Red flags

  • Litigation declared, 6 cases
  • 18 complaints at MahaRERA
  • Completion date moved by 48 months
  • 3 extensions taken
  • Rs 200.00 crore secured on the land, in favour of JM Financial Credit Solutions Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 48 months from the original
2 of 11Construction stages donefurthest along: Stilt Floor, 80%
19 of 75Units unsoldnot recorded sold or booked
18Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

LAKE RIVIERA WING C is a Residential / Group Housing project by PASHMINA REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018480 on 5 Nov 2018. Possession is promised by 30 Dec 2027. The completion date has moved by 48 months from the original filing. 56 of the 75 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 18 complaints are on record with the regulator.

At a glance

Project

  • NameLAKE RIVIERA WING C
  • TypeResidential / Group Housing
  • Location
    • IRB ROAD
    • CHANDIVALI
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800018480
  • ReraGenie IDRG-MH-46492

Builder

  • NamePASHMINA REALTY PRIVATE LIMITED
  • Entity typeCompany
  • DirectorAMIT JHA
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2018First promiseDec 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Nov 2018
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed84 files

Current status

75%56 of 75 units booked
72.2%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAKE RIVIERA WING CNA24175075

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.

LAKE RIVIERA WING C: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth60%
Stilt Floor80%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises9%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area333 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofJM Financial Credit Solutions Limited
Secured amountRs 200.00 crore
CERSAI search filedYes
Declared on28 Oct 2025
LandownerVillageDistrict
EKTA HOUSING PVT LTD ( AS DEVELOPMENT MANAGER)AndheriMumbai Suburban

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI5878.03
Proposed, not sanctioned4,029 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch485 WEST VIEW CHS VEER SAVARKAR MARG PRABHADEVI MUMBAI 400025
Estimated costRs 48.73 cr
Cost incurredRs 35.19 cr
Work done72.21%
BuildingWingEstimatedIncurred
LAKE RIVIERA WING CNARs 41.67 crRs 35.19 cr
-NARs 7.05 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHUBHAM INGAWALE
ArchitectM/s. Aakar Architects & Consultants
EngineerJW CONSULTANTS LLP STR/J/26
Chartered AccountantBrijesh Baranwal
PartnerRole in project
PASHMINA REALTY PRIVATE LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800016509Dec 2023 → Dec 2024

Reason as filed by the promoterThe SRA issued the First Stop Work Order dated 31st March, 2021 and the construction vis-à-vis the project was stopped. The SRA withdrew the First Stop Work Order on 22nd April, 2021. The SRA issued the Second Stop Work Order dated 25th May, 2022 and the construction vis-à-vis the project was again stopped, causing further loss of time and monies as well. Thereafter, the SRA issued the S. 53(1) Notice under the MRTP dated 20th July, 2022 in furtherance of the Second Stop Work Order. After 5 months and constant deliberation, representations and requests the SRA vide its Withdrawal of Second Sto

EXT51800017012Dec 2023 → Jun 2025

Reason as filed by the promoterWe are filing this Application in order to seek an exclusion of time of 6 (six) months that was unproductive and unused due to the stop work notices issued by the Slum Rehabilitation Authority during the course of the said Project being registered with RERA.

EA03112518224Dec 2023 → Dec 2027

Reason as filed by the promoterReasons for Delay (a)Subsequent Civil Aviation Clearance and Revised Height Restrictions:-Although the project had obtained the requisite building permissions and Commencement Certificate from the Planning Authority based on the approvals prevailing at the relevant time, subsequent to such approvals, additional conditions and clearance requirements were imposed by the Civil Aviation Authorities/Airports Authority of India due to the project's location within the regulated funnel zone of the airport. The revised Civil Aviation requirements necessitated obtaining fresh clearances, submission of

Litigation declared6

CaseCourtStatus
5/2015High CourtPending
CC006000000375395/2023Maharashtra Real Estate Regulatory AuthorityOngoing
CC006000000397380/2023Maharera Real Estate Regulatory AuthorityOngoing
CC006000000397222/2023Maharashtra Real Estate Regulatory AuthorityOngoing
CC006000000408224/2023Maharashtra Real Estate Regulatory AuthorityOngoing
CC06000000510676/2024Maharashtra Real Estate Regulatory AuthorityOngoing

