ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / LALANI GOODWILL BUILDING NO 1

Registered No litigation declared Residential / Group Housing project

LALANI GOODWILL BUILDING NO 1

By LALANI CONSTRUCTIONS PRIVATE LIMITED

RG-MH-23753 · RERA P51800079065 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 50%
69 of 94Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

LALANI GOODWILL BUILDING NO 1 is a Residential / Group Housing project by LALANI CONSTRUCTIONS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079065 on 3 Feb 2025. Possession is promised by 30 Jun 2028. 25 of the 94 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameLALANI GOODWILL BUILDING NO 1
  • TypeResidential / Group Housing
  • Location
    • KAVIVARYA PANDIT INDRA MARG
    • J. B. NAGAR
    • Kondivita
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • RERA no.P51800079065
  • ReraGenie IDRG-MH-23753

Builder

  • NameLALANI CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2025PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2025
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Current status

27%25 of 94 units booked
15.7%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA141348048
Wing BNA131246046

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

Wing A37%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
Wing B37%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes10%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed136

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots136
Closed/Covered136
BuildingClosed/CoveredTotal
Wing A6868
Wing B6868

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,951 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jul 2025
LandownerVillageDistrict
Goodwill CHSLKondivitaMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7291.0
Proposed, not sanctioned5,203 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGRD AND FIRST FLOOR THE SHELTER 32ND RD NEAR R D NATIONAL COLLEGE BANDRA W MUMBAI MAHARASHTRA 400050
Estimated costRs 99.63 cr
Cost incurredRs 15.61 cr
Work done15.67%
BuildingWingEstimatedIncurred
-NARs 49.81 crRs 7.81 cr
Wing ANARs 24.91 crRs 3.90 cr
Wing BNARs 24.91 crRs 3.90 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYUNUS ZOEB JHAVERI
ArchitectManisha L Awasthi
EngineerNasib Nuruddin Bhulani
Chartered AccountantR MEHTA & ASSOCIATES
Chartered AccountantMANISH FOFARIA AND CO
PartnerRole in project
LALANI CONSTRUCTIONS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: LGW1 form 2A Engg Certi 31-03-2026 .pdf29 May 2026
Withdrawal Update Form 1File: LGW1 form1 Arch Certi 31-03-2026.pdf25 May 2026
Withdrawal Update Form 2File: LGW1 form 2 Engg Certi 31-03-2026.pdf25 May 2026
Withdrawal Update Form 3File: LGW1 Form 3 CA Certi 30-09-2025.pdf25 May 2026
Building plan approvalFile: LGW 1 1418 Amended IOD.pdf28 Nov 2025
Building plan approvalFile: amended 1od plan 1418 bldg-1_compressed-1.pdf28 Nov 2025
Building plan approvalFile: amended 1od plan 1418 bldg-1_compressed-2.pdf28 Nov 2025
Building plan approvalFile: amended 1od plan 1418 bldg-1_compressed-3.pdf28 Nov 2025
Building plan approvalFile: amended 1od plan 1418 bldg-1_compressed-4.pdf28 Nov 2025
Building plan approvalFile: amended 1od plan 1418 bldg-1_compressed-5.pdf28 Nov 2025
Building plan approvalFile: amended 1od plan 1418 bldg-1_compressed-6.pdf28 Nov 2025
Withdrawal Update Form 1File: LGW1 Form 1 Arch Certi 30-09-2025.pdf27 Nov 2025
Withdrawal Update Form 2File: LGW1 Form 2 Engg Certi 30-09-2025.pdf27 Nov 2025
Withdrawal Update Form 3File: LGW1 Form 3 CA Certi 30-09-2025.pdf27 Nov 2025
Withdrawal Update Form 1File: LGW1 Form 1 Arch Certi 31-03-2025.pdf26 Nov 2025
Withdrawal Update Form 1File: LGW1 Form 1 Arch Certi 30-06-2025.pdf26 Nov 2025
Withdrawal Update Form 1File: LGW1 Form 1 Arch Certi 30-06-2025.pdf26 Nov 2025
Withdrawal Update Form 2File: LGW1 Form 2 Engg Certi 31-03-2025.pdf26 Nov 2025
Withdrawal Update Form 2File: LGW1 Form 2 Engg Certi 30-06-2025.pdf26 Nov 2025
Withdrawal Update Form 2File: LGW1 Form 2 Engg Certi 30-06-2025.pdf26 Nov 2025
Withdrawal Update Form 3File: LGW1 Form 3 CA Certi 31-03-2025.pdf26 Nov 2025
Withdrawal Update Form 3File: LGW1 Form 3 CA Certi 30-06-2025.pdf26 Nov 2025
Withdrawal Update Form 3File: LGW1 Form 3 CA Certi 30-06-2025.pdf26 Nov 2025
Form 5 (FY 2024-2025)File: LGW1 Form 5 CA Annual Certi 31-03-2025.pdf20 Aug 2025
Form 2A (FY 2024-2025)File: Bldg1ENGINEERS CERTIFICATE 2A 31-03-25.pdf13 Aug 2025
Form 1File: Form-1 ARCHITECTS CERTIFICATE FOR 31-03-25.pdf30 Jul 2025
Form 2File: Form-2 ENGINEERS CERTIFICATE 2 31-03-25.pdf30 Jul 2025
Form 3File: Form - 3 CA Cert-31-03-2025 LG-1.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: inventory.pdf30 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert-31-03-2025 LG-1.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FOR 31-03-25.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 2 31-03-25.pdf5 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEERS CERTIFICATE 2A 31-03-25.pdf5 Apr 2025
Details of encumbrances concerned to FinanceFile: Bldg1 Encumbrances.pdf8 Feb 2025
Details of encumbrances concerned to LegalFile: Bldg1 Encumbrances.pdf8 Feb 2025
Details of encumbrances concerned to FinanceFile: Bldg1 Encumbrances.pdf8 Feb 2025
Details of encumbrances concerned to LegalFile: Bldg1 Encumbrances.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaraton Soc Members Amount.pdf29 Jan 2025
Copy of the legal title reportFile: 1Title Rpt.pdf25 Jan 2025
Details of encumbrances concerned to FinanceFile: 1Legal Encumbrances.pdf25 Jan 2025
Details of encumbrances concerned to LegalFile: 1Legal Encumbrances.pdf25 Jan 2025
Other - LegalFile: Proforma of Agreement For Sale.pdf22 Jan 2025
Other - LegalFile: CC CTS Corrigendum Ltr BMC .pdf22 Jan 2025
Other - LegalFile: Declaration about Commencement Certificate Lg 1.pdf22 Jan 2025
Layout approvalFile: Plan1 building No1.pdf15 Jan 2025
Copy of Layout Approval (in case of layout)File: Plan1 building No1.pdf15 Jan 2025
Other - FinanceFile: declaration regarding allotment 59 members .pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1Form 3CA Certificat.pdf8 Jan 2025
Declaration about Commencement CertificateFile: CTS No Declaration.pdf3 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: 1 Disclosure for Secured Unsecured Finanace Building No 1.pdf3 Jan 2025
Declaration about Commencement CertificateFile: CC Declaration Bldg 1 .pdf2 Jan 2025
Other - TechnicalFile: Order 50 Declaration .pdf2 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: SGL DISCLOSURE OF INTREST.pdf2 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: LSL DISCLOSURE OF INTREST .pdf2 Jan 2025
Building plan approvalFile: 6.pdf27 Dec 2024
Building plan approvalFile: 5.pdf27 Dec 2024
Building plan approvalFile: 4.pdf27 Dec 2024
Building plan approvalFile: 3.pdf27 Dec 2024
Building plan approvalFile: 2.pdf27 Dec 2024
Building plan approvalFile: 1.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf27 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: 1418 FirstCC_signed_241226_154200.pdf19 Dec 2024
CERSAI detailsFile: CERSAIBldg1.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg1.pdf18 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A RERABankAccountBldg1 .pdf18 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Lalani Goodwill Deviation report Agreement for sale.pdf18 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Lalalni Goodwill Disclower of Interest .pdf18 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: HDFC Bldg 1 .pdf18 Dec 2024
Proforma of Allotment letterFile: Allotment letter.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi1.pdf17 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation report Allotment letter Lalani Goodwill.pdf17 Dec 2024
Proforma of Agreement for saleFile: FINAL Agreeement for Sale Goodwill 11122024.pdf17 Dec 2024
Details of encumbrances concerned to FinanceFile: Lalani Goodwill Bldg 1 Encumbrance Con to Finance.pdf16 Dec 2024
Declaration in FORM BFile: Form B Goodwill Rera.pdf16 Dec 2024
Details of encumbrances concerned to LegalFile: Lalani Goodwill Bldg 1 Encumbrance Con to Finance.pdf16 Dec 2024

How this compares with Mumbai Suburban

27%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LALANI GOODWILL BUILDING NO 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near J. B. NAGAR6,700+ in Mumbai Suburban

Builder: LALANI CONSTRUCTIONS PRIVATE LIMITED

LALANI CONSTRUCTIONS PRIVATE LIMITED has 3 registrations on MahaRERA, including LALANIBUSINESSPARK and Lalani Goodwill Building No 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LALANI GOODWILL BUILDING NO 1 is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LALANI GOODWILL BUILDING NO 1?

The registered promoter entity is LALANI CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LALANI GOODWILL BUILDING NO 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LALANI GOODWILL BUILDING NO 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LALANI GOODWILL BUILDING NO 1?

The professionals named in the filing: Architect: YUNUS ZOEB JHAVERI; Architect: Manisha L Awasthi; Engineer: Nasib Nuruddin Bhulani; Chartered Accountant: R MEHTA & ASSOCIATES; Chartered Accountant: MANISH FOFARIA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LALANI GOODWILL BUILDING NO 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LALANI GOODWILL BUILDING NO 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LALANI GOODWILL BUILDING NO 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.