing
1918/2018City Civil court DindoshiFor Hearing
1919/2018City Civil court DindoshiFor Hearing
79/2017AGRCFor Hearing
2828/2018Bhoiwada Dadar MumbaiFor hearing
2829/2018Bhoiwada Dadar MumbaiFor hearing
2827/2018Bhoiwada Dadar MumbaiFor hearing
2956/2018Bhoiwada Dadar MumbaiFor hearing
2957/2018Bhoiwada Dadar MumbaiFor hearing
3225/2018Bhoiwada Dadar MumbaiFor hearing
0700034/2019Bhoiwada Dadar MumbaiFor hearing
251/SS/2019Bhoiwada Dadar MumbaiFor hearing
3521/2019National Company Law Tribunal Mumbai Bench MumbaiFor hearing

Complaints filed with MahaRERA73

Case no.ComplainantRespondentFiled
CC006000000012352SARFARAZ SHEIKHOMKAR VENTURE PVT LTD11/12/2017
CC006000000194400Siddhima KotakOmkar Ventures Private Limited14/10/2020
CC006000000171776Amit Arora and Rishu AroraM/s Omkar Ventures Pvt. Ltd05/12/2019
CC006000000194409HEMANT TIWARIOmkar Ventures PVT LTD..17/10/2020
CC006000000194412PREETI PRABHAKAR INDULKAROmkar Ventures private Limited14/10/2020
CC006000000194415Namrata ChainaniOmkar Ventures Private Limited14/10/2020
CC006000000194450Samarjeet SolankiOmkar Ventures Pvt. Ltd.16/10/2020
CC006000000194475Abhay GhardeOmkar Venture Private Limited16/10/2020
CC006000000194470NAVIN CHATTERJEEOMKAR VENTURES PRIVATE LIMITED16/10/2020
CC006000000194462Anil NairOmkar Ventures Private Limted17/10/2020
CC006000000194447Faiz WahabOmkar Ventures Private Limited16/10/2020
CC006000000194453TANUSREE KUMAROMKAR VENTURES PRIVATE LIMITED16/10/2020
CC006000000194517ROBIN CHACKOOMKAR VENTURES PRIVATE LIMITED17/10/2020
CC006000000194491NIKHIL SURESH SANGOLEOmkar Ventures Private Limited17/10/2020
CC006000000194455KAMLESH DHARAMDAS MERCHANTOMKAR VENTURES PRIVATE LIMITED17/10/2020
CC006000000194483Vishal Kamal SharmaOmkar Ventures Pvt Ltd16/10/2020
CC006000000194454Shelton George DsouzaOMKAR VENTURES PRIVATE LIMITED16/10/2020
CC006000000194502Glen Ashwin MenezesOMKAR VENTURES PRIVATE LIMITED17/10/2020
CC006000000194458CHANDNI TALREJAOMKAR VENTURES PRIVATE LIMITED17/10/2020
CC006000000194478ANAND KAMLAKAR MALADKAROmkar Ventures Private Limited17/10/2020
CC006000000194469Kamakshi RahejaOmkar Ventures Private Limited16/10/2020
CC006000000194476Mohammad AquibOmkar Ventures Private Limited16/10/2020
CC006000000194499Mohammed AquibOmkar Ventures Private Limited17/10/2020
CC006000000194438Karanjeet Singh BediOmkar Ventures Private Limited16/10/2020
CC006000000194473Alok UpadhyayOmkar Ventures Private Limited16/10/2020
CC006000000194509GAURAV PRADEEP KHUTAFALEOMKAR VENTURES PRIVATE LIMITED17/10/2020
CC006000000194467GOPALKRISHNA DIGAMBAR DAWANEOMKAR VENTURES PRIVATE LIMITED16/10/2020
CC006000000194492Swapnil Hiraman PachnekarOmkar Ventures private Limited16/10/2020
CC006000000194549Vicky VasnaniOmkar ventures private limited17/10/2020
CC006000000194548Kirtikumar Naranbhai PatelOmkar Ventures Private Limited17/10/2020
CC006000000194543Vivek ManjrekarOmkar ventures private limited17/10/2020
