Home / Browse projects / KUTUMB

Registration lapsed No litigation declared Residential / Group Housing project

KUTUMB

By PPROM CONSTRUCTIONS LLP

RG-MH-34678 · RERA P52800018472 · Last updated on MahaRERA portal: 13 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2024Possession promised22 months past this date
0 of 594Construction stages doneacross 54 buildings; furthest along: Slabs of Super Structure, 25%
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

KUTUMB is a Residential / Group Housing project by PPROM CONSTRUCTIONS LLP in GAVTALE, 415712, registered with MahaRERA as P52800018472 on 5 Nov 2018. Possession was promised by 30 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameKUTUMB
  • TypeResidential / Group Housing
  • Location
    • WAKAVALI UNHAVARE ROAD
    • GAVTALE
    • 415712
  • Pincode415712
  • RERA no.P52800018472
  • ReraGenie IDRG-MH-34678

Builder

  • NamePPROM CONSTRUCTIONS LLP
  • Entity typePartnership
  • PartnersSONALI TUSHAR JOSHI, SAYALI SANDEEP JOSHI, VANITA MOHAN SALVI, PRANJALI ABHIJIT SAIGAONKAR, RASHMI AJIT CHAUDHARI, JANKI DEV TIWARI
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

22 months past promisethis monthRegisteredNov 2018PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Nov 2018
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings54 building records
  • Documents filed105 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
K1 - 2BFNA20000
K2- 2BFJNA20000
K3 - 2BGNA10000
K4,5NA20000
K6-2BGNA10000
K7 - 2BFNA20000
K8 - 2BGNA10000
K9 - BFNA20000
K 10- BFNA20000
K11 A- 2BFK3NA20000
K12 - 2BFJNA20000
K13 - 2BFJNA20000
K14 A- 2BFKnNA20000
K15 - 2BGNA10000
K 16 - 2BFJNA20000
K17 - 2BFJNA20000
K 18 - 2BFJNA20000
K 19 A/B/C/D - BFNA20000
K-2 2BFKsNA10000
K20 - 2BGNA10000
K21 - 2BGNA10000
K22 - 2BGNA10000
K23 - 2 BFJNA20000
K24 - 2BFJNA20000
K25 - 2BFJNA20000
K26 - 2BFJNA20000
K27 - 2BGNA10000
K28 - 1BG TWINNA10000
K29 - 1BG TWINNA10000
K-30 - 2BFJNA20000
K31 - 2BGNA10000
K32 - 2BGNA10000
K33 - 2BGNA10000
K34 - 2BGNA10000
K35 -BFNA20000
K36 - 2BFJNA20000
K37 - 2BFJNA20000
K38 - 2BGNA20000
K39 - 2BGNA10000
K40- 2BGNA10000
K41 - 2BGNA10000
K42 - 2BGNA10000
K43 - BF TWINNA20000
K44- 2BFJNA10000
K45 - 2BGNA10000
K46 - 2BGNA10000
K47 - 2BGNA10000
K48 -BF TWINNA20000
K49 -2BFJNA20000
K50 - 2BFJNA20000
K51NA20000
K52 - BF TWINNA20000
K-14B -BFK2NA20000
K-11B - 2BFK4NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 13 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 54 buildings; the table lists the first 20.

0 of 594 construction stages are filed complete across 54 buildings. The stage furthest along is Slabs of Super Structure, at 25%.

K1 - 2BF10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K2- 2BFJ8%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
K3 - 2BG10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K4,510%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K6-2BG10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K7 - 2BF10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K8 - 2BG10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K9 - BF10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K 10- BF10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K11 A- 2BFK38%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
K12 - 2BFJ10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K13 - 2BFJ10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K14 A- 2BFKn8%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
K15 - 2BG10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K 16 - 2BFJ10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K17 - 2BFJ10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K 18 - 2BFJ10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K 19 A/B/C/D - BF10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
K-2 2BFKs8%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
K20 - 2BG10%
ActivityProgress
Excavation10%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 13 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes68%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes75%
Street LightingYes90%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Open Space64
BuildingOpen SpaceTotal
K1 - 2BF22
K2- 2BFJ11
K3 - 2BG11
K4,522
K6-2BG11
K7 - 2BF22
K8 - 2BG11
K9 - BF11
K 10- BF11
K11 A- 2BFK311
K12 - 2BFJ11
K13 - 2BFJ11
K14 A- 2BFKn22
K15 - 2BG11
K 16 - 2BFJ11
K17 - 2BFJ11
K 18 - 2BFJ11
K 19 A/B/C/D - BF22
K-2 2BFKs11
K20 - 2BG11
K21 - 2BG11
K22 - 2BG11
K23 - 2 BFJ11
K24 - 2BFJ11
K25 - 2BFJ11
K26 - 2BFJ11
K27 - 2BG11
K28 - 1BG TWIN22
K29 - 1BG TWIN22
K-30 - 2BFJ11
K31 - 2BG11
K32 - 2BG11
K33 - 2BG11
K34 - 2BG11
K35 -BF11
K36 - 2BFJ11
K37 - 2BFJ11
K38 - 2BG11
K39 - 2BG11
K40- 2BG11
K41 - 2BG11
K42 - 2BG11
K43 - BF TWIN22
K44- 2BFJ11
K45 - 2BG11
K46 - 2BG11
K47 - 2BG11
K48 -BF TWIN22
K49 -2BFJ11
K50 - 2BFJ11
K5111
K52 - BF TWIN22
K-14B -BFK211
K-11B - 2BFK411

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,159 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5158.0
Proposed, not sanctioned5,158 sq m
Buildings approved54
Buildings sanctioned54

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAMNAGAR DOMBIVLI BRANCH COMMERCE CENTRE TONDON ROAD DOMBIVLI EAST 421201

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJOSHI SAIGAONKAR ASSOCIATES
EngineerGNR Consulting Engineers
Chartered AccountantGadre & Bal
PartnerRole in project
PPROM CONSTRUCTIONS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Feb 2025

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K19 c-d.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K20.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K21.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K23.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K25.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K30.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K31.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K32.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K33.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K35.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K43 -A-B.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K44.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K45 .pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K52A-B.pdf13 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K1.pdf12 Feb 2025
Certificates of CA (Form 3)File: Pprom construction CA certificate-Sept23.pdf17 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kutumb Architect Certifiacte Sep 2023.pdf30 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KUTUMB SEPT 2023 CHIKODI SIR CERