Home / Browse projects / Pune, Maharashtra / KUTUMB PRIME PROJECT 6

Registration lapsed Litigation declared Residential / Group Housing project

KUTUMB PRIME PROJECT 6

By NAIKNAVARE BUILDCON PRIVATE LIMITED

RG-MH-19593 · RERA P52100077735 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
20 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
2 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

KUTUMB PRIME PROJECT 6 is a Residential / Group Housing project by NAIKNAVARE BUILDCON PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100077735 on 24 Oct 2024. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 14 of the 16 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.

At a glance

Project

  • NameKUTUMB PRIME PROJECT 6
  • TypeResidential / Group Housing
  • Location
    • OLD MUMBAI PUNE NATIONAL HIGHWAY
    • WADGAON MAVAL
    • Talegaon Dabhade (M Cl)
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • RERA no.P52100077735
  • ReraGenie IDRG-MH-19593

Builder

  • NameNAIKNAVARE BUILDCON PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsRANJIT NAIKNAVARE, HEMANT NAIKNAVARE
  • Declared earlier projects1 →

Key dates

4 months past promisethis monthRegisteredOct 2024PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Oct 2024
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed58 files

Current status

88%14 of 16 units booked
100.0%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING D4NA77808
BUILDING D3NA77808

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

BUILDING D482%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered8
Open Space17
BuildingClosed/CoveredOpen SpaceTotal
BUILDING D44812
BUILDING D34913

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,433 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2386.08
Proposed, not sanctioned2,386 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE MAIN BRANCH FERGUSSON COLLEGE ROAD PUNE 411004
Estimated costRs 5.94 cr
Cost incurredRs 5.94 cr
Work done100.0%
BuildingWingEstimatedIncurred
BUILDING D4NARs 2.85 crRs 2.85 cr
BUILDING D3NARs 2.85 crRs 2.85 cr
-NARs 24.60 lakhRs 24.60 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAURI NAIKNAVARE
EngineerSUNIL MULIK
Chartered AccountantNAHAR JAIN & ASSOCIATES
Chartered AccountantSHRISHRIMAL AND ASSOCIATES
PartnerRole in project
NAIKNAVARE BUILDCON PRIVATE LIMITED-

Litigation declared2

CaseCourtStatus
146/2022CIVIL JUDGE SENIOR DIVISION WADGAON MAWALEVIDENCE
82/2021CIVIL JUDGE SENIOR DIVISION WADGAON MAWALEVIDENCE

