Home / Browse projects / Thane, Maharashtra / L AND T SEAWOODS RESIDENCES - NORTH TOWERS

Completed Litigation declared Residential / Group Housing project

L AND T SEAWOODS RESIDENCES - NORTH TOWERS

By L&T SEAWOODS LIMITED

RG-MH-28659 · RERA P51700026653 · Last updated on MahaRERA portal: 6 Feb 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 2 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
12 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
2Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

L AND T SEAWOODS RESIDENCES - NORTH TOWERS is a Residential / Group Housing project by L&T SEAWOODS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700026653 on 21 Oct 2020. The registration is recorded completed; possession was promised by 30 Dec 2024. 2 complaints are on record with the regulator.

At a glance

Project

  • NameL AND T SEAWOODS RESIDENCES - NORTH TOWERS
  • TypeResidential / Group Housing
  • Location
    • Navi Mumbai
    • L&T Seawoods
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700026653
  • ReraGenie IDRG-MH-28659

Builder

  • NameL&T SEAWOODS LIMITED
  • Entity typeCompany
  • CINU45203MH2008PLC180029
  • DirectorsShrikant Joshi, Ramamurthi Shankar Raman
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects4 →

Key dates

this monthRegisteredOct 2020PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Oct 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed83 files

Current status

63.9%Work done, per cost certificate

Figures as on 6 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER D01NA230000
TOWER D02NA230000
TOWER D03NA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

TOWER D0172%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
TOWER D0272%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
TOWER D0372%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities30

As on 6 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
AmphitheatreYes0%
Badminton CourtYes0%
Swimming Pool and Kids PoolYes0%
Sauna/ SteamYes0%
Recreational SpaceYes0%
Multi Games CourtYes0%
Barbeque areaYes0%
Mini TheatreYes0%
Lounge AreaYes0%
Landscape GardenYes0%
JacuzziYes0%
Gymnasium & YogaYes0%
Games RoomYes0%
Children's play equipmentYes0%
Community HallYes0%

Parking filed453

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots453
Closed/Covered453
BuildingClosed/CoveredTotal
TOWER D01141141
TOWER D02134134
TOWER D03178178

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,915 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI29274.0
Proposed, not sanctioned18,726 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMittal Court, Nariman Point
Estimated costRs 218.60 cr
Cost incurredRs 139.60 cr
Work done63.86%
BuildingWingEstimatedIncurred
-NARs 68.32 crRs 43.63 cr
TOWER D03NARs 56.12 crRs 35.84 cr
TOWER D02NARs 47.37 crRs 30.25 cr
TOWER D01NARs 46.78 crRs 29.87 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHiten Sethi & Associates
ArchitectHiten Sethi
EngineerHM Raje
EngineerINTENTO ASSOCIATES
Chartered AccountantM P Chitale & Co
Chartered AccountantUSV & Co
Chartered AccountantUrmit Shah & CO
PartnerRole in project
L&T SEAWOODS LIMITED-

Litigation declared2

CaseCourtStatus
110/2021HIGH COURTOngoing
110/2021High CourtOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000396531Mahesh Ambaji ThaleL and T Seawoods Ltd.03/07/2023
CC006000000540736L&T Seawoods LtdMr. Puthurath Anil Kumar17/06/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Feb 2024

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 with OC.PDF6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate_Q4_FY23-24_D123.pdf22 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold D.pdf22 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4- 23-24 - Form 2 - D1-D3.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Q4- 23-24 - Form 2A - D1 - D3.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _D1 to D3-signed.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I - Architect Certificate -Q3-FY 2023-24-D123.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3- 23-24 - Form 2 -D1D2D3F.pdf20 Feb 2024
Disclosure of sold/ booked inventoryFile: LTSW_D1 to D3.pdf20 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Q3_FY 23-24_D1-D3.pdf20 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_D1toD3.PDF20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate_Q2_FY23-24_D123.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: LTSW_North Towers_Sold unsold.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2_23-24 Form2 D1-D3.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Q2_23-24 Form2A D1-D3.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Q2_FY 23-24_D1-D3.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: P51700026653-North Towers.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: Sold, Unsold-LTSW-D01-D03-.pdf10 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1_FY23-24_D123.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1- 23-24 - Form 2 - D1-D3.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Q1_23-24 Form2A D1-D3.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_D1-D3_Q1_FY 23-24.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_D123.pdf14 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - D1-D3.pdf14 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Q-4_22-23 RERA D-01to D-03.pdf14 May 2023
Disclosure of sold/ booked inventoryFile: Seawood Tower D1-D3.pdf14 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_D1-D3.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: LTSW-D1 to D3_compressed.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_D1to D3_dec22.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D1-D3 Form 2_Q3.pdf19 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: D1-D3 Form 2A_Q3.pdf19 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Q3_FY 22-23_D1-D3.pdf19 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: LNT seawoods CC_2022_c.pdf30 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 _SWD1_d3_Q2.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- D1-D3_sep22.pdf19 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- D1-D3_sep22.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: Sep22_Sold_D1_D3.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3D1-D3_Q2_22_c.pdf19 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: LTSW_D1-D3.pdf7 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_D1-D3.pdf6 Oct 2022
Proforma of Allotment letterFile: AllotLetter_North Tower_010822.pdf6 Aug 2022
Disclosure of sold/ booked inventoryFile: sold_unsold_Sw D1 D3_c.pdf19 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_D1-d3_Q1_jun22_c.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D1 to D3_Form 1_Architect_jun22c.pdf18 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D1 toD3 Form 2_jun22.pdf18 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: D1-D3 Form 2A_ Q122.pdf18 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_North Towers.pdf27 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_North Towers.pdf27 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_North Towers.pdf27 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_North Towers.pdf27 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_North Towers.pdf27 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_North Towers_.pdf27 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_North Towers.pdf27 May 2022
Disclosure of sold/ booked inventoryFile: LTSW_The North Towers_compressed.pdf27 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: LTSW_D1-D3.pdf16 Feb 2022
CERSAI detailsFile: CERSAI_North Tower.pdf16 Feb 2022
Disclosure of sold/ booked inventoryFile: P51700026653-LTSW-D1-3.pdf2 Feb 2022
Declaration about Commencement CertificateFile: Format D_D1 to D3.pdf22 Dec 2021
Disclosure of sold/ booked inventoryFile: Disclosure_D1-D3.pdf22 Dec 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Seawoods Name reservation (D01-D03).pdf20 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Mar'2021 Seawoods_D1-D3.pdf30 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LTSW_Form 3_D1-D3.pdf24 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LTSW_Form 3_D1-D3.pdf24 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1 Architect Cer_Q3_OCT_DEC 2020.pdf3 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 - 20-21 - form 1 - D1-D3.pdf3 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf3 Jun 2021
Proforma of Allotment letterFile: AFS_LTSW_The North Tower.pdf10 Feb 2021
Layout approvalFile: LTSW_North Towes CC_.pdf10 Oct 2020
Building plan approvalFile: LTSW_North Towes CC_.pdf10 Oct 2020
PAN CardFile: PAN CARD LTSL.pdf10 Oct 2020
Copy of the legal title reportFile: Legal title report_LTSW North Towers.pdf10 Oct 2020
Details of encumbrancesFile: Legal title report_LTSW North Towers.pdf10 Oct 2020
Copy of Layout Approval (in case of layout)File: LTSW_North Towes CC_.pdf10 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: LTSW_North Towes CC_.pdf10 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: LTSW_North Towes CC_.pdf10 Oct 2020

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 not delivered by the promised date
ProjectLocationFlatsStatusPromisedDelivered
testTest-OngoingSep 2024Not delivered
L AND T SEAWOODS RESIDENCES - NORTH TOWERSR 1 Sector 40 Nerul Navi Mumbai Maharashtra 400706241CompletedJun 2024Feb 2024
L AND T SEAWOODS RESIDENCES PHASE IR 1 Sector 40 Nerul Navi Mumbai Maharashtra 400706507CompletedDec 2023Jun 2023
Seawoods Grand Central Integrated developmentR 1 Sector 40 Nerul Navi Mumbai Maharashtra 400706732CompletedSep 2016Sep 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep L AND T SEAWOODS RESIDENCES - NORTH TOWERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near L&T Seawoods7,600+ in Thane

2 kmL AND T SEAWOODS RESIDENCompleted 47Lapsed / revoked 18Other 55Dot size: filed unitsN

Filed coordinates, straight-line distance. 120 registered projects within 2 km.

Builder: L&T SEAWOODS LIMITED

L&T SEAWOODS LIMITED has 2 registrations on MahaRERA, including L AND T SEAWOODS RESIDENCES PHASE I and L AND T SEAWOODS RESIDENCES - NORTH TOWERS. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if L AND T SEAWOODS RESIDENCES - NORTH TOWERS is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of L AND T SEAWOODS RESIDENCES - NORTH TOWERS?

The registered promoter entity is L&T SEAWOODS LIMITED, a company as per the filing. Its CIN U45203MH2008PLC180029 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in L AND T SEAWOODS RESIDENCES - NORTH TOWERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against L AND T SEAWOODS RESIDENCES - NORTH TOWERS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for L AND T SEAWOODS RESIDENCES - NORTH TOWERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at L AND T SEAWOODS RESIDENCES - NORTH TOWERS?

The professionals named in the filing: Architect: Hiten Sethi & Associates; Architect: Hiten Sethi; Engineer: HM Raje; Engineer: INTENTO ASSOCIATES; Chartered Accountant: M P Chitale & Co; Chartered Accountant: USV & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in L AND T SEAWOODS RESIDENCES - NORTH TOWERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About L AND T SEAWOODS RESIDENCES - NORTH TOWERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save L AND T SEAWOODS RESIDENCES - NORTH TOWERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.