Complaints filed with MahaRERA18

Case no.ComplainantRespondentFiled
CC006000000397222MRS SANTOSH BANSALPASHMINA REALTY PVT LTD29/08/2023
CC006000000397330GAURAV GWALIAPASHMINA REALTY PVT LTD03/09/2023
CC006000000397380VICKRANT BAJARIAPASHMINA REALTY PVT LTD11/09/2023
CC006000000408224Rahul Sudhir BaisakhiyaPashmina Realty Pvt. Ltd.27/12/2023
CC006000000510676JATIN JANAK SIRSIKARPASHMINA REALTY PVT LTD12/06/2024
CC12503093PASHMINA REALTY PRIVATE LIMITEDMrs Santosh Bansal03/09/2025
CC12503095PASHMINA REALTY PRIVATE LIMITEDVickrant Bajaria03/09/2025
CC12503096PASHMINA REALTY PRIVATE LIMITEDRahul Baisakhiya03/09/2025
CC12503097PASHMINA REALTY PRIVATE LIMITEDJatin Janak Sirsikar03/09/2025
CC12600554MITI CHAKRABORTYPASHMINA REALTY PRIVATE LIMITED01/02/2026
CC12504157Ankush Anoop KannawPASHMINA REALTY PRIVATE LIMITED25/11/2025
CC12504164Pradeep MendonPASHMINA REALTY PRIVATE LIMITED25/11/2025
CC12504593Sanket Hanmantrao Jambure DeshmukhPASHMINA REALTY PRIVATE LIMITED23/12/2025
CC12600845Saikat RoyPASHMINA REALTY PRIVATE LIMITED15/02/2026
CC12604113Minie VarghesePASHMINA REALTY PRIVATE LIMITED01/07/2026
CC12604336Naeem KachwalaPASHMINA REALTY PRIVATE LIMITED11/07/2026
CC12604337Shamina Saif KachwalaPASHMINA REALTY PRIVATE LIMITED11/07/2026
CC12604791Hanoze Pervez MistryPASHMINA REALTY PRIVATE LIMITED30/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 MAR 25.pdf29 Jun 2026
Form 2File: Form 2 MAR 25 C Wing.pdf29 Jun 2026
Form 3File: Form 3 MAR 25 C Wing.pdf29 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold -C WING.pdf29 Jun 2026
Form 1File: FORM 1 DEC 23.pdf13 Jan 2026
Form 2File: FORM 2 DEC23.pdf13 Jan 2026
Form 3File: FORM 3 DEC 23.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH23.pdf13 Jan 2026
Form 1File: FORM 1 DEC 23.pdf13 Jan 2026
Form 2File: FORM 2 DEC23.pdf13 Jan 2026
Form 3File: FORM 3 DEC 23.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH23.pdf13 Jan 2026
Form 1File: FORM 1 MARCH 24.pdf13 Jan 2026
Form 2File: FORM 2 MARCH 24.pdf13 Jan 2026
Form 3File: FORM 3 MAY 24.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH24.pdf13 Jan 2026
Form 1File: FORM 1 JUNE 24.pdf13 Jan 2026
Form 2File: FORM 2 JUNE 24.pdf13 Jan 2026
Form 3File: FORM 3 JUNE 24.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH24.pdf13 Jan 2026
Withdrawal Update Form 1File: Form 1 C Wing.pdf31 Oct 2025
Withdrawal Update Form 1File: Form 1 C Wing.pdf31 Oct 2025
Withdrawal Update Form 2File: FORM 2 MAHA RERA.pdf31 Oct 2025
Withdrawal Update Form 2File: FORM 2 MAHA RERA.pdf31 Oct 2025
Withdrawal Update Form 3File: C Wing Form 3.pdf31 Oct 2025
Withdrawal Update Form 3File: C Wing Form 3.pdf31 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 25 Wing C.pdf23 Apr 2025
Certificates of CA (Form 3)File: Form 3 March 25 Wing C.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 C Wing.pdf16 Apr 2025
Certificates of CA (Form 3)File: Form 3 December 24 C.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 December 24 C.pdf20 Jan 2025
Certificates of CA (Form 3)File: C wing june 24.pdf2 Jan 2025
Certificates of CA (Form 3)File: C wing Sep 24.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Certificates of Engineer C.pdf31 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Certificates of Engineer.pdf31 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificates of Architect (Form 1).pdf15 Jul 2024
Certificates of CA (Form 3)File: Form 3 C Wing.pdf26 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- C Wing.pdf27 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Certificates of Engineer.pdf25 Apr 2024
Certificates of CA (Form 3)File: 3 Certificates of CA (Form 3) Q3 2023-24 - C wing.pdf30 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf30 Jan 2024
Certificates of CA (Form 3)File: CA Form 3 C Wing Sep 2023.pdf26 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work.pdf13 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf21 Sep 2023