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: KUTUMB PRIMEPROJECT 6 RERA JAN MAR 26.pdf20 Apr 2026
Withdrawal Update Form 2File: KUTUMB 6 FORM 2.pdf20 Apr 2026
Withdrawal Update Form 3File: kutumb prime 6(1-6)_merged (1)_compressed.pdf20 Apr 2026
Withdrawal Update Form 1File: KUTUMB PRIME PROJECT 6 FORM 1.pdf16 Jan 2026
Withdrawal Update Form 2File: KUTUMB 6 FORM 2.pdf16 Jan 2026
Withdrawal Update Form 3File: Kutumb 6 form 3_11zon.pdf16 Jan 2026
Form 5 (FY 2024-2025)File: KUTUMB 6 FORM 5.PDF19 Dec 2025
Form 1File: D3 D4 FORM 1.pdf18 Oct 2025
Form 2File: D3D4 FORM 2.pdf18 Oct 2025
Form 3File: kutumb 6 form FORM 3.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: kutumb 6 form FORM 3.pdf18 Oct 2025
Form 1File: KUTUMB 6 FORM 1.pdf19 Jul 2025
Form 2File: KUTUMB 6 FORM 2.pdf19 Jul 2025
Form 3File: KUTUMB 6 FORM 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Kutumb 6 Sold Unsold.pdf19 Jul 2025
Self-declaration of Quarterly ProgressFile: KUTUMB 6 SELF DECLARATION.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kutumb Prime Pro6.pdf28 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Kutumb Prime Pro6.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kutumb Prime Pro 6.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kutumb 6.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kutumb Prime Pro6.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KUTUMB6 MERGE_compressed.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCH CERTIFICATE -PROJECT 6 D3 D4.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: KUTUMB 6.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KUTUMB D3-D4.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: KUTUMB 6.pdf8 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation to Allotment.pdf14 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: NA ODER 2012.pdf12 Aug 2024
CERSAI detailsFile: KUTUMB PROJECT 6 CERSAI UNDERTAKING.pdf30 Jul 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE 20240812.pdf20 Jul 2024
Deviation Report with respect to model copy of AgreementFile: deviatipn to ats d3 d4 130824.pdf8 Jul 2024
Proforma of Agreement for saleFile: Final Revised KUtumb Ats D3-D4 161024.pdf8 Jul 2024
Proforma of Agreement for saleFile: Final Revised KUtumb Ats D3-D4 14-8-24.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: kutumb d3-d4 form 2.pdf20 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth Cheking (1).pdf18 Jun 2024
Other - TechnicalFile: 20240615152025.pdf15 Jun 2024
Other - LegalFile: GetUserDocumentFileContent (6) (1).pdf7 Jun 2024
Copy of the legal title reportFile: Revise Final Title Report D3 D4 31 7 24.pdf6 Jun 2024
Other - LegalFile: वडगाव_126_1_3_प्लॉट_अे_Satbara.pdf6 Jun 2024
Building plan approvalFile: Plot-A Sanction Plan no 3_11zon.pdf5 Jun 2024
Building plan approvalFile: Plot-A Sanction Plan no 2_11zon.pdf5 Jun 2024
Layout approvalFile: Plot-A Sanction Plan no 1_11zon.pdf5 Jun 2024
PAN CardFile: PAN-NBPL.pdf5 Jun 2024
Details of encumbrances concerned to FinanceFile: KUTUMB 6.pdf5 Jun 2024
Details of encumbrances concerned to FinanceFile: Legal Enc D3-D4.pdf5 Jun 2024
Copy of Layout Approval (in case of layout)File: Plot-A Sanction Plan no 1_11zon.pdf5 Jun 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (2)-pages (1).pdf5 Jun 2024
Declaration in FORM BFile: D3 - D4 RERA Form B 31ST MAY.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-Project-6_compressed.pdf5 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Plot A Commencement Certificate dt 21102022 udpcr.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plot-A Sanction Plan no 2_11zon.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plot-A Sanction Plan no 3_11zon.pdf5 Jun 2024
CERSAI detailsFile: Asset base search report Kutumb Prime Project-06.pdf5 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT DECLARATION.pdf5 Jun 2024
Details of encumbrances concerned to LegalFile: KUTUMB 6.pdf5 Jun 2024
Details of encumbrances concerned to LegalFile: Legal Enc D3-D4.pdf5 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: order no 39-RDN sir.pdf5 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: order no 39- HDN Sir.pdf5 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KUTUMB PRIMES. NO. 126 PART AT MAWAL PUNE 41210636CompletedMar 2020Late, Jun 2023

How this compares with Pune

88%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KUTUMB PRIME PROJECT 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADGAON MAVAL13,700+ in Pune

Builder: NAIKNAVARE BUILDCON PRIVATE LIMITED

NAIKNAVARE BUILDCON PRIVATE LIMITED has 1 registration on MahaRERA, including KUTUMB PRIME PROJECT 6. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that KUTUMB PRIME PROJECT 6 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KUTUMB PRIME PROJECT 6 is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUTUMB PRIME PROJECT 6?

The registered promoter entity is NAIKNAVARE BUILDCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUTUMB PRIME PROJECT 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KUTUMB PRIME PROJECT 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUTUMB PRIME PROJECT 6?

The professionals named in the filing: Architect: GAURI NAIKNAVARE; Engineer: SUNIL MULIK; Chartered Accountant: NAHAR JAIN & ASSOCIATES; Chartered Accountant: SHRISHRIMAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUTUMB PRIME PROJECT 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUTUMB PRIME PROJECT 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUTUMB PRIME PROJECT 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.