ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / LAGOM HOMES

Registered No litigation declared Residential / Group Housing project

LAGOM HOMES

By H S ASSOCIATES

RG-MH-16039 · RERA P52100026791 · Last updated on MahaRERA portal: 9 Sep 2026

Source: official MahaRERA filing

Red flags

  • 16 complaints at MahaRERA
  • Completion date moved by 66 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 66 months from the original
22 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 95%
24 of 146Units unsoldnot recorded sold or booked
16Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

LAGOM HOMES is a Residential / Group Housing project by H S ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100026791 on 25 Oct 2020. Possession is promised by 31 Dec 2029. The completion date has moved by 66 months from the original filing. 122 of the 146 units on this registration are recorded sold or booked, and 22 of 33 construction stages are filed complete. 16 complaints are on record with the regulator.

At a glance

Project

  • NameLAGOM HOMES
  • TypeResidential / Group Housing
  • Location
    • Wakadkar Wasti Road
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100026791
  • ReraGenie IDRG-MH-16039

Builder

  • NameH S ASSOCIATES
  • Entity typePartnership
  • PartnerMEHFUZALI SAYYED
  • Other registrations2 more →

Key dates

this monthRegisteredOct 2020First promiseJun 2024Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Oct 2020
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 30 Jun 2024)
  • Buildings3 building records
  • Documents filed103 files

Current status

84%122 of 146 units booked
91.5%Work done, per cost certificate

Figures as on 9 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NANA00000
B WINGNA191973073
C WINGNA191973073

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 9 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 95%.

NA81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
B WING72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
C WING72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 9 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes96%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes90%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed114

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots114
Open Space114
BuildingOpen SpaceTotal
B WING5757
C WING5757

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,925 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Maruti Bhausaheb DeokarWakadPune
Chandrakant Bhausaheb DevkarWakadPune
Gangaram Bhausaheb DevkarWakadPune
Ameet Vilas DevkarWakadPune

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI7004.59
Proposed, not sanctioned1,897 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHinjawadi Road, Hinjawadi, Pune
Estimated costRs 41.30 cr
Cost incurredRs 37.79 cr
Work done91.52%
BuildingWingEstimatedIncurred
NANARs 13.08 crRs 12.12 cr
B WINGNARs 13.08 crRs 12.12 cr
C WINGNARs 13.08 crRs 12.12 cr
-NARs 2.06 crRs 1.45 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKunal Chaudhari
ArchitectManasvi Architect
EngineerHrushikesh
EngineerSK Consultants & Engineers
EngineerRavindra Ashok Karnavat
Chartered AccountantCA Rutuja Narsingh & Associates
Chartered AccountantN B Sayed and Associates
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
H S ASSOCIATES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024053Jun 2024 → Jun 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

EA06122518560Jun 2024 → Jun 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work.

EA29062621597Jun 2024 → Dec 2029

Reason as filed by the promoterThe delay in the completion of the project has primarily occurred due to the time-intensive and ongoing administrative procedures necessary to finalize the land amalgamation and obtain revised layout sanctions from the concerned authorities. Furthermore, the inclusion and physical execution of the proposed high-rise tower and commercial building have substantially increased the overall scale and complexity of the development, resulting in significant additional construction and infrastructure requirements. An extension is crucial to accommodate these ongoing approvals, finish all development a

