Home / Browse projects / Pune, Maharashtra / La Montana Phase III

Completed No litigation declared Residential / Group Housing project

La Montana Phase III

By Tata Value Homes Limited

RG-MH-08192 · RERA P52100000145 · Last updated on MahaRERA portal: 20 Jul 2021

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2021Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

La Montana Phase III is a Residential / Group Housing project by Tata Value Homes Limited in Pune, Maharashtra, registered with MahaRERA as P52100000145 on 5 Jul 2017. The registration is recorded completed; possession was promised by 30 Mar 2021. The completion date has moved by 18 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLa Montana Phase III
  • TypeResidential / Group Housing
  • Location
    • Mumbai - Pune Highway
    • MIDC Gate Chowk
    • Near Sheetal Hotel
    • Talegaon
    • Wadagaon (CT)
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000145
  • ReraGenie IDRG-MH-08192

Builder

  • NameTata Value Homes Limited
  • Entity typeCompany
  • CINU45400MH2009PLC195605
  • GSTIN27AANCS3558H1ZW
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSanjay Bhupender Dutt, NIPUN AGARWAL
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredJul 2017First promiseSep 2019Revised toMar 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Jul 2017
  • Promised completion30 Mar 2021
  • Revised completionRevised to 30 Mar 2021 (originally 30 Sep 2019)
  • Buildings1 building record
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
La Montana SierraNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

La Montana Sierra: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed100

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots100
Closed/Covered20
Open Space80

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,780 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4653.44
Proposed, not sanctioned4,653 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIDBI Bank LTD, Namrata Commercial Complex, Plot No 23, Talegaon, Dabhade, Talegaon Chakan Road, Surv

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK a architecture
EngineerUniversal Consultants & Valuers LLP
Chartered AccountantOmprakash Kedia & Co
Chartered AccountantSAJJAN KANODIA & Co
Chartered AccountantT P Ostwal & Associates LLP
PartnerRole in project
Tata Value Homes Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100002469Sep 2019 → Sep 2020

Reason as filed by the promoterWe are developing the project 'La Montana - Phase III' and have received the Occupancy Certificate dated on 24 June 2019. The promoter is in process of handing over the residential units under this Phase to the customers and to complete the formation of the society. Therefore, we have applied for an extension.

Litigation declared4

CaseCourtStatus
151/2015/2015Sub Divisional Officer MavalTVHL had received a Notice from the Tehsildar Pune for payment of royalty towards excavation of Rs O
190/2016/2016Sub Divisional Officer MavalThe adjacent land owner Mr Sitaram Dhore wants a right of access through TVHL project property Mr Si
-----/2014Before the Ld Sole Arbitrator Mr Shailesh Shah Sr AdvThe matter is kept for inspection of the documents and exchange of draft issues by both the parties
WPST/36660/2018/2018High Court BombayPRE ADMISSION DATE NOT YET ASSIGNED

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000010542Ramesh M. TavhareTata Value Homes Ltd.09/11/2017

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jun 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Oct 2020

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: OC LM PH3 24-6-2019.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Q3 Form 2A LM QA cert 31122019.pdf21 May 2021
Disclosure of sold/ booked inventoryFile: LM Phase III units Sold unsold Apr 2021.pdf21 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 LM Ph III 2019-20.pdf21 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 13 FORM 5 Annual CA cert 2018-19.pdf21 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: LA Montana RERA Form 5 FY-19-20.pdf21 Oct 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC LM PH3 24-6-2019.pdf15 Oct 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: LM3-Society Regn Certificate 30-09-2020.pdf30 Sep 2020
Certificates of CA (Form 3)File: Lamontana Q4_CA CertificateMar-20.pdf26 Sep 2020
Architect’s Certificate on Completion of Project (Form 4)File: Arch Form4 -LM T6.pdf25 Sep 2020
OtherFile: OC LM PH3 24-6-2019.pdf25 Sep 2020
Certificates of CA (Form 3)File: LA Montana Ph III-Upto Dec-1-19.pdf15 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Qty Surveyor Certificate- La Montana.pdf10 Jan 2020
Form 2AFile: Maha RERA Quality Certificate Dec 2019.pdf10 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: La Montana - Architect Certificate - 30062019.pdf11 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Cert Jun19.pdf8 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Cert Sep 19.pdf8 Nov 2019
Form 2AFile: Form 2A Quality Engineers Certificate.pdf8 Nov 2019
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 La Montana.pdf8 Nov 2019
Certificates of CA (Form 3)File: 09-LA Montana PH III-CA Certificate - Sep-19-4.pdf6 Nov 2019
Certificates of CA (Form 3)File: CA Certificate-RERA La Montana-T-6-1.pdf6 Nov 2019
Certificates of CA (Form 5)File: La Montana Ph III - Form 5.pdf29 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate RERA March 2019- Less than 1MB.pdf30 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cost Certificate Lamontana-March-19.pdf30 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Cost Certificate.pdf30 Jul 2019
Form 2AFile: Quality Certificate March 19.pdf30 Jul 2019
Form 2AFile: Maha RERA Quality Certificate Jun 2019.pdf30 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 180830 -RERA Certificate Architect Certificate.pdf10 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate-AUG-18 - Lamontana.pdf10 Apr 2019
Certificates of CA (Form 3)File: 05-La Montana CA Certificate.pdf10 Apr 2019
Form 2AFile: quality assurance to upload.pdf28 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: La Montana Architect Certificate NOV 30 FINAL.pdf16 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: La Montana Engineer CERTIFICATE till 30th Nov.pdf16 Jan 2019
Certificates of CA (Form 3)File: La Montana CA Certificate till Nov 30.pdf16 Jan 2019
Certificates of CA (Form 5)File: TVHL La Montana RERA certificate.pdf26 Sep 2018
Certificates of CA (Form 3)File: CA Certifiacate.pdf22 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Jun 2018-compressed.pdf19 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate Jun 2018 (2).pdf19 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certficate Mar 2018.pdf21 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certficate Mar 2018.pdf21 Mar 2018
Certificates of CA (Form 3)File: CA Certficate Mar 2018.pdf21 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2nd Qtr Architect Certificate less than 1mb.pdf20 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2nd Qtr Engineer Certificate less than 1mb.pdf20 Dec 2017
Certificates of CA (Form 3)File: 2nd Withdrawal CA Certificate_30092017_LA Montana.pdf20 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf28 Sep 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cerificate.pdf28 Sep 2017
Certificates of CA (Form 3)File: LA Montana project - CA certificate.pdf28 Sep 2017
OtherFile: Environment Clearance.pdf28 Sep 2017
Layout approvalFile: imgw-628173723 copy.pdf30 Jun 2017
Layout approvalFile: imgw-628173604 copy.pdf30 Jun 2017
Building plan approvalFile: imgw-628173604 copy.pdf30 Jun 2017
PAN CardFile: TVHL_PAN Card.pdf30 Jun 2017
Copy of the legal title reportFile: Final Title Certificate.pdf30 Jun 2017
Details of encumbrancesFile: Encumbrances Letter.pdf30 Jun 2017
Copy of Layout Approval (in case of layout)File: imgw-628173723 copy.pdf30 Jun 2017
Copy of Layout Approval (in case of layout)File: imgw-628173604 copy.pdf30 Jun 2017
Building Plan Approval (IOD)File: imgw-628173604 copy.pdf30 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICAE - PH 3.pdf30 Jun 2017
Declaration in FORM BFile: Form B La Montana.pdf30 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Jun 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Jun 2017
Certificates of CA (Form 3)File: CA Certificate La Montana.pdf30 Jun 2017
Proforma of Allotment letterFile: LA MONTANA PH III AFS and Allotment Letter.pdf30 Jun 2017

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Santorini-PH 1 ClusterC,D,K,L,R and S/S1S.No. 452 Padur Road Opp to Samathuvapuram Kuthambakkam Village Poonamallee Taluk Tiruvallur District 600124400CompletedNov 2016Late, Jun 2017
La Montana Phase 2 C4,C5,C6,C7Opposite Talegaon MIDC Junction Old Mumbai Pune Highway Vadgaon Dist Pune Pin 412106188CompletedMar 2016Late, Aug 2016
Shubh Griha Vasind Sector D EOpposite HP Petrol Pump Near Shetron Factory and Hotel Dhingra Adjacent Plot to Mumbai Nasik Highway Khativali Tal Shahapur Dist Thane Pin 421604336CompletedMar 2014Late, Mar 2015
Shubh Griha Vasind C 3-6Opposite HP Petrol Pump Near Shetron Factory and Hotel Dhingra Adjacent Plot to Mumbai Nasik Highway Khativali Tal Shahapur Dist Thane Pin 421604102CompletedSep 2013Late, Mar 2015
Shubh Griha Vasind A 1 to 13, B 1 to 8, C 1,2, C3 to 10 unitsOpposite HP Petrol Pump Near Shetron Factory and Hotel Dhingra Adjacent Plot to Mumbai Nasik Highway Khativali Tal Shahapur Dist Thane Pin 421604910CompletedSep 2013Late, Mar 2014
La Montana -C1, C2, C3Opposite Talegaon MIDC Junction Old Mumbai Pune Highway Vadgaon Dist Pune Pin 412106155CompletedJul 2013Late, May 2016
La Montana - B1, B2, B3, D1, D2Opposite Talegaon MIDC Junction Old Mumbai Pune Highway Vadgaon Dist Pune Pin 412106223CompletedJul 2013Late, Dec 2015
La Montana - A1, A2, A3, A4, EOpposite Talegaon MIDC Junction Old Mumbai Pune Highway Vadgaon Dist Pune Pin 412106203CompletedJul 2013Late, Sep 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep La Montana Phase III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIDC Gate Chowk , Near Sheetal Hotel, Talegaon,13,700+ in Pune

2 kmLa Montana Phase IIICompleted 25Lapsed / revoked 22Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 71 registered projects within 2 km.

Builder: Tata Value Homes Limited

Tata Value Homes Limited has 2 registrations on MahaRERA, including La Montana Phase III and La Montana Phase IV. Its filings disclose 8 earlier MahaRERA projects: declares 0 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if La Montana Phase III is delayed beyond 30 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of La Montana Phase III?

The registered promoter entity is Tata Value Homes Limited, a company as per the filing. Its CIN U45400MH2009PLC195605 and GSTIN 27AANCS3558H1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in La Montana Phase III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against La Montana Phase III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for La Montana Phase III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at La Montana Phase III?

The professionals named in the filing: Architect: VK a architecture; Engineer: Universal Consultants & Valuers LLP; Chartered Accountant: Omprakash Kedia & Co; Chartered Accountant: SAJJAN KANODIA & Co; Chartered Accountant: T P Ostwal & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in La Montana Phase III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About La Montana Phase III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save La Montana Phase III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.