Home / Browse projects / Mumbai Suburban, Maharashtra / LAKE RIVIERA WING C
LAKE RIVIERA WING C
By PASHMINA REALTY PRIVATE LIMITED
RG-MH-46492 · RERA P51800018480 · Last updated on MahaRERA portal: 29 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 6 cases
- 18 complaints at MahaRERA
- Completion date moved by 48 months
- 3 extensions taken
- Rs 200.00 crore secured on the land, in favour of JM Financial Credit Solutions Limited
- The declared charge does not appear in the CERSAI report on the filing
Clear
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LAKE RIVIERA WING C is a Residential / Group Housing project by PASHMINA REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018480 on 5 Nov 2018. Possession is promised by 30 Dec 2027. The completion date has moved by 48 months from the original filing. 56 of the 75 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 18 complaints are on record with the regulator.
At a glance
Project
- NameLAKE RIVIERA WING C
- TypeResidential / Group Housing
- Location
- IRB ROAD
- CHANDIVALI
- Kurla
- Mumbai Suburban
- 400072
- Pincode400072
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800018480
- ReraGenie IDRG-MH-46492
Builder
- NamePASHMINA REALTY PRIVATE LIMITED
- Entity typeCompany
- DirectorAMIT JHA
- Other registrations2 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Nov 2018
- Promised completion30 Dec 2027
- Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed84 files
Current status
Figures as on 29 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LAKE RIVIERA WING C | NA | 24 | 1 | 75 | 0 | 75 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.
LAKE RIVIERA WING C: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 60% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 9% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| EKTA HOUSING PVT LTD ( AS DEVELOPMENT MANAGER) | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| LAKE RIVIERA WING C | NA | Rs 41.67 cr | Rs 35.19 cr |
| - | NA | Rs 7.05 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHUBHAM INGAWALE |
| Architect | M/s. Aakar Architects & Consultants |
| Engineer | JW CONSULTANTS LLP STR/J/26 |
| Chartered Accountant | Brijesh Baranwal |
| Partner | Role in project |
|---|---|
| PASHMINA REALTY PRIVATE LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe SRA issued the First Stop Work Order dated 31st March, 2021 and the construction vis-à-vis the project was stopped. The SRA withdrew the First Stop Work Order on 22nd April, 2021. The SRA issued the Second Stop Work Order dated 25th May, 2022 and the construction vis-à-vis the project was again stopped, causing further loss of time and monies as well. Thereafter, the SRA issued the S. 53(1) Notice under the MRTP dated 20th July, 2022 in furtherance of the Second Stop Work Order. After 5 months and constant deliberation, representations and requests the SRA vide its Withdrawal of Second Sto
Reason as filed by the promoterWe are filing this Application in order to seek an exclusion of time of 6 (six) months that was unproductive and unused due to the stop work notices issued by the Slum Rehabilitation Authority during the course of the said Project being registered with RERA.
Reason as filed by the promoterReasons for Delay (a)Subsequent Civil Aviation Clearance and Revised Height Restrictions:-Although the project had obtained the requisite building permissions and Commencement Certificate from the Planning Authority based on the approvals prevailing at the relevant time, subsequent to such approvals, additional conditions and clearance requirements were imposed by the Civil Aviation Authorities/Airports Authority of India due to the project's location within the regulated funnel zone of the airport. The revised Civil Aviation requirements necessitated obtaining fresh clearances, submission of
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 5/2015 | High Court | Pending |
| CC006000000375395/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000397380/2023 | Maharera Real Estate Regulatory Authority | Ongoing |
| CC006000000397222/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000408224/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC06000000510676/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
Complaints filed with MahaRERA18
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000397222 | MRS SANTOSH BANSAL | PASHMINA REALTY PVT LTD | 29/08/2023 |
