Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Litigation declared, 30 cases
- 54 complaints at MahaRERA
- Completion date moved by 30 months
- 3 extensions taken
Clear
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LAKE RIVIERA WING A AND B is a Residential / Group Housing project by PASHMINA REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009353 on 22 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 30 months from the original filing. 124 of the 171 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete. 54 complaints are on record with the regulator.
At a glance
Project
- NameLAKE RIVIERA WING A AND B
- TypeResidential / Group Housing
- Location
- IRB Road
- Near S.M Shetty School
- MHADA Colony 20
- Powai
- Kurla
- Mumbai Suburban
- 400072
- Pincode400072
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800009353
- ReraGenie IDRG-MH-73270
Builder
- NamePASHMINA REALTY PRIVATE LIMITED
- Entity typeCompany
- DirectorAMIT JHA
- Other registrations2 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Aug 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2023)
- Buildings2 building records
- Documents filed121 files
Current status
Figures as on 7 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 22 | 1 | 78 | 0 | 78 |
| WING B | NA | 22 | 1 | 93 | 0 | 93 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 7 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 90%.
WING A84%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
WING B84%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities34
As on 7 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 85% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 80% |
| Water conservation /Rain water harvesting | Yes | 75% |
| Energy managemcnt | Yes | 70% |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| SWIMMING POOL AND KIDS POOL | Yes | 0% |
| ACUPRESSURE PATHWAY | Yes | 0% |
| AIR CONDITIONED HOMES | Yes | 0% |
| BASEMENTS | Yes | 100% |
| Children Play Area | Yes | 0% |
| CLUB HOUSE | Yes | 0% |
| ZEN GARDEN | Yes | 0% |
| E Charging Car Point | Yes | 0% |
| SQUASH COURT | Yes | 0% |
| PARTY LAWN | Yes | 0% |
| OUTDOOR GYM | Yes | 0% |
| OUTDOOR CHESS GARDEN | Yes | 0% |
| MULTIPURPOSE COURT | Yes | 0% |
| MODULAR KITCHEN | Yes | 0% |
| MEDITATION LAWN | Yes | 0% |
| JACUZZI | Yes | 0% |
| HOME AUTOMATION | Yes | 0% |
| GYMNASIUM | Yes | 0% |
| E DECK | Yes | 0% |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| EKTA HOUSING PRIVATE LIMITED | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 49.04 cr | Rs 43.06 cr |
| WING B | NA | Rs 45.83 cr | Rs 40.24 cr |
| - | NA | Rs 5.55 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aakar Architect and Consultants |
| Architect | SHUBHAM INGAWALE |
| Architect | M/s. Aakar Architects & Consultants |
| Engineer | Khushal Hitendra Patel |
| Engineer | JW CONSULTANTS LLP |
| Chartered Accountant | Anil Jain |
| Chartered Accountant | Vikas Khanijo and Associates |
| Chartered Accountant | Brijesh Baranwal |
| Partner | Role in project |
|---|---|
| PASHMINA REALTY PRIVATE LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe SRA issued the First Stop Work Order dated 31st March, 2021 and the construction vis-à-vis the project was stopped. The SRA withdrew the First Stop Work Order on 22nd April, 2021. The SRA issued the Second Stop Work Order dated 25th May, 2022 and the construction vis-à-vis the project was again stopped, causing further loss of time and monies as well. Thereafter, the SRA issued the S. 53(1) Notice under the MRTP dated 20th July, 2022 in furtherance of the Second Stop Work Order. After 5 months and constant deliberation, representations and requests the SRA vide its Withdrawal of Second Sto
Reason as filed by the promoterWe are filing this Application in order to seek an exclusion of time of 6 (six) months that was unproductive and unused due to the stop work notices issued by the Slum Rehabilitation Authority during the course of the said Project being registered with RERA.