CC006000000194556Kajal Manhar GadhiaOmkar Ventures Private Limited18/10/2020
CC006000000194559Kajal Manhar GadhiaOmkar Ventures Private Limited18/10/2020
CC006000000194557Mayank R BhattiOmkar Ventures Pvt Ltd18/10/2020
CC006000000194560APURVA PRABHAKAR MAYEKAROMKAR VENTURES PRIVATE LIMITED18/10/2020
CC006000000195442Chetan PanchalOmkar Ventures Private Limited30/12/2020
CC006000000197086Mr Deepak Kumar AroraOmkar Ventures Private Limited29/05/2021
CC006000000196767Mr. Girish Bhatia and Mrs. Chandni BhatiaOmkar ventures (P) Ltd.21/04/2021
CC006000000197599Krishnan Subramanian and Mrs. Latha SubramanianOmkar Ventures and Private Ltd., & other14/07/2021
CC006000000197825Kamal Manohar JumaniOmkar Ventures Pvt. Ltd.30/07/2021
CC006000000199066Avanish MehrotraOmkar Ventures Private Limited18/11/2021
CC006000000210020Omkar Ventures Private LimitedMr. Gopalkrishna D Dawnne17/02/2022
CC006000000210019Omkar Ventures Private LimitedMr. Alok Upadhyay, Varuna Upadhyay & Piramal Housing finance Limited17/02/2022
CC006000000210023Omkar Ventures Private LimitedNavin Chatterjee Preeti Chatterjee & Axis Bank17/02/2022
CC006000000210031Omkar Ventures Private LimitedVicky Vasnani & Piramal Housing Finance Limited18/02/2022
CC006000000210033Omkar Ventures Private LimitedVivek Vasant Manjrekar16/02/2022
CC006000000210034Omkar Ventures Private LimitedMrs Kamakshi Raheja Mr Mukesh Raheja & Housing Development Finance Corporation Limited16/02/2022
CC006000000210041Omkar Ventures Private LimitedMohammad Aquib Shaikh & Alimuddin Shaikh & Axis bank Ltd16/02/2022
CC006000000210043Omkar Ventures Private LimitedNikhil Sangole & Tejashri Sangole & Piramal Capital & Housing finance Limited16/02/2022
CC006000000210044Omkar Ventures Private LimitedMayank Rajpal Bhatti & Sweta M Bhatti & Axis Bank Ltd18/02/2022
CC006000000210081Omkar Ventures Private LimitedGaurav Pradeep Khutafale & Ors And Housing Development Finance Corporation18/02/2022
CC006000000210084Omkar Ventures Private LimitedAvanish Mehrotra & Preeti Mehrotra And Indiabulls Housing Finance Limited19/02/2022
CC006000000210085Omkar Ventures Private LimitedVishal Sharma And Piramal Housing finance Limited18/02/2022
CC006000000210086Omkar Ventures Private LimitedAnil Nair & Abha Nair And Axis Bank Ltd19/02/2022
CC006000000210093Omkar Ventures Private LimitedAbhay Gharde & Vanessa Gharde And Axis Bank Ltd.19/02/2022
CC006000000210097Omkar Ventures Private LimitedKajal Gadhia & Bharti Gadhia & Kunal B And Piramal Capital & Housing Finance Ltd19/02/2022
CC006000000210150Omkar Ventures Private LimitedChetan Panchal & Gagan Panchal01/03/2022
CC006000000251550Manomay Ventures Private Limited NIL NILSurbhi Shah and Aditya Shah22/06/2022
CC006000000375016Mrs.Sulabha Dilip MantriOmkar Ventures Private Limited01/04/2023
CC006000000395523PRASAD GANPAT RAGJIOMKAR VENTURES PVT. LTD AND OTHERS17/05/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed178

