Completed No litigation declared Residential / Group Housing project

LA RIVERIA

By LAKHANI BUILDERS PVT LTD

RG-MH-11782 · RERA P52000001858 · Last updated on MahaRERA portal: 13 Apr 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
May 2019Possession promisedregistration recorded completed
29 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

LA RIVERIA is a Residential / Group Housing project by LAKHANI BUILDERS PVT LTD in Raigarh, Maharashtra, registered with MahaRERA as P52000001858 on 29 Jul 2017. The registration is recorded completed; possession was promised by 31 May 2019.

At a glance

Project

  • NameLA RIVERIA
  • TypeResidential / Group Housing
  • Location
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000001858
  • ReraGenie IDRG-MH-11782

Builder

  • NameLAKHANI BUILDERS PVT LTD
  • Entity typeCompany
  • Managing DirectorVISHANDAS SATRAMDAS LAKHANI
  • Other registrations10 more →
  • Completed4 of 11
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

this monthRegisteredJul 2017PromisedMay 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion31 May 2019
  • Revised completionNone
  • Buildings4 building records
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LA RIVERIA A WINGNA140000
LA RIVERIA B WINGNA140000
LA RIVERIA A WING 12 13 PROPOSEDNA20000
LA RIVERIA B WING 12 13 PROPOSEDNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 13 Apr 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.

LA RIVERIA A WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LA RIVERIA B WING78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
LA RIVERIA A WING 12 13 PROPOSED95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
LA RIVERIA B WING 12 13 PROPOSED50%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 13 Apr 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes80%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
SWIMMING POOLYes50%
GYMNASIUMYes100%

Parking filed153

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots153
Closed/Covered89
Open Space64
BuildingClosed/CoveredOpen SpaceTotal
LA RIVERIA A WING463076
LA RIVERIA B WING433477

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,254 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
KUMAR HOUSING CORPORATION LIMITEDPune (M Corp.)Pune

Approvals and building plan

Permissible FSI8027.84
Proposed, not sanctioned6,717 sq m
Buildings approved4
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVARDHAMAN CHAMBERS CO OPERATIVE SOCIETY, PLOT NO 84, SEC 17, VASHI, NAVI MUMBAI, 400705