| CC006000000397330 | GAURAV GWALIA | PASHMINA REALTY PVT LTD | 03/09/2023 |
| CC006000000397380 | VICKRANT BAJARIA | PASHMINA REALTY PVT LTD | 11/09/2023 |
| CC006000000408224 | Rahul Sudhir Baisakhiya | Pashmina Realty Pvt. Ltd. | 27/12/2023 |
| CC006000000510676 | JATIN JANAK SIRSIKAR | PASHMINA REALTY PVT LTD | 12/06/2024 |
| CC12503093 | PASHMINA REALTY PRIVATE LIMITED | Mrs Santosh Bansal | 03/09/2025 |
| CC12503095 | PASHMINA REALTY PRIVATE LIMITED | Vickrant Bajaria | 03/09/2025 |
| CC12503096 | PASHMINA REALTY PRIVATE LIMITED | Rahul Baisakhiya | 03/09/2025 |
| CC12503097 | PASHMINA REALTY PRIVATE LIMITED | Jatin Janak Sirsikar | 03/09/2025 |
| CC12600554 | MITI CHAKRABORTY | PASHMINA REALTY PRIVATE LIMITED | 01/02/2026 |
| CC12504157 | Ankush Anoop Kannaw | PASHMINA REALTY PRIVATE LIMITED | 25/11/2025 |
| CC12504164 | Pradeep Mendon | PASHMINA REALTY PRIVATE LIMITED | 25/11/2025 |
| CC12504593 | Sanket Hanmantrao Jambure Deshmukh | PASHMINA REALTY PRIVATE LIMITED | 23/12/2025 |
| CC12600845 | Saikat Roy | PASHMINA REALTY PRIVATE LIMITED | 15/02/2026 |
| CC12604113 | Minie Varghese | PASHMINA REALTY PRIVATE LIMITED | 01/07/2026 |
| CC12604336 | Naeem Kachwala | PASHMINA REALTY PRIVATE LIMITED | 11/07/2026 |
| CC12604337 | Shamina Saif Kachwala | PASHMINA REALTY PRIVATE LIMITED | 11/07/2026 |
| CC12604791 | Hanoze Pervez Mistry | PASHMINA REALTY PRIVATE LIMITED | 30/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2027
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 MAR 25.pdf | 29 Jun 2026 |
| Form 2File: Form 2 MAR 25 C Wing.pdf | 29 Jun 2026 |
| Form 3File: Form 3 MAR 25 C Wing.pdf | 29 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold -C WING.pdf | 29 Jun 2026 |
| Form 1File: FORM 1 DEC 23.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 DEC23.pdf | 13 Jan 2026 |
| Form 3File: FORM 3 DEC 23.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH23.pdf | 13 Jan 2026 |
| Form 1File: FORM 1 DEC 23.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 DEC23.pdf | 13 Jan 2026 |
| Form 3File: FORM 3 DEC 23.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH23.pdf | 13 Jan 2026 |
| Form 1File: FORM 1 MARCH 24.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 MARCH 24.pdf | 13 Jan 2026 |
| Form 3File: FORM 3 MAY 24.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH24.pdf | 13 Jan 2026 |
| Form 1File: FORM 1 JUNE 24.pdf | 13 Jan 2026 |
| Form 2File: FORM 2 JUNE 24.pdf | 13 Jan 2026 |
| Form 3File: FORM 3 JUNE 24.pdf | 13 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH24.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 C Wing.pdf | 31 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 C Wing.pdf | 31 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 MAHA RERA.pdf | 31 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 MAHA RERA.pdf | 31 Oct 2025 |
| Withdrawal Update Form 3File: C Wing Form 3.pdf | 31 Oct 2025 |
| Withdrawal Update Form 3File: C Wing Form 3.pdf | 31 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 25 Wing C.pdf | 23 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 March 25 Wing C.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 C Wing.pdf | 16 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 December 24 C.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 December 24 C.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: C wing june 24.pdf | 2 Jan 2025 |
| Certificates of CA (Form 3)File: C wing Sep 24.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Certificates of Engineer C.pdf | 31 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Certificates of Engineer.pdf | 31 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 23 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificates of Architect (Form 1).pdf | 15 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 C Wing.pdf | 26 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- C Wing.pdf | 27 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Certificates of Engineer.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: 3 Certificates of CA (Form 3) Q3 2023-24 - C wing.pdf | 30 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 30 Jan 2024 |
| Certificates of CA (Form 3)File: CA Form 3 C Wing Sep 2023.pdf | 26 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work.pdf | 13 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 21 Sep 2023 |