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 178 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate- Annexure -1(Q1)30062024(Phase-3).pdf15 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -1-Phase III-(Q1)30062024.pdf15 Jul 2024
Certificates of CA (Form 3)File: Phase -3.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY- Phase 3(Wing I).pdf5 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY- Phase 3(Wing J).pdf5 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY- Phase 3(Wing K).pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Year2020214(dated01012022).pdf2 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Year202122(dated01012023).pdf2 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Year 2022234(dated01012024).pdf2 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ganesh.pdf2 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Kirit.pdf2 Jul 2024
Proforma of Agreement for saleFile: AFS.pdf2 Jul 2024
Layout approvalFile: Phase 3.pdf25 Jun 2024
Building plan approvalFile: Phase 3.pdf25 Jun 2024
Copy of Layout Approval (in case of layout)File: Phase 3.pdf25 Jun 2024
Building Plan Approval (IOD)File: Phase 3.pdf25 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: March 20-3.pdf19 Jun 2024
Building plan approvalFile: Wing-I.pdf6 Jun 2024
Building plan approvalFile: Wing-J.pdf6 Jun 2024
Building plan approvalFile: Wing-K.pdf6 Jun 2024
Building Plan Approval (IOD)File: Wing-I.pdf6 Jun 2024
Building Plan Approval (IOD)File: Wing-J.pdf6 Jun 2024
Building Plan Approval (IOD)File: Wing-K.pdf6 Jun 2024
Building plan approvalFile: Phase 3.pdf31 May 2024
Building Plan Approval (IOD)File: Phase 3.pdf31 May 2024
Building plan approvalFile: Sale building no highlited.pdf24 May 2024
Building plan approvalFile: Wng O-min.pdf24 May 2024
Building plan approvalFile: Wing P-min (1).pdf24 May 2024
Building plan approvalFile: Wing N-min.pdf24 May 2024
Building Plan Approval (IOD)File: Sale building no highlited.pdf24 May 2024
Building Plan Approval (IOD)File: Wng O-min.pdf24 May 2024
Building Plan Approval (IOD)File: Wing P-min (1).pdf24 May 2024
Building Plan Approval (IOD)File: Wing N-min.pdf24 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PhaseIII31032024.pdf22 May 2024
Certificates of CA (Form 3)File: Phase III - Form-3 March -2024.pdf20 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Phase 3 - March 19.pdf16 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Phase 3 - March 22.pdf16 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Phase 3 - March 23.pdf16 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062017.pdf30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062018.pdf30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062019.pdf30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092017.pdf30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092019.pdf30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092019.pdf30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092019-.pdf30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31122017.pdf30 Apr 2024
Certificates of CA (Form 3)File: Q1202324_compressed.pdf25 Apr 2024
Certificates of CA (Form 3)File: Q2202324_compressed (1).pdf25 Apr 2024
Certificates of CA (Form 3)File: Q2202324.pdf25 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30032018.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062017.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092018.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31032019.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31122018.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31062019.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31122019.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062021.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092021.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31032021.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31122021.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062021.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092021.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092022.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31032022.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062022.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092022.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31032022.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31032023.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062023.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092023.pdf20 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31122023.pdf20 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032020.pdf2 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062020.pdf2 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092020.pdf2 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30122020.pdf2 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032021.pdf2 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30062021.pdf2 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30092021.pdf2 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30122021.pdf2 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30032022.pdf2 Apr 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lawns And Beyond - Phase 3, Omkar Internatio on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mogra6,700+ in Mumbai Suburban

2 kmLawns And Beyond - PhaseCompleted 88Lapsed / revoked 49Abeyance 1Other 111Dot size: filed unitsN

Filed coordinates, straight-line distance. 249 registered projects within 2 km.

Builder: Omkar Ventures Pvt. Ltd.

Omkar Ventures Pvt. Ltd. has 5 registrations on MahaRERA, including Lawns And Beyond - Phase 2, Omkar International District and Lawns And Beyond - Phase 3, Omkar International District. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Lawns And Beyond - Phase 3, Omkar International District is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lawns And Beyond - Phase 3, Omkar International District?

The registered promoter entity is Omkar Ventures Pvt. Ltd., a company as per the filing. Its CIN U70102MH2013PTC239568 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lawns And Beyond - Phase 3, Omkar International District?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lawns And Beyond - Phase 3, Omkar International District?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lawns And Beyond - Phase 3, Omkar International District?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lawns And Beyond - Phase 3, Omkar International District?

The professionals named in the filing: Architect: ANAND V DHOKAY AAAPD3944L; Engineer: Prasad Sheety; Chartered Accountant: SSMG & Associates LLP; Chartered Accountant: Neelesh Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lawns And Beyond - Phase 3, Omkar International District?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lawns And Beyond - Phase 3, Omkar International District. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lawns And Beyond - Phase 3, Omkar Internatio to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.