Home / Browse projects / Thane, Maharashtra / LARKINS 315 FIO-A

Registered No litigation declared Residential / Group Housing project

LARKINS 315 FIO-A

By M/S PUSHPAK DEVELOPERS

RG-MH-28847 · RERA P51700027115 · Last updated on MahaRERA portal: 27 Nov 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
7 of 11Construction stages donefurthest along: Internal walls, 95%
1Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

LARKINS 315 FIO-A is a Residential / Group Housing project by M/S PUSHPAK DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700027115 on 19 Nov 2020. Possession is promised by 30 Dec 2026. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLARKINS 315 FIO-A
  • TypeResidential / Group Housing
  • Location
    • OFF EASTERN EXPRESS HIGHWAY
    • PANCH PAKHADI
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700027115
  • ReraGenie IDRG-MH-28847

Builder

  • NameM/S PUSHPAK DEVELOPERS
  • Entity typePartnership
  • PartnersPRAVINCHANDRA GANGJI GALA, HEMAL JAYENDRA GALA, KUNAL PRAVINCHANDRA GALA, NAINESH CHAMPAKLAL SHETH, KEKIN DINESH RAMBHIA, MEHUL BHAVANJI MAMANIA
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2020First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Nov 2020
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FIONA320000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

FIO: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,622 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI18646.0
Proposed, not sanctioned18,646 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHigh Street Mall, Kapurbawadi Junction, Majiwade, Thane West, 400607

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
M/S PUSHPAK DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700009799Dec 2024 → Jun 2026

Reason as filed by the promoterSince Unified Development Control and Promotion Regulations for State of Maharashtra are made applicable to the Project, the Promoters have obtained revised sanction from the concerned Authority.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000397250M/S PUSHPAK DEVELOPERSKUNAL DATTARAM NILWARA31/08/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Nov 2024

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4-Architect Certificate-Fio A.pdf27 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4-Fio A.pdf15 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Fio A.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-FIO A-Q1-2024-25.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Fio A -Q2-2024-25.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Engineers Certificate _Larkins 315_q3.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Engineers Certificate _ Larkins 315_q4.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pushpak Developers _Form 3 CA Certificate q4-24_compressed.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pushpak Developers _ Form 3 CA Certificate q1-25_compressed.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Larkins 315 Pushpak Developers q3.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Larkins 315 Pushpak Developers q4.pdf14 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 2A-FIO A-2023-24.pdf13 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: C C Sale Bldg A.pdf6 Nov 2024
Declaration about Commencement CertificateFile: Declaration of CC sale bldg Fio A.pdf6 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023_24 FIO A.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Fio A 31122023.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Fio A-Q4.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Fio A-07-07-2023.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Fio A-30-06-2023.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Fio A-30-09-2023.pdf11 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-FIO A-03-05-2023.pdf24 Nov 2023
Declaration about Commencement CertificateFile: Fio A-CC Declaration-03-05-2023.pdf24 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4-Form-2-Fio A-07-04-2023.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4-Form 3-Fio A- 29-08-2023.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Fio A-2022-23-30-09-2023.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Fio A-March 2023.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Fio A-June 2023.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Fio A-Sept 2023.pdf16 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Fio A-2022-23.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1-Architect Certificate-Fio A-Q4.pdf10 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer-Larkins 315-A-Jan 2023.pdf18 Feb 2023
Disclosure of sold/ booked inventoryFile: Larkins 315 A Disclosure.pdf18 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-LARKINS 315 A-Jan 2023-1.pdf18 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1-Form 2-FIO A-07-07-2022.pdf10 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2-Form 2-FIO A-07-10-2022.pdf10 Jan 2023
Disclosure of sold/ booked inventoryFile: Q1-FIO-A-Disclosure of Accounts.pdf10 Jan 2023
Disclosure of sold/ booked inventoryFile: Q2-FIO-A-Disclosure of Accounts.pdf10 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1-Form-3-FIO A-08-09-2022.pdf10 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2-Form-3-FIO-A-07-10-2022.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-22-Form 5-FIO A-30-09-2022.pdf10 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 LARKINS FIO A SEPT 2022.pdf24 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A LARKINS FIO A 2021-22.pdf24 Nov 2022
Declaration about Commencement CertificateFile: CC DECLARATION 20 NOV 2022.pdf7 Nov 2022
Layout approvalFile: FIO A SANCTION 20 OCT 2022.pdf3 Nov 2022
Copy of Layout Approval (in case of layout)File: FIO A SANCTION 20 OCT 2022.pdf3 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: FIO A CC 20 OCT 2022.pdf3 Nov 2022
Declaration about Commencement CertificateFile: CC Declaration PUSHPAK LARKINS FIO A.pdf13 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Larkins 315 FIO A Architect RERA Certificate June 2022.pdf12 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pushpak Developers-Architect Certificate 31032022 FIO315.pdf7 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: LARKINS FIO A CC.pdf28 Jun 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold 30092021.pdf9 May 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold 31122021.pdf9 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate Q2 202122.pdf9 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 Pushpak Developers Q3 2021-22.pdf9 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineers Quality Assurance -2020-21 Pushpak Developers.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Pushpak-Form-05-LARKINS 315 FIO-A.pdf30 Sep 2021
Declaration about Commencement CertificateFile: Declaration C C - August 2021.pdf9 Aug 2021
OtherFile: Consent for Correction 14-2.pdf23 Jul 2021
Declaration about Commencement CertificateFile: Format D Declaration.pdf22 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold.pdf10 Jun 2021
Layout approvalFile: Layout Fio A.pdf8 Jun 2021
Building plan approvalFile: Plan Fio A.pdf8 Jun 2021
Copy of Layout Approval (in case of layout)File: Layout Fio A.pdf8 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan Fio A.pdf8 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Fio A.pdf8 Jun 2021
Declaration in FORM BFile: Declaration Form B Fio A.pdf8 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Fio A.pdf8 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Fio A.pdf8 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountant Certificate Fio A.pdf8 Jun 2021
Proforma of Allotment letterFile: Larkins 315-Agreement for Sale.pdf8 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Commencement Certificate Fio A.pdf8 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC .pdf12 Nov 2020
Layout approvalFile: LAYOUT PLAN-converted_compressed.pdf9 Nov 2020
Building plan approvalFile: Building Plan (1).pdf9 Nov 2020
PAN CardFile: Pan Card_Pushpak.pdf9 Nov 2020
Copy of the legal title reportFile: Title Certificate of vinod sharma (2).pdf9 Nov 2020
Details of encumbrancesFile: Index-2-Reconveyance.pdf9 Nov 2020
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN-converted_compressed.pdf9 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan (1).pdf9 Nov 2020
Declaration in FORM BFile: Affidavit -Fio A-Form B (2).pdf9 Nov 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LARKINS 315 FIO-A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANCH PAKHADI7,600+ in Thane

2 kmLARKINS 315 FIO-ACompleted 39Lapsed / revoked 30Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: M/S PUSHPAK DEVELOPERS

M/S PUSHPAK DEVELOPERS has 3 registrations on MahaRERA, including 315 Avenue and LARKINS 315 FIO-A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if LARKINS 315 FIO-A is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LARKINS 315 FIO-A?

The registered promoter entity is M/S PUSHPAK DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LARKINS 315 FIO-A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LARKINS 315 FIO-A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LARKINS 315 FIO-A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in LARKINS 315 FIO-A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LARKINS 315 FIO-A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LARKINS 315 FIO-A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.