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectO7 ARCHITECTS AND PLANNERS
EngineerMAHIMTURA CONSULTANTS PVT LTD
PartnerRole in project
LAKHANI BUILDERS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 4)File: Architect certificate - Form 4-491 b wing Panvel.pdf13 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf27 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Project Engineer Cerificate.pdf27 Sep 2019
Certificates of CA (Form 5)File: CA Certificate.pdf27 Sep 2019
Certificates of Architect (Form 4)File: FORM 4.pdf20 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf29 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Project Engineer Certificate.pdf29 Apr 2019
Certificates of CA (Form 3)File: CA Certificate.pdf29 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: Panvel Amended CC.pdf23 Feb 2019
Certificates of CA (Form 3)File: CA Certificate.pdf23 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf1 Feb 2019
Certificates of CA (Form 5)File: La-Riveria - Form 5.pdf13 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf5 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Project Engineer Cerificate.pdf5 Nov 2018
Certificates of CA (Form 3)File: CA Certificate.pdf5 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf21 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Project Engineer Cerificate.pdf21 Jul 2018
Certificates of CA (Form 3)File: CA Certificate.pdf21 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf27 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Project Engineer Cerificate.pdf27 Apr 2018
Certificates of CA (Form 3)File: CA Certificate.pdf27 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf9 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf9 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Project Engineer Cerificate.pdf9 Feb 2018
Certificates of CA (Form 3)File: CA Certificate.pdf9 Feb 2018
Certificates of CA (Form 3)File: CA Certificate.pdf9 Feb 2018
Building plan approvalFile: MYSCAN_20170921_0006.pdf26 Oct 2017
Building plan approvalFile: MYSCAN_20170921_0007.pdf26 Oct 2017
Building plan approvalFile: MYSCAN_20170921_0008.pdf26 Oct 2017
Building plan approvalFile: MYSCAN_20170921_0009.pdf26 Oct 2017
Building plan approvalFile: MYSCAN_20170921_0010.pdf26 Oct 2017
Building plan approvalFile: MYSCAN_20170921_0011.pdf26 Oct 2017
Building Plan Approval (IOD)File: MYSCAN_20170921_0006.pdf26 Oct 2017
Building Plan Approval (IOD)File: MYSCAN_20170921_0007.pdf26 Oct 2017
Building Plan Approval (IOD)File: MYSCAN_20170921_0008.pdf26 Oct 2017
Building Plan Approval (IOD)File: MYSCAN_20170921_0009.pdf26 Oct 2017
Building Plan Approval (IOD)File: MYSCAN_20170921_0010.pdf26 Oct 2017
Building Plan Approval (IOD)File: MYSCAN_20170921_0011.pdf26 Oct 2017
Commencement Certificates / NA Order for plotted developmentFile: Panvel Amended CC.pdf26 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf26 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Project Engineer Cerificate - PANVEL.pdf26 Oct 2017
Certificates of CA (Form 3)File: CA CERTIFICATE - PANVEL.pdf26 Oct 2017
Certificates of CA (Form 3)File: CA Certificate.pdf25 Jul 2017
OtherFile: Proposed Plan - 13th Floor.pdf25 Jul 2017
OtherFile: Proposed Section.pdf25 Jul 2017
OtherFile: Proposed plan.pdf25 Jul 2017
Building plan approvalFile: SHEET 1.pdf23 Jul 2017
Building plan approvalFile: SHEET 2.pdf23 Jul 2017
Building plan approvalFile: SHEET 3.pdf23 Jul 2017
Building plan approvalFile: SHEET 4.pdf23 Jul 2017
Building plan approvalFile: SHEET 5.pdf23 Jul 2017
Layout approvalFile: SHEET 1.pdf23 Jul 2017
PAN CardFile: LBPL Pan Card.pdf23 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf23 Jul 2017
Details of encumbrancesFile: Index 2.pdf23 Jul 2017
Copy of Layout Approval (in case of layout)File: SHEET 1.pdf23 Jul 2017
Building Plan Approval (IOD)File: SHEET 1.pdf23 Jul 2017
Building Plan Approval (IOD)File: SHEET 2.pdf23 Jul 2017
Building Plan Approval (IOD)File: SHEET 3.pdf23 Jul 2017
Building Plan Approval (IOD)File: SHEET 4.pdf23 Jul 2017
Building Plan Approval (IOD)File: SHEET 5.pdf23 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Panvel CC - 10 Floors.pdf23 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Panvel CC - 11th Floors.pdf23 Jul 2017
Declaration in FORM BFile: FORM B.pdf23 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PANVEL - ARCHITECT CERTIFICATE.pdf23 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Project Engineer Certificate.pdf23 Jul 2017
Proforma of Allotment letterFile: SALE AGREEMENT.pdf23 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
LAKHANI WHITE CASTLEPLOT NO 31 SEC 18 ULWE NAVI MUMBAI71CompletedFeb 2015Late, Feb 2015
LAKHANI BLUE WAVESPLOT NO 161 SEC 09 ULWE NAVI MUMBAI54CompletedJan 2014Late, Jan 2014

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LA RIVERIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmLA RIVERIACompleted 238Lapsed / revoked 66Other 138Dot size: filed unitsN

Filed coordinates, straight-line distance. 442 registered projects within 2 km.

Builder: LAKHANI BUILDERS PVT LTD

LAKHANI BUILDERS PVT LTD has 11 registrations on MahaRERA, including SIGNATURE and LA RIVERIA. Its filings disclose 10 earlier MahaRERA projects: declares 4 of 10 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if LA RIVERIA is delayed beyond 31 May 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LA RIVERIA?

The registered promoter entity is LAKHANI BUILDERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LA RIVERIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LA RIVERIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LA RIVERIA?

The professionals named in the filing: Architect: O7 ARCHITECTS AND PLANNERS; Engineer: MAHIMTURA CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LA RIVERIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LA RIVERIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LA RIVERIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.