| Declaration in FORM BFile: Form B Wing C Declaration.pdf | 1 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 LR Wing C 2023.pdf | 31 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 LR Wing C 2022.pdf | 31 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Wing C - Quality assurance Certificate 8480 year 21-22.pdf | 23 May 2023 |
| Disclosure of sold/ booked inventoryFile: Wing C - Inventory details.pdf | 23 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aakar copy Wing C.pdf | 2 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Bank Account Wing C.pdf | 29 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Lake Riviera Nov 22.pdf | 12 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration of CC Wing C.pdf | 12 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Wing C for 31 March 2022.pdf | 12 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Wing C from 2018 to 2019.pdf | 12 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Wing C from 2019 to 2020 compressed.pdf | 12 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Wing C from 2020 to 2021 compressed.pdf | 12 Jul 2022 |
| Layout approvalFile: Lake Riviera Wing C and D Layout plan.pdf | 7 Jul 2022 |
| Building plan approvalFile: Pashmina Lake Riviera IOA 2022.pdf | 7 Jul 2022 |
| Details of encumbrancesFile: Pashmina Realty Lake Riviera Wing C Encumberance Certificate.pdf | 7 Jul 2022 |
| Copy of Layout Approval (in case of layout)File: Lake Riviera Wing C and D Layout plan.pdf | 7 Jul 2022 |
| Building Plan Approval (IOD)File: Pashmina Lake Riviera IOA 2022.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Lake Riviera Wing C 31 March 2022.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Lake Riviera Wing C Disclosure of Inventory.pdf | 7 Jul 2022 |
| Layout approvalFile: 0010 LAYOUT 2.pdf | 31 Oct 2018 |
| Building plan approvalFile: IOA Composite building 2 compressed.pdf | 31 Oct 2018 |
| Building plan approvalFile: IOA SALE Building 4 compressed (1).pdf | 31 Oct 2018 |
| Building plan approvalFile: SALE MERGE PART 1.pdf | 31 Oct 2018 |
| Building plan approvalFile: sale merge part 2.pdf | 31 Oct 2018 |
| Copy of the legal title reportFile: TSR- Bharat- Pashmina -JM-ilovepdf-compressed-ilovepdf-compressed.pdf | 31 Oct 2018 |
| Copy of the legal title reportFile: TSR- Tabela Land- Pashmina- JM-ilovepdf-compressed-ilovepdf-compressed (2).pdf | 31 Oct 2018 |
| Copy of Layout Approval (in case of layout)File: 0010 LAYOUT 2.pdf | 31 Oct 2018 |
| Building Plan Approval (IOD)File: IOA Composite building 2 compressed.pdf | 31 Oct 2018 |
| Building Plan Approval (IOD)File: IOA SALE Building 4 compressed (1).pdf | 31 Oct 2018 |
| Building Plan Approval (IOD)File: SALE MERGE PART 1.pdf | 31 Oct 2018 |
| Building Plan Approval (IOD)File: sale merge part 2.pdf | 31 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 31 Oct 2018 |
| Proforma of Allotment letterFile: Draft AFS.pdf | 31 Oct 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LAKE RIVIERA WING C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHANDIVALI6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 99 registered projects within 2 km.
AMARYLLIS TOWERS AND PLAZA
NAHAR BUILDERS LTD.
JANGID MEADOWS
JANGID HOME PVT LTD
NAHAR'S CHANDI VALLEY - PHASE I
NAHAR BUILDERS LIMITED
KABRA RESIDENCY PARK
AHINSA BUILDTECH PVT LTD
IBIS at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
BARBET at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
See every Mumbai Suburban project, with the district possession charts
Builder: PASHMINA REALTY PRIVATE LIMITED
PASHMINA REALTY PRIVATE LIMITED has 3 registrations on MahaRERA, including PASHMINA LOTUS and LAKE RIVIERA WING A AND B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if LAKE RIVIERA WING C is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LAKE RIVIERA WING C?
The registered promoter entity is PASHMINA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LAKE RIVIERA WING C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against LAKE RIVIERA WING C?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for LAKE RIVIERA WING C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LAKE RIVIERA WING C?
The professionals named in the filing: Architect: SHUBHAM INGAWALE; Architect: M/s. Aakar Architects & Consultants; Engineer: JW CONSULTANTS LLP STR/J/26; Chartered Accountant: Brijesh Baranwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LAKE RIVIERA WING C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback