Home / Browse projects / Pune, Maharashtra / La commercia 4-9
La commercia 4-9
By AUM HOUSING
RG-MH-52551 · RERA P52100045459 · Last updated on MahaRERA portal: 1 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 24 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
La commercia 4-9 is a Commercial project by AUM HOUSING in Pune, Maharashtra, registered with MahaRERA as P52100045459 on 18 May 2022. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 24 months from the original filing. 22 of the 81 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameLa commercia 4-9
- TypeCommercial
- Location
- baner mahlunge road
- baner
- Haveli
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045459
- ReraGenie IDRG-MH-52551
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 May 2022
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 31 Mar 2024)
- Buildings1 building record
- Documents filed104 files
Current status
Figures as on 1 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LA COMMERCIA | NA | 12 | 12 | 0 | 81 | 81 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
LA COMMERCIA: 55% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 1 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| LA COMMERCIA | NA | Rs 28.10 cr | Rs 22.38 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mangesh Bhandekar |
| Engineer | Kalpesh Zabak |
| Chartered Accountant | Priyanka Chordiya |
| Chartered Accountant | SAC & CO LLP |
| Partner | Role in project |
|---|---|
| AUM HOUSING | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterwe are nearing the completion stage. Some finishing work going on. There is much more time required get completion certificate. We will complete the project much before the 30.03.2025. Just for the convenience we are taking the extension of one year.
Reason as filed by the promoterConstruction of the project is almost completed. The actual site photos as on the date is attached for your reference. Due to combined offices into single office for two floors for which need to revised sanction plan. We are actively coordinating with the concerned departments to get the revised plan sanction expedite the necessary approvals and complete the formalities. for getting the approval from the concerned department (NOC) time required which is almost 2-3 months.
Reason as filed by the promoterDue to delays in receiving certain mandatory government approvals, including but not limited to [mention specific approvals if known, e.g., environmental clearance, building plan approval, etc.], the progress of the project has been impacted. These approvals are beyond our control, and we have been actively following up with the respective departments to expedite the process. In light of the above, we kindly request an extension of the project registration under RERA to accommodate the delay caused by these pending approvals. We are committed to ensuring compliance with all applicable laws and
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504609 | Tushar Patil | AUM HOUSING | 24/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A La Commercia 4-9 2025-2026.pdf | 1 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 sign.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 La commercia 4-9 sign.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Form 3-La Commercia 4-9 31122025 sign_compressed.pdf | 30 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 la commercia 4-9 as on 30092025.pdf | 29 Jan 2026 |
| Withdrawal Update Form 2File: AUM HOUSING 4-9 FORM-2.pdf | 29 Jan 2026 |
| Withdrawal Update Form 3File: Form 3-La Commercia 4-9 30092025_final.pdf | 29 Jan 2026 |
| Form 2A (FY 2024-2025)File: La Commercia 4-9_FORM 2A_2024-25.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: La commercia 4-9 31-03-2025_sign copy_compressed.pdf | 30 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1 la commercia 4-9 as on 30062025.pdf | 25 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2 - La Commercia 4-9 30062025-SCAN.pdf | 25 Sep 2025 |
| Withdrawal Update Form 3File: Form 3-La Commercia 4-9 30062025 Sign_compressed.pdf | 25 Sep 2025 |
| Form 1File: FORM 1 la commercia 4-9 as on 30062025.pdf | 6 Aug 2025 |
| Form 2File: FORM 2 - La Commercia 4-9 30062025-SCAN.pdf | 6 Aug 2025 |
| Form 3File: Form 3-La Commercia 4-9 30062025 Sign_compressed.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory 30062025 la commercia 4 9 SCAN.pdf | 6 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ANTARIKSH TOWER 22 32 as on 31032025.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 la commercia 4 9 as on 31032025.pdf | 12 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 La Commercia 4 9 31032025 sing_compressed.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANTARIKSH 22 32 FORM 2.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 La Commercia 4 to 9 31032025 sign.pdf | 12 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold 31032025 2 sign.pdf | 12 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 31032025 la commercia 4 9 sign.pdf | 12 Apr 2025 |
| Declaration in FORM BFile: Form B 4-9.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_La Commercia 4_9_05012025_additional incurred cost include.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 La Commercia 4_9_ 31122024.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 La commercia 4_9_31122024 _compress.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 La Commercia 4_9.pdf | 15 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold La Commercia 4_9 sign.pdf | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 la commercia 4_9 as on 30092024.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_La Commercia 4_9 30092024_sign_compres.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAHA RERA FORM 2 _ La Commercia 4_9 30092024.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 30092024 la commercia 4_9.pdf | 16 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 La commercia 4_9 31032024_compress.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 La Commercia 4-9_30-06-2024.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 La commercia 4-9 30-06-2024.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of old Unsold Inventory La Commercia 4-9.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 La commercia 4-9 30-06-2024_compressed.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 LA COMMERCIA 4 TO 9 310324.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 La Commercia 4 to 9 31032024_compressed.pdf | 30 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a la commercia 4-9.pdf | 30 May 2024 |
| Disclosure of sold/ booked inventoryFile: LA COMMERCIA 4 TO 9 Sold Unsold Inventory31032024.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 La Commercia 4 to 9 31032024_compressed.pdf | 30 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A SEPARATE ACCOUNT.pdf | 29 May 2024 |
| Declaration in FORM BFile: form b la commercia 4 to 9 for extension.pdf | 19 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 LA COMMERCIA 4 TO 9 31120223.pdf | 11 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 La commercia 4 to 9 31122023 both signed_compressed.pdf | 8 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 la commercia 4 to 9 31122023.pdf | 7 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a la commercia 4 to 9 fy 22 23.pdf | 7 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 la commercia 4 to9 as on 30062023.pdf | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 la commercia 4 to9 as on 30092023.pdf | 2 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure sold unsold signed.pdf | 2 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 La Commercia 4-9_compressed.pdf | 1 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: La commercia 4 9 disclosure sold unsold.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 la commercia 4 9 300922023 both sign.pdf | 1 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 _La Commercia 4-9_FY 22_23_compressed.pdf | 31 Oct 2023 |
| Proforma of Agreement for saleFile: 2 Proforma of Agreement for sale.pdf | 25 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf | 24 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf | 24 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: La commercia 4 TO 9_sold unsold_30032023.pdf | 24 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisations - Sharad Narayan Mogale.pdf | 24 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real estate organisations-Ajit Zumbarlal Karnawat.pdf | 24 Aug 2023 |
| Proforma of Allotment letterFile: Draft Allotment Letter_reduce.pdf | 24 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A seperate Bank Account.pdf | 24 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf | 24 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf | 24 Aug 2023 |
| Layout approvalFile: 1-21_Red.pdf | 17 Aug 2023 |
| Building plan approvalFile: sheet-15-11 floor.pdf | 17 Aug 2023 |
| Building plan approvalFile: sheet-16 -12 floor.pdf | 17 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: 1-21_Red.pdf | 17 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: sheet-15-11 floor.pdf | 17 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: sheet-16 -12 floor.pdf | 17 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 30062023 la commercia 4-9 Revised.pdf | 17 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 LA COMMERCIA 4_9 _30032023.pdf | 16 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 La Commercia 4 TO 9 30062023.pdf | 16 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 30062023 la commercia 4 TO 9 sign.pdf | 16 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 La commercia 4_9 30032023 Both sign_Reduce.pdf | 16 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: La Commercia 4_9 Form 3 30062023_both sign_Reduce.pdf | 16 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 La Commercia 4-9 30062022 - sign.pdf | 16 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 La Commercia 4-9 30092022 - sign_Red.pdf | 16 Jun 2023 |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| THE MINT | BANER | 19 | Completed | Dec 2016 | Dec 2016 |
| QUADRA | BANER | 4 | Completed | Dec 2016 | Dec 2016 |
| ASHIYANA | SHIVAJI NAGAR | 58 | Completed | Dec 2016 | Dec 2016 |
| KESHAV SHRUSHTI | RATNAGIRI | 73 | Completed | Dec 2015 | Dec 2015 |
| CASA IMPERIA | WAKAD | 397 | Completed | Dec 2015 | Dec 2015 |
| SRA PROJECT | BHAWANI PETH | 428 | Completed | Dec 2012 | Dec 2012 |
| COSMOS REGENCY | 83 AND 84 BANER | 172 | Completed | Dec 2012 | Dec 2012 |
| CASA POLI | WAKAD | 112 | Completed | Dec 2011 | Dec 2011 |
| LA VALE CASA | SNO.20 BAVDHAN | 120 | Completed | Dec 2008 | Late, Jan 2009 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep La commercia 4-9 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near baner13,700+ in Pune
Filed coordinates, straight-line distance. 433 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: AUM HOUSING
AUM HOUSING has 2 registrations on MahaRERA, including La Commercia and La commercia 4-9. Its filings disclose 9 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that La commercia 4-9 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if La commercia 4-9 is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of La commercia 4-9?
The registered promoter entity is AUM HOUSING, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in La commercia 4-9?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against La commercia 4-9?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for La commercia 4-9?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at La commercia 4-9?
The professionals named in the filing: Architect: Mangesh Bhandekar; Engineer: Kalpesh Zabak; Chartered Accountant: Priyanka Chordiya; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in La commercia 4-9?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback