ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / L and T Realty Evara Heights T5

Registered Litigation declared Residential / Group Housing project

L and T Realty Evara Heights T5

By ELANTE PROPERTIES PRIVATE LIMITED

RG-MH-23225 · RERA P51700078362 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 20%
78 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 162 documents Report an error

L and T Realty Evara Heights T5 is a Residential / Group Housing project by ELANTE PROPERTIES PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700078362 on 6 Dec 2024. Possession is promised by 30 Apr 2030. 0 of the 78 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameL and T Realty Evara Heights T5
  • TypeResidential / Group Housing
  • Location
    • Chirag Nagar
    • Village Panchpakhadi
    • Thane (M Corp.)
    • Thane
    • 400606
  • Pincode400606
  • RERA no.P51700078362
  • ReraGenie IDRG-MH-23225

Builder

  • NameELANTE PROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorUma Charan Rath
  • Other registrations3 more →
  • Declared earlier projects9 →

Key dates

this monthRegisteredDec 2024PromisedApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Dec 2024
  • Promised completion30 Apr 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed162 files

Current status

0%0 of 78 units booked
7.7%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sale Building T5NA504078078

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 20%.

Sale Building T5: 11% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)20%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed234

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots234
Closed/Covered234

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area421 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Jagdale Infrastructure Private LimitedThane (M Corp.)Thane

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI25229.09
Proposed, not sanctioned25,229 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Ground Floor, A. M. Naik Tower, LandT Campus, Gate No. 3, JVLR, Powai, Mumbai.400072, Maharashtra
Estimated costRs 196.00 cr
Cost incurredRs 15.12 cr
Work done7.71%
BuildingWingEstimatedIncurred
Sale Building T5NARs 148.57 crRs 10.46 cr
-NARs 47.43 crRs 4.66 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Madhav Shikre Shikre
EngineerSwapnil Joshi
EngineerVenkatesh lyenger
Chartered AccountantUrmit Shah
Chartered AccountantSharp and Tannan
PartnerRole in project
ELANTE PROPERTIES PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
42/2019City Civil CourtPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed162

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 162 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 31032026_Thane Form 1_T5_ELANTE.pdf20 Apr 2026
Withdrawal Update Form 2File: RERA FORM-2-T5.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 with Table C_Q4_FY 25-26_T5.pdf20 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A-T5.pdf19 Apr 2026
Withdrawal Update Form 1File: Form 1 - T5_EH Q3 2526.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 - T5 EH Q3 2526.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 - T5 EH Q3 2526.pdf20 Jan 2026
Withdrawal Update Form 1File: Form-1-EH-T5.pdf17 Oct 2025
Withdrawal Update Form 2File: Form-2-EH-T5.pdf17 Oct 2025
Withdrawal Update Form 3File: Form-3-EH-T5.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: Form-2A-FY-2024-25-EH-T5.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form-5-T5 Evara Heights FY 24-25-Signed.pdf30 Sep 2025
Withdrawal Update Form 1File: Form-1-T5.pdf22 Jul 2025
Withdrawal Update Form 1File: Form-1-T5.pdf22 Jul 2025
Withdrawal Update Form 2File: Form-2-T5.pdf22 Jul 2025
Withdrawal Update Form 2File: Form-2-T5.pdf22 Jul 2025
Withdrawal Update Form 3File: Form-3-T5.pdf22 Jul 2025
Withdrawal Update Form 3File: Form-3-T5.pdf22 Jul 2025
Form 1File: Form-1-T5.pdf18 Jul 2025
Form 2File: Form-2-T5.pdf18 Jul 2025
Form 3File: Form-3-T5.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory-T5.pdf18 Jul 2025
Form 1File: Form-1-T5.pdf18 Jul 2025
Form 2File: Form-2-T5.pdf18 Jul 2025
Form 3File: Form-3-T5.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory-T5.pdf18 Jul 2025
Withdrawal Update Form 1File: Form-1-T5.pdf18 Jul 2025
Withdrawal Update Form 1File: Form-1-T5.pdf18 Jul 2025
Withdrawal Update Form 1File: Form-1-T5.pdf18 Jul 2025
Withdrawal Update Form 1File: Form-1-T5.pdf18 Jul 2025
Withdrawal Update Form 1File: Form-1-T5.pdf18 Jul 2025
Withdrawal Update Form 2File: Form-2-T5.pdf18 Jul 2025
Withdrawal Update Form 2File: Form-2-T5.pdf18 Jul 2025
Withdrawal Update Form 2File: Form-2-T5.pdf18 Jul 2025
Withdrawal Update Form 2File: Form-2-T5.pdf18 Jul 2025
Withdrawal Update Form 2File: Form-2-T5.pdf18 Jul 2025
Withdrawal Update Form 3File: Form-3-T5.pdf18 Jul 2025
Withdrawal Update Form 3File: Form-3-T5.pdf18 Jul 2025
Withdrawal Update Form 3File: Form-3-T5.pdf18 Jul 2025
Withdrawal Update Form 3File: Form-3-T5.pdf18 Jul 2025
Withdrawal Update Form 3File: Form-3-T5.pdf18 Jul 2025
Disclosure of sold/ booked inventoryFile: Inventory-T5.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-T5.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-T5.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-T5.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-T5.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-T5.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-T5.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-T5.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory-T5.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-T5.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-T5.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-T5.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-T5.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory-T5.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-T5.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_T5_Project Launch_revised.pdf2 Dec 2024
Other - FinanceFile: Form 3 Declaration.pdf7 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Rahul disclosure corrected.pdf5 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Rohit disclosure corrected .pdf5 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Form B.pdf5 Nov 2024
Other - TechnicalFile: 1 Block PlanT5.pdf4 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI- Letter Head AKf.pdf31 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI- Letter Head UCRf.pdf31 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_T5f.pdf24 Oct 2024
Copy of the legal title reportFile: T5 _Title Report.pdf23 Oct 2024
Declaration in FORM BFile: Form B lT.pdf23 Oct 2024
Other - LegalFile: Change in name certificate Parel.pdf23 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI- C Niranjanf.pdf23 Oct 2024
Details of encumbrances concerned to FinanceFile: Finance Encum.pdf22 Oct 2024
Details of encumbrances concerned to FinanceFile: legal encum.pdf22 Oct 2024
Proforma of Allotment letterFile: T5-Allotment Letter.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Tower 5 - IA -signedf.pdf22 Oct 2024
Declaration about Commencement CertificateFile: CC declaration.pdf22 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Formate A bank.pdf22 Oct 2024
Deviation Report with respect to Allotment letterFile: deviation allotement T5.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: Finance Encum.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: legal encum.pdf22 Oct 2024
Other - FinanceFile: declaration cersai.pdf22 Oct 2024
Other - TechnicalFile: circular 10.pdf22 Oct 2024

