Home / Browse projects / Thane, Maharashtra / L AND T SEAWOODS RESIDENCES PHASE I

Completed Litigation declared Others project

L AND T SEAWOODS RESIDENCES PHASE I

By L&T SEAWOODS LIMITED

RG-MH-34320 · RERA P51700020275 · Last updated on MahaRERA portal: 17 Dec 2023

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 6 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
45 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
6Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

L AND T SEAWOODS RESIDENCES PHASE I is a Others project by L&T SEAWOODS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700020275 on 2 Apr 2019. The registration is recorded completed; possession was promised by 30 Dec 2024. 6 complaints are on record with the regulator.

At a glance

Project

  • NameL AND T SEAWOODS RESIDENCES PHASE I
  • TypeOthers
  • Location
    • NAVI MUMBAI
    • L&T SEAWOODS
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700020275
  • ReraGenie IDRG-MH-34320

Builder

  • NameL&T SEAWOODS LIMITED
  • Entity typeCompany
  • CINU45203MH2008PLC180029
  • DirectorsRamamurthi Shankar Raman, Shrikant Joshi
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2019PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Apr 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings5 building records
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER D04NA170000
TOWER D05NA170000
TOWER D06NA170000
TOWER D07NA170000
TOWER D08NA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 17 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

45 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

TOWER D0482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER D0582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER D0682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER D0782%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER D0882%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities30

As on 17 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Swimming Pool and Kids PoolNoNot applicable
Sauna SteamNoNot applicable
Recreational spaceNoNot applicable
Multi games courtNoNot applicable
Mini TheatreNoNot applicable
Lounge AreaNoNot applicable
Landscape gardenNoNot applicable
JacuzziNoNot applicable
Gymnasium and YogaNoNot applicable
Games roomNoNot applicable
AmphitheatreNoNot applicable
Badminton CourtNoNot applicable
Barbeque areaNoNot applicable
Children play equipmentsNoNot applicable
Community HallNoNot applicable

Parking filed763

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots763
Closed/Covered763
BuildingClosed/CoveredTotal
TOWER D04150150
TOWER D05152152
TOWER D06145145
TOWER D07143143
TOWER D08173173

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNMMC
Permissible FSI31653.5
Proposed, not sanctioned31,654 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMITTAL COURT, NARIMAN POINT

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHiten Sethi & Associates
ArchitectHiten Sethi
EngineerHM Raje
EngineerINTENTO ASSOCIATES
Chartered AccountantM P Chitale & Co
Chartered AccountantUrmit Shah & CO
PartnerRole in project
L&T SEAWOODS LIMITED-

Litigation declared2

CaseCourtStatus
110/2021HIGH COURTThe Petition is not admitted till date
110/2021High CourtOngoing

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000197238Pradeep Koteshwar ReyyaM and T Seawoods Limited11/06/2021
CC006000000333829L&T Seawoods Ltd.Tarvinder Singh Dhaliwal01/04/2023
CC006000000344223Shailaja GodghateL and T Seawoods Limited04/02/2023
CC006000000540735L&T Seawoods LimitedMr. Mohammed Kadim Abdul Kalam17/06/2024
CC12502145Anjani Sudeshwar KumarL&T SEAWOODS LIMITED29/06/2025
CC12504188Sreelesh ShanmughamL&T SEAWOODS LIMITED26/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Oct 2023

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: fORM 4_D4-D8.pdf17 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4_D7 to 8.pdf23 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4_D4 to D6.pdf23 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: P51700020275-Phase 1.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold, Unsold-LTSW-D04-D08-.pdf10 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1_FY23-24_D4_D8.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1-23-24 - Form 2 - D4-D8-.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Q1_23-24 Form2A D4-D8.pdf20 Jul 2023
Certificates of CA (Form 3)File: Form 3 with Table C_D4-D8_Q1_FY 23-24.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_D4_D8.pdf14 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - D1-D3.pdf14 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Q-4_22-23 RERA D-04 to D-08.pdf14 May 2023
Disclosure of sold/ booked inventoryFile: Seawood Tower D04.pdf14 May 2023
Certificates of CA (Form 3)File: Form 3_D4-D8.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: LTSW-D4 to D8_1_compressed.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: LTSW-D4 to D8_2_compressed.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_D4to D8_dec22.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D4-D8 Form 2A_Q3.pdf19 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: D4-D8 Form 2A_Q3.pdf19 Jan 2023
Certificates of CA (Form 3)File: Form 3 with Table C_Q3_FY 22-23_D4-D8.pdf19 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: LNT seawoods CC_2022_c.pdf30 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 _SW_D4_D8_Q2.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2_ Q2-22-23_D4-D8.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: Sep22_Sold_D4_D8_P1.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: Sep22_Sold_D4_D8_P2.pdf19 Oct 2022
Certificates of CA (Form 3)File: Form 3_D4-D8_Q2_22_c.pdf19 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: LTSW_D4-D8.pdf7 Oct 2022
Certificates of CA (Form 3)File: CA Certificate.pdf6 Oct 2022
Proforma of Allotment letterFile: Allotletter_Phase I_D4_010822.pdf6 Aug 2022
Proforma of Allotment letterFile: Allotletter_Phase I_D5_D6_010822.pdf6 Aug 2022
Proforma of Allotment letterFile: AllotLetter_D7_D8_010822.pdf6 Aug 2022
Disclosure of sold/ booked inventoryFile: SOLD_unsoldT D4 to D8.pdf20 Jul 2022
Certificates of CA (Form 3)File: Form3_D4-D8_Q1_jun22_c.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D4 to D8_Form 1_Architect_jun22c.pdf18 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D4-D8_Form 2_jun22.pdf18 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: D4-D8 Form 2A_ Q122.pdf18 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Phase 1.pdf27 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Phase 1.pdf27 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _ Phase 1.pdf27 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Phase 1.pdf27 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Phase 1.pdf27 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Phase 1_.pdf27 May 2022
Disclosure of sold/ booked inventoryFile: LTSW_Phase 1_compressed_.pdf27 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: LTSW_Phase 1_Form 2A.pdf16 Feb 2022
CERSAI detailsFile: CERSAI_Seawoods Residence_Phase I.pdf16 Feb 2022
Disclosure of sold/ booked inventoryFile: P51700020275-LTSW-D4-8.pdf2 Feb 2022
Declaration about Commencement CertificateFile: Format D_D4 to D8.pdf22 Dec 2021
Disclosure of sold/ booked inventoryFile: Disclosure_D4-D8.pdf22 Dec 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: LTSW_D4-8.pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Mar'2021 Seawoods D4-D8.pdf30 Sep 2021
Certificates of CA (Form 3)File: LTSW_Form 3_D4-D8.pdf24 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf13 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf13 Jun 2021
Certificates of CA (Form 3)File: Form 3.pdf13 Jun 2021
Certificates of CA (Form 3)File: Form 3.pdf19 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1 Architect Cer_Q3_OCT_DEC 2020.pdf14 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf14 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf14 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf14 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Nov 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Nov 2020
Certificates of CA (Form 3)File: Form 3.pdf17 Nov 2020
Certificates of CA (Form 3)File: Form 3.pdf17 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Mar 2020.pdf17 Nov 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Aug 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf14 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf14 Aug 2020
Certificates of CA (Form 3)File: FORM 3.pdf14 Aug 2020
Details of Restarting of Construction work post lockdownFile: LTSW.pdf22 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_LTSW_Dec 2019.pdf18 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_.pdf9 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2- Tower 4,5,6,7,8_.pdf9 Feb 2020
Certificates of CA (Form 3)File: Form 3 Dec 19 Seawoods.pdf9 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 19_.pdf10 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 19_.pdf10 Nov 2019

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsStatusPromisedDelivered
testTest-OngoingSep 2024Not delivered
L AND T SEAWOODS RESIDENCES - NORTH TOWERSR 1 Sector 40 Nerul Navi Mumbai Maharashtra 400706241CompletedJun 2024Feb 2024
L AND T SEAWOODS RESIDENCES PHASE IR 1 Sector 40 Nerul Navi Mumbai Maharashtra 400706507CompletedDec 2023Jun 2023
Seawoods Grand Central Integrated developmentR 1 Sector 40 Nerul Navi Mumbai Maharashtra 400706732CompletedSep 2016Sep 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep L AND T SEAWOODS RESIDENCES PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near L&T SEAWOODS7,600+ in Thane

2 kmL AND T SEAWOODS RESIDENCompleted 47Lapsed / revoked 18Other 55Dot size: filed unitsN

Filed coordinates, straight-line distance. 120 registered projects within 2 km.

Builder: L&T SEAWOODS LIMITED

L&T SEAWOODS LIMITED has 2 registrations on MahaRERA, including L AND T SEAWOODS RESIDENCES PHASE I and L AND T SEAWOODS RESIDENCES - NORTH TOWERS. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if L AND T SEAWOODS RESIDENCES PHASE I is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of L AND T SEAWOODS RESIDENCES PHASE I?

The registered promoter entity is L&T SEAWOODS LIMITED, a company as per the filing. Its CIN U45203MH2008PLC180029 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in L AND T SEAWOODS RESIDENCES PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against L AND T SEAWOODS RESIDENCES PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for L AND T SEAWOODS RESIDENCES PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at L AND T SEAWOODS RESIDENCES PHASE I?

The professionals named in the filing: Architect: Hiten Sethi & Associates; Architect: Hiten Sethi; Engineer: HM Raje; Engineer: INTENTO ASSOCIATES; Chartered Accountant: M P Chitale & Co; Chartered Accountant: Urmit Shah & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in L AND T SEAWOODS RESIDENCES PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About L AND T SEAWOODS RESIDENCES PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save L AND T SEAWOODS RESIDENCES PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.