Reason as filed by the promoterPLANNING AUTHORITY IS SRA ISSUED BASELESS STOP WORK NOTICE GIVEN ANY REASON OTHER REASON IS COVID 19.ALL THIS PUT LOT OF FINANCIAL BURDEN ON US SO WE ARE SEEKING EXTENSION OF ONE YEAR.ALL RELEVANT DOCUMENT
Litigation declared30
| Case | Court | Status |
|---|---|---|
| 5/2015 | High Court | PENDING |
| CARBPL/6596/2020 | High Court | Pending |
| CC006000000194606/2020 | MahaRera | Closed |
| CC006000000397330/2023 | Maharera - Maharashtra Real Estate Regulatory Authority | Closed |
| CC006000000220881/2022 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CCOO6000000375395/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000397222/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000397380/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000397653/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000397906/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000398038/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000398082/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000408224/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000408438/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000408617/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC06000000408618/2023 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000429174/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000429289/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000510676/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000591023/2024 | Maharashtra Real Estate | Ongoing |
| CC006000000591126/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000591275/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000591303/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC006000000591413/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC12400145/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC12400154/2024 | Maharera Real Estate Regulatory Authority | Ongoing |
| CC12400372/2024 | Maharashtra real Estate Regulatory Authority | Ongoing |
| CC12400373/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC12400646/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
| CC12400721/2024 | Maharashtra Real Estate Regulatory Authority | Ongoing |
Complaints filed with MahaRERA54
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000194606 | Dipti Sharma | Pashmina Developers Private Limited | 22/10/2020 |
| CC006000000220881 | Deepak Sunderdas Nasta | Pashmina Realty Private Ltd | 22/04/2022 |
| CC006000000375395 | POOJA HEGDE | PASHMINA REALTY PVT LTD | 27/04/2023 |
| CC006000000397653 | MAHESH HINGORANI | PASHMINA REALTY PVT LTD | 07/10/2023 |
| CC006000000397906 | Abhay . Kumar | Pashmina Realty Pvt Ltd | 18/10/2023 |
| CC006000000398038 | BHUPENDER SINGH BANGA | PASHMINA REALTY PVT LTD | 02/11/2023 |
| CC006000000398082 | Abhijit Shamkant Atale | PASHMINA REALTY PRIVATE LIMITED | 04/11/2023 |
| CC006000000408438 | Shahazad Shaikh | Pashmina Realty Private Limited | 26/12/2023 |
| CC006000000408617 | Dhananjay . Mishra | Pashmina Realty Pvt Ltd | 23/12/2023 |
| CC006000000408618 | Gul Varwani | Pashmina Realty Pvt Ltd | 23/12/2023 |
| CC006000000429289 | Kamadeep Singh Gora | Pashmina developers | 16/02/2024 |
| CC006000000429174 | HARISH HARLANI | PASHMINA REALTY PRIVATE LIMITED | 04/03/2024 |
| CC006000000500428 | Alok Sinha | Pashmina Realty Private Limited | 14/05/2024 |
| CC006000000591023 | Inderjit Singh Matharu | Pashmina Realty Private Limited | 08/07/2024 |
| CC006000000591126 | Sani Hassanand Parwani | Pashmina Realty Pvt Ltd. | 11/07/2024 |
| CC006000000591275 | UMA SUBRAMANIAN | PASHMINA REALTY PVT LTD | 30/07/2024 |
| CC006000000591303 | Bhagwan Gormukhdas Jeswani | Pashmina Realty Private Ltd | 24/07/2024 |
| CC006000000591413 | Preeti Rakesh Kate | Pashmina Realty Private Ltd | 03/08/2024 |
| CC12400372 | Himanshu Praful Ranvah | PASHMINA REALTY PRIVATE LIMITED | 08/10/2024 |
| CC12400145 | Jatinder Singh Matharu | PASHMINA REALTY PRIVATE LIMITED | 18/09/2024 |
| CC12400154 | Dhrubajyoti Milan Dutta | PASHMINA REALTY PRIVATE LIMITED | 19/09/2024 |
| CC12400373 | MANSI HIMANSHU RANVAH | PASHMINA REALTY PRIVATE LIMITED | 08/10/2024 |
| CC12400721 | Sukumar Ambati | PASHMINA REALTY PRIVATE LIMITED | 10/11/2024 |
| CC12400646 | Rajendra Vithal Bogam | PASHMINA REALTY PRIVATE LIMITED | 04/11/2024 |
| CC12500603 | Mukesh Tekchand Motwani | PASHMINA REALTY PRIVATE LIMITED | 21/02/2025 |
| CC12500616 | PASHMINA REALTY PRIVATE LIMITED | Bhagwan Jeswani and Neelam Jeswani | 22/02/2025 |
| CC12500617 | PASHMINA REALTY PRIVATE LIMITED | Preeti Kate and Rakesh Tibude | 22/02/2025 |
| CC12500618 | PASHMINA REALTY PRIVATE LIMITED | Deepak Nasta | 22/02/2025 |
| CC12501866 | PASHMINA REALTY PRIVATE LIMITED | Dhrubajyoti Dutta | 09/06/2025 |