Declaration in FORM BFile: Form B Wing C Declaration.pdf1 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 LR Wing C 2023.pdf31 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 LR Wing C 2022.pdf31 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Wing C - Quality assurance Certificate 8480 year 21-22.pdf23 May 2023
Disclosure of sold/ booked inventoryFile: Wing C - Inventory details.pdf23 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aakar copy Wing C.pdf2 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Bank Account Wing C.pdf29 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Lake Riviera Nov 22.pdf12 Jan 2023
Declaration about Commencement CertificateFile: Declaration of CC Wing C.pdf12 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Wing C for 31 March 2022.pdf12 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Wing C from 2018 to 2019.pdf12 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Wing C from 2019 to 2020 compressed.pdf12 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Wing C from 2020 to 2021 compressed.pdf12 Jul 2022
Layout approvalFile: Lake Riviera Wing C and D Layout plan.pdf7 Jul 2022
Building plan approvalFile: Pashmina Lake Riviera IOA 2022.pdf7 Jul 2022
Details of encumbrancesFile: Pashmina Realty Lake Riviera Wing C Encumberance Certificate.pdf7 Jul 2022
Copy of Layout Approval (in case of layout)File: Lake Riviera Wing C and D Layout plan.pdf7 Jul 2022
Building Plan Approval (IOD)File: Pashmina Lake Riviera IOA 2022.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Lake Riviera Wing C 31 March 2022.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Lake Riviera Wing C Disclosure of Inventory.pdf7 Jul 2022
Layout approvalFile: 0010 LAYOUT 2.pdf31 Oct 2018
Building plan approvalFile: IOA Composite building 2 compressed.pdf31 Oct 2018
Building plan approvalFile: IOA SALE Building 4 compressed (1).pdf31 Oct 2018
Building plan approvalFile: SALE MERGE PART 1.pdf31 Oct 2018
Building plan approvalFile: sale merge part 2.pdf31 Oct 2018
Copy of the legal title reportFile: TSR- Bharat- Pashmina -JM-ilovepdf-compressed-ilovepdf-compressed.pdf31 Oct 2018
Copy of the legal title reportFile: TSR- Tabela Land- Pashmina- JM-ilovepdf-compressed-ilovepdf-compressed (2).pdf31 Oct 2018
Copy of Layout Approval (in case of layout)File: 0010 LAYOUT 2.pdf31 Oct 2018
Building Plan Approval (IOD)File: IOA Composite building 2 compressed.pdf31 Oct 2018
Building Plan Approval (IOD)File: IOA SALE Building 4 compressed (1).pdf31 Oct 2018
Building Plan Approval (IOD)File: SALE MERGE PART 1.pdf31 Oct 2018
Building Plan Approval (IOD)File: sale merge part 2.pdf31 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf31 Oct 2018
Proforma of Allotment letterFile: Draft AFS.pdf31 Oct 2018

How this compares with Mumbai Suburban

75%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 48 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAKE RIVIERA WING C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHANDIVALI6,700+ in Mumbai Suburban

2 kmLAKE RIVIERA WING CCompleted 44Lapsed / revoked 26Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: PASHMINA REALTY PRIVATE LIMITED

PASHMINA REALTY PRIVATE LIMITED has 3 registrations on MahaRERA, including PASHMINA LOTUS and LAKE RIVIERA WING A AND B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LAKE RIVIERA WING C is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAKE RIVIERA WING C?

The registered promoter entity is PASHMINA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAKE RIVIERA WING C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LAKE RIVIERA WING C?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LAKE RIVIERA WING C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAKE RIVIERA WING C?

The professionals named in the filing: Architect: SHUBHAM INGAWALE; Architect: M/s. Aakar Architects & Consultants; Engineer: JW CONSULTANTS LLP STR/J/26; Chartered Accountant: Brijesh Baranwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAKE RIVIERA WING C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAKE RIVIERA WING C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAKE RIVIERA WING C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.