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
L and T Realty Evara Heights T2Thane 400606334OngoingAug 2030Aug 2030
L and T Realty Evara Heights T1Thane 400606435OngoingAug 2030Aug 2030
L and T Realty Evara Heights T4Thane 40060678OngoingApr 2030Apr 2030
Crescent Bay - T3Parel sewri Dadar Naigaon Parel Mumbai 400012268CompletedMar 2023Aug 2022
Crescent Bay - T2Parel sewri Dadar Naigaon Parel Mumbai 400012240CompletedMar 2019Mar 2019
Crescent Bay - T6Parel sewri Dadar Naigaon Parel Mumbai 400012194CompletedJan 2019Late, Sep 2020
Crescent Bay - T5Parel sewri Dadar Naigaon Parel Mumbai 400012298CompletedMar 2018Mar 2018
Crescent Bay - T4Parel sewri Dadar Naigaon Parel Mumbai 400012270CompletedMar 2018Late, Mar 2019
Crescent Bay - T1 - 40, 41 floorsParel sewri Dadar Naigaon Parel Mumbai 40001212CompletedMar 2018Mar 2018

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep L and T Realty Evara Heights T5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Panchpakhadi7,600+ in Thane

Builder: ELANTE PROPERTIES PRIVATE LIMITED

ELANTE PROPERTIES PRIVATE LIMITED has 4 registrations on MahaRERA, including L and T Realty Evara Heights T1 and L and T Realty Evara Heights T2. Its filings disclose 9 earlier MahaRERA projects: declares 7 of 9 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if L and T Realty Evara Heights T5 is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of L and T Realty Evara Heights T5?

The registered promoter entity is ELANTE PROPERTIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in L and T Realty Evara Heights T5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for L and T Realty Evara Heights T5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at L and T Realty Evara Heights T5?

The professionals named in the filing: Architect: Sandeep Madhav Shikre Shikre; Engineer: Swapnil Joshi; Engineer: Venkatesh lyenger; Chartered Accountant: Urmit Shah; Chartered Accountant: Sharp and Tannan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in L and T Realty Evara Heights T5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About L and T Realty Evara Heights T5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save L and T Realty Evara Heights T5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.