| CC12501865 | PASHMINA REALTY PRIVATE LIMITED | Inderjit Singh Matharu | 09/06/2025 |
| CC12501867 | PASHMINA REALTY PRIVATE LIMITED | Mr Jatinder Singh Matharu | 09/06/2025 |
| CC12501868 | PASHMINA REALTY PRIVATE LIMITED | Mr Sani Parwani | 09/06/2025 |
| CC12502227 | Dhananjay Badrinarayan Mishra | PASHMINA REALTY PRIVATE LIMITED | 04/07/2025 |
| CC12502236 | Gul Chimanlal Varwani | PASHMINA REALTY PRIVATE LIMITED | 04/07/2025 |
| CC12502461 | PASHMINA REALTY PRIVATE LIMITED | Kamaldeep Singh Gora | 18/07/2025 |
| CC12502462 | PASHMINA REALTY PRIVATE LIMITED | Shahzad Shaikh | 18/07/2025 |
| CC12502463 | PASHMINA REALTY PRIVATE LIMITED | AbhayKumar and Reva Tiwari | 18/07/2025 |
| CC12502466 | PASHMINA REALTY PRIVATE LIMITED | Dhananjay Mishra and Priyanka Mishra | 18/07/2025 |
| CC12502467 | PASHMINA REALTY PRIVATE LIMITED | Gul Varwani | 18/07/2025 |
| CC12502468 | PASHMINA REALTY PRIVATE LIMITED | Himanshu Ranvah | 18/07/2025 |
| CC12502469 | PASHMINA REALTY PRIVATE LIMITED | Mansi Ranvah and Himanshu Ranvah | 18/07/2025 |
| CC12502471 | PASHMINA REALTY PRIVATE LIMITED | Rajendra Bogam | 18/07/2025 |
| CC12502473 | PASHMINA REALTY PRIVATE LIMITED | Sukumar Ambati | 18/07/2025 |
| CC12502474 | PASHMINA REALTY PRIVATE LIMITED | Mukesh Motwani and Ritika Motwani | 18/07/2025 |
| CC12502475 | PASHMINA REALTY PRIVATE LIMITED | Alok Sinha | 18/07/2025 |
| CC12503230 | PASHMINA REALTY PRIVATE LIMITED | Pooja Hegde | 12/09/2025 |
| CC12503233 | PASHMINA REALTY PRIVATE LIMITED | Mahesh Hingorani | 12/09/2025 |
| CC12503234 | PASHMINA REALTY PRIVATE LIMITED | Bhupendra Singh Banga | 12/09/2025 |
| CC12503237 | PASHMINA REALTY PRIVATE LIMITED | Uma Subramanian | 12/09/2025 |
| CC12503667 | Suniil Ajmera | PASHMINA REALTY PRIVATE LIMITED | 15/10/2025 |
| CC12503776 | Shahazad Shaikh | PASHMINA REALTY PRIVATE LIMITED | 29/10/2025 |
| CC12600143 | Nandik Jayantilal Vora | PASHMINA REALTY PRIVATE LIMITED | 09/01/2026 |
| CC12601526 | Sanjay Singh Gussain | PASHMINA REALTY PRIVATE LIMITED | 20/03/2026 |
| CC12603490 | Gul Chimanlal Varwani | PASHMINA REALTY PRIVATE LIMITED | 06/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed121
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 - Lake Riviera-A and B.pdf | 7 Nov 2025 |
| Form 1File: Form 1 March 25 A and B.pdf | 6 Nov 2025 |
| Form 2File: Form 2 Wing AB.pdf | 6 Nov 2025 |
| Form 3File: Form 3 March 25 Wing A and B.pdf | 6 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 March 25 Wing A and B.pdf | 6 Nov 2025 |
| Form 1File: Form 1 March 25 A and B.pdf | 6 Nov 2025 |
| Form 2File: Form 2 Wing AB.pdf | 6 Nov 2025 |
| Form 3File: Form 3 March 25 Wing A and B.pdf | 6 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 March 25 Wing A and B.pdf | 6 Nov 2025 |
| Form 1File: Form 1 March 25 A and B.pdf | 6 Nov 2025 |
| Form 2File: Form 2 Wing AB.pdf | 6 Nov 2025 |
| Form 3File: Form 3 March 25 Wing A and B.pdf | 6 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3 March 25 Wing A and B.pdf | 6 Nov 2025 |
| Form 1File: Form 1 December 24 Aand B.pdf | 6 Nov 2025 |
| Form 2File: Form 2 December 24 Aand B.pdf | 6 Nov 2025 |
| Form 3File: Form 3.pdf | 6 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3.pdf | 6 Nov 2025 |
| Form 1File: Form 1 December 24 Aand B.pdf | 6 Nov 2025 |
| Form 2File: Form 2 December 24 Aand B.pdf | 6 Nov 2025 |
| Form 3File: Form 3.pdf | 6 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3.pdf | 6 Nov 2025 |
| Form 1File: Form 1 December 24 Aand B.pdf | 6 Nov 2025 |
| Form 2File: Form 2 December 24 Aand B.pdf | 6 Nov 2025 |
| Form 3File: Form 3.pdf | 6 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3.pdf | 6 Nov 2025 |
| Form 1File: Form 1 December 24 Aand B.pdf | 6 Nov 2025 |
| Form 2File: Form 2 December 24 Aand B.pdf | 6 Nov 2025 |
| Form 3File: Form 3.pdf | 6 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Form 3.pdf | 6 Nov 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 25 A and B.pdf | 23 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 March 25 Wing A and B.pdf | 16 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Wing AB.pdf | 16 Apr 2025 |
| Declaration in FORM BFile: Form B on feb 25 rera extention.pdf | 20 Feb 2025 |
| Certificates of CA (Form 3)File: FORM 3 PASHMINA (2).pdf | 20 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for FINANCE.pdf | 20 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 17 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventory dated 7 feb 25.pdf | 7 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A quality assurance certifi year 22-23.pdf | 7 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCES.pdf | 29 Jan 2025 |
| Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCES.pdf | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 22 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 24 Aand B.pdf | 20 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 December 24 Aand B.pdf | 20 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December 24 Aand B.pdf | 20 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 Certificates of Architect.pdf | 31 Dec 2024 |
| Certificates of CA (Form 3)File: 7 Certificates of CA.pdf | 31 Dec 2024 |
| Certificates of CA (Form 3)File: 8 Certificates of CA.pdf | 31 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Certificates of Engineer.pdf | 31 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Certificates of Engineer AB.pdf | 31 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Certificates of Engineer AB.pdf | 31 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Certificates of Engineer.pdf | 31 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 19 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 19 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A.pdf | 19 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 18 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 LAKE.pdf | 18 Dec 2024 |
| Proforma of Agreement for saleFile: AFS.pdf | 26 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 23 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 19 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect (Form 1).pdf | 15 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 A and B Wing.pdf | 26 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 17 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Certificates of Engineer.pdf | 25 Apr 2024 |
| Certificates of CA (Form 3)File: 4 Certificates of CA (Form 3) Q3 2023-24.pdf | 30 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 30 Jan 2024 |
| Certificates of CA (Form 3)File: CA Form-3 (A and B wing) Sep 2023.pdf | 26 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 Certificates of Architect (Form 1).pdf | 7 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 22 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect RERA certificate Wing A B.pdf | 12 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory status Wing A B.pdf | 12 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 Pashmina Wing A B.pdf | 12 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Wing A B.pdf | 12 Jun 2023 |
| Declaration in FORM BFile: Form B Wing A B Declaration.pdf | 1 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 LR Wing A B 2023.pdf | 31 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 LR Wing A B 2022.pdf | 31 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Wing AB - Quality assurance Certificate year 19-20.pdf | 23 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Wing AB - Quality assurance Certificate year 20-21.pdf | 23 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Wing AB - Quality assurance Certificate year 21-22.pdf | 23 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 121 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LAKE RIVIERA WING A AND B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near S.M Shetty School, MHADA Colony 20, Powai,6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 84 registered projects within 2 km.
AMARYLLIS TOWERS AND PLAZA
NAHAR BUILDERS LTD.
JANGID MEADOWS
JANGID HOME PVT LTD
NAHAR'S CHANDI VALLEY - PHASE I
NAHAR BUILDERS LIMITED
KABRA RESIDENCY PARK
AHINSA BUILDTECH PVT LTD
IBIS at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
BARBET at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
See every Mumbai Suburban project, with the district possession charts
Builder: PASHMINA REALTY PRIVATE LIMITED
PASHMINA REALTY PRIVATE LIMITED has 3 registrations on MahaRERA, including PASHMINA LOTUS and LAKE RIVIERA WING A AND B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that LAKE RIVIERA WING A AND B shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if LAKE RIVIERA WING A AND B is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LAKE RIVIERA WING A AND B?
The registered promoter entity is PASHMINA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LAKE RIVIERA WING A AND B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against LAKE RIVIERA WING A AND B?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for LAKE RIVIERA WING A AND B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LAKE RIVIERA WING A AND B?
The professionals named in the filing: Architect: Aakar Architect and Consultants; Architect: SHUBHAM INGAWALE; Architect: M/s. Aakar Architects & Consultants; Engineer: Khushal Hitendra Patel; Engineer: JW CONSULTANTS LLP; Chartered Accountant: Anil Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LAKE RIVIERA WING A AND B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback