Registration lapsed No litigation declared Residential / Group Housing project

LAABH ENCLAVE- PHASE 2

By VAISHNAVI HOUSING REALTY LLP

RG-MH-92165 · RERA P51700011559 · Last updated on MahaRERA portal: 21 Nov 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 43 months past the filed date
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2023Possession promised43 months past this date
12 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

LAABH ENCLAVE- PHASE 2 is a Residential / Group Housing project by VAISHNAVI HOUSING REALTY LLP in Thane, Maharashtra, registered with MahaRERA as P51700011559 on 31 Aug 2017. Possession was promised by 31 Mar 2023 and is now 43 months past that date. The completion date has moved by 30 months from the original filing.

At a glance

Project

  • NameLAABH ENCLAVE- PHASE 2
  • TypeResidential / Group Housing
  • Location
    • THEMGHAR ROAD
    • BHIWANDI
    • Thane (M Corp.)
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700011559
  • ReraGenie IDRG-MH-92165

Builder

  • NameVAISHNAVI HOUSING REALTY LLP
  • Entity typePartnership
  • PartnersRUPEN THAKKER, DUSHYANT VEDANT, JIGAR THAKKER
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

43 months past promisethis monthRegisteredAug 2017First promiseSep 2020Revised toMar 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion31 Mar 2023
  • Revised completionRevised to 31 Mar 2023 (originally 30 Sep 2020)
  • Buildings2 building records
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAABH ENCLAVE-PHASE 2NA170000
LAABH ENCLAVE - PHASE D WINGNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.

LAABH ENCLAVE-PHASE 290%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
LAABH ENCLAVE - PHASE D WING27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes25%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntYes75%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25
BuildingClosed/CoveredTotal
LAABH ENCLAVE-PHASE 21616
LAABH ENCLAVE - PHASE D WING99

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,810 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
M/S. NEW HORIZON ENTERPRISESThane (M Corp.)Thane

Approvals and building plan

Permissible FSI16210.11
Proposed, not sanctioned10,766 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANDIVALI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS AKRUTI CONSULTANT
EngineerMS TECH LINE
PartnerRole in project
VAISHNAVI HOUSING REALTY LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700006252Sep 2020 → Sep 2021

Reason as filed by the promoterAs on date, we have already constructed 15 floors out of the total 15 floors in C Wing of the project named Laabh Enclave - Phase 2. However, due to the COVID 19 pandemic, the construction of the said Project was halted due to umpteen reasons and therefore obtaining the Occupation Certificate before 30/09/2020 will not be possible. Therefore, due to reasons beyond our control, I hereby request you to permit us to please revise the project completion deadline to 30th September 2021.

EXT51700012472Sep 2020 → Mar 2023

Reason as filed by the promoterThere was a dispute with the neighbouring plot which is now settled and now an application with planning authority for amendment of plan is submitted. After the approval of application for amendment of plan, the process of applying for OC will begin.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Nov 2023

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Wing C Occupation Certificate.pdf21 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cert_6_30432_194541_442_41.pdf18 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 31032022 Vaishanvi.pdf13 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf17 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf17 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf17 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf17 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf17 Nov 2022
Certificates of CA (Form 3)File: form 3 upload.pdf17 Nov 2022
PAN CardFile: DocScanner Aug 17, 2022 11-04.pdf17 Aug 2022
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD.pdf6 Jul 2022
Certificates of CA (Form 3)File: Signed Form-31032022-Form 3.pdf28 Jun 2022
Declaration about Commencement CertificateFile: New Document(46).pdf16 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: rera form 2 31122021.pdf16 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Certificate (2).pdf16 Jun 2022
Certificates of CA (Form 3)File: Signed Form 3 30062021.pdf16 Jun 2022
Certificates of CA (Form 3)File: Signed Form 3 30092021.pdf16 Jun 2022
Certificates of CA (Form 3)File: Signed Form 3 31122021.pdf16 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200237779899_For_Asset_Based_Search_20_05_2022_17_47_04_963.pdf24 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA NEW HORIZON.pdf14 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate to Vaishanavi Housing177.pdf14 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Rera Vaishnavi.pdf14 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2020.pdf10 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep 2020.pdf10 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SCAN_20200701_123332498_001.pdf10 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SCAN_20210528_125120769_001.pdf10 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SCAN_20210528_125120769_003.pdf10 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VAISHNAVI RERA (2)-1-2.pdf10 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VAISHNAVI RERA (2)-3-4.pdf10 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: New Horizon Rera 311221.pdf10 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf10 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sep 2020.pdf10 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 2020.pdf10 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: March 2021.pdf10 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Certificate (1)-1-4.pdf10 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Certificate (1)-5-8.pdf10 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Vaishnavi Housing Realty LLP 132.pdf10 May 2022
Certificates of CA (Form 3)File: Form 3 (1)_compressed.pdf10 May 2022
Certificates of CA (Form 3)File: Form 3 30092020 vaishnavi.pdf10 May 2022
Certificates of CA (Form 3)File: Form 3 31122020 Vaishnavicompressed.pdf10 May 2022
Certificates of CA (Form 3)File: Form 3 31032021 Vaishnavi compressed.pdf10 May 2022
Certificates of CA (Form 3)File: Form 3 dec 19.pdf9 Jul 2021
Certificates of CA (Form 3)File: Form 3mar20.pdf9 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Vaishnavi.pdf8 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf1 Jul 2021
OtherFile: Wing D.pdf8 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1.pdf8 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf8 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf8 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Certificate.pdf11 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf30 Jun 2020
Certificates of CA (Form 3)File: FORM 3.pdf29 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf28 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf28 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf30 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf30 Sep 2019
Certificates of CA (Form 3)File: FORM 3.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf6 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Certificate (7).pdf6 Aug 2019
Certificates of CA (Form 3)File: FORM 3.pdf6 Aug 2019
Proforma of Allotment letterFile: LAABH ENCLAVE Phase 2.pdf12 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf31 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf31 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf31 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf31 Mar 2019
Certificates of CA (Form 3)File: FORM 3.pdf31 Mar 2019
Certificates of CA (Form 3)File: FORM 3.pdf31 Mar 2019
Certificates of CA (Form 5)File: FORM 5.pdf29 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf12 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf30 Sep 2018
Certificates of CA (Form 3)File: FORM 3.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf29 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf29 Jun 2018
Certificates of CA (Form 3)File: FORM 3.pdf29 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: vaishnavi CC.pdf9 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: vaishnavi CC.pdf31 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf31 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf31 Mar 2018
Certificates of CA (Form 3)File: FORM 3.pdf31 Mar 2018
Building plan approvalFile: IOD.pdf31 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 30 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAABH ENCLAVE- PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHIWANDI7,600+ in Thane

2 kmLAABH ENCLAVE- PHASE 2Completed 175Lapsed / revoked 63Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: VAISHNAVI HOUSING REALTY LLP

VAISHNAVI HOUSING REALTY LLP has 2 registrations on MahaRERA, including LAABH ENCLAVE- PHASE 2 and LAABH ENCLAVE PHASE 2 D WING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that LAABH ENCLAVE- PHASE 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if LAABH ENCLAVE- PHASE 2 is delayed beyond 31 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAABH ENCLAVE- PHASE 2?

The registered promoter entity is VAISHNAVI HOUSING REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAABH ENCLAVE- PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LAABH ENCLAVE- PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAABH ENCLAVE- PHASE 2?

The professionals named in the filing: Architect: MS AKRUTI CONSULTANT; Engineer: MS TECH LINE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAABH ENCLAVE- PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAABH ENCLAVE- PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAABH ENCLAVE- PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.