Complaints filed with MahaRERA16

Case no.ComplainantRespondentFiled
CC12502541Chaitanya SwamiH S ASSOCIATES23/07/2025
CC12502540Sachin BhattadH S ASSOCIATES23/07/2025
CC12502545Dipak MudvikarH S ASSOCIATES23/07/2025
CC12502546Urvesh WaghH S ASSOCIATES23/07/2025
CC12502895Sujay Raosaheb KarbhariH S ASSOCIATES18/08/2025
CC12502896Rahul Rajendra WaghH S ASSOCIATES18/08/2025
CC12502899Jaydeep Kishor AkolkarH S ASSOCIATES18/08/2025
CC12502900Lalit Laxman ShahaneH S ASSOCIATES18/08/2025
CC12502976Sumesh Mulchand BadgeH S ASSOCIATES23/08/2025
CC12503292Amar Maroti BodheH S ASSOCIATES15/09/2025
CC12503489Gaurav GargH S ASSOCIATES29/09/2025
CC12503572Pushparaj Shivling DholeH S ASSOCIATES07/10/2025
CC12504016Jeetakaur Mukhtyarsingh MannH S ASSOCIATES14/11/2025
CC12504332Prashant Balasaheb SarodeH S ASSOCIATES07/12/2025
CC12600190Rohit Ashok Kumar AnandH S ASSOCIATES11/01/2026
CC12604716Chandan Vijaykumar BhagatH S ASSOCIATES27/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A (FY 2024-25).pdf9 Sep 2026
Withdrawal Update Form 1File: Form 1 - Lagom Homes June 2026.pdf4 Sep 2026
Withdrawal Update Form 2File: Form 2 -Lagom Homes June 2026.pdf4 Sep 2026
Withdrawal Update Form 3File: Form 3 - Lagom Homes June 2026b.pdf4 Sep 2026
Withdrawal Update Form 1File: Form 1 - Lagom Homes June 2026.pdf11 Aug 2026
Withdrawal Update Form 2File: Form 2 -Lagom Homes June 2026.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - Lagom Homes June 2026b.pdf11 Aug 2026
Withdrawal Update Form 1File: Lagom_Homes_Form1_Q3_2025-26_25-06-2026_11-31_doc1.pdf26 Jun 2026
Withdrawal Update Form 1File: Lagom_Homes_Form1_Q4_2025-26_22-06-2026_04-52.pdf26 Jun 2026
Withdrawal Update Form 2File: Lagom_Homes_Form2_Q3_2025-26_25-06-2026_11-31_doc1.pdf26 Jun 2026
Withdrawal Update Form 2File: Lagom_Homes_Form2_Q4_2025-26_25-06-2026_11-28_doc1.pdf26 Jun 2026
Withdrawal Update Form 3File: Lagom_Homes_Form3_Q3_2025-26_25-06-2026_11-31_doc1.pdf26 Jun 2026
Withdrawal Update Form 3File: Lagom_Homes_Form3_Q4_2025-26_25-06-2026_11-28_doc1.pdf26 Jun 2026
Withdrawal Update Form 1File: Form 1 - Lagome Homes as on Sep 2025.pdf3 Jan 2026
Withdrawal Update Form 2File: FORM-2_ENGINEER CERTIFICATE_LAGOM HOMES_SEPT-2025.pdf3 Jan 2026
Withdrawal Update Form 3File: Form 3 - Lagom Homes as on Sept 2025.pdf3 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 - Lagom Homes for FY 2024-25.pdf25 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 - Lagom Homes for FY 2023-24.pdf25 Sep 2025
Form 1File: Form 1 Lagom Homes.pdf23 Sep 2025
Form 2File: Form 2 Lagom Homes June 2025.pdf23 Sep 2025
Form 3File: Form 3 Lagom Homes June 2025.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Lagom Homes June 2025.pdf23 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (4)_compressed.pdf1 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lagom Homes as on 31-03-2025 (SIGNED).pdf1 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lagom Homes as on March 2025 (SIGNED).pdf1 Jul 2025
Form 1File: FORM 1 (4)_compressed.pdf1 Jul 2025
Form 2File: Form 2 - Lagom Homes as on March 2025 (SIGNED).pdf1 Jul 2025
Form 3File: Form 3 - Lagom Homes as on 31-03-2025 (SIGNED).pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory (Circular 29)_Lagom Homes.pdf1 Jul 2025
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf24 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Lagom Homes for FY 2023-24.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lagom Home as on June 2024.pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lagom Home as on Sep 2024.pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lagom Home as on Dec 2024.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lagom Homes as on June 2024.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lagom Homes as on Sep 2024.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lagom Homes as on Dec 2024.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lagom Homes as on June 2024.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lagom Homes as on Sep 2024.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lagom Homes as on Dec 2024.pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-30-06-2023_11zon.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-30-09-2023_11zon.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-31-12-2023_11zon.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-31-03-2024_11zon.pdf19 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21.pdf19 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf19 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lagom Homes as on 31-12-2023_compress.pdf18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lagom Homes as on 31-03-2024 (1)_compress.pdf18 Jun 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf18 Jun 2024
Declaration in FORM BFile: Form B Lagom Homes.pdf12 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf12 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24 (1).pdf12 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Format N.pdf12 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details.pdf12 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lagom Homes as on 31-03-2023.pdf2 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lagom Homes as on 30-06-2023.pdf2 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lagom Homes as on 30-09-2023.pdf2 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lagom Homes as on Dec 2023.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lagom Homes as on 31-03-2023.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lagom Homes as on 30-06-2023.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lagom Homes as on 30-09-2023.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lagom Homes as on 31-12-2023.pdf2 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Lagom Homes for FY 22-23.pdf30 Sep 2023
CERSAI detailsFile: RERA CERSAI DECLARATION LAGOM HOMES.pdf27 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LAGOM HOMES 31 03 2021.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LAGOM HOMES 31 12 2021.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LAGOM HOMES 31 03 2022.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LAGOM HOMES 30 06 2022.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LAGOM HOMES 30 09 2022.pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LAGOM HOMES 31 12 2022.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: LAGOM HOMES - FORM 2 A - 19-20.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: LAGOM HOMES - FORM 2 A - 21-22.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: LAGOM HOMES - CERCULAR 29-compressed.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Lagom Homes as on March 2021.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Lagom Homes as on March 2022.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Lagom Homes as on June 2022.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Lagom Homes as on September 2022.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Lagom Homes as on December 2022.pdf12 Apr 2023

How this compares with Pune

84%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 66 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAGOM HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

2 kmLAGOM HOMESCompleted 124Lapsed / revoked 49Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 240 registered projects within 2 km.

Builder: H S ASSOCIATES

H S ASSOCIATES has 3 registrations on MahaRERA, including LAGOM and LAGOM HOMES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if LAGOM HOMES is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAGOM HOMES?

The registered promoter entity is H S ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAGOM HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LAGOM HOMES?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LAGOM HOMES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAGOM HOMES?

The professionals named in the filing: Architect: Kunal Chaudhari; Architect: Manasvi Architect; Engineer: Hrushikesh; Engineer: SK Consultants & Engineers; Engineer: Ravindra Ashok Karnavat; Chartered Accountant: CA Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAGOM HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAGOM HOMES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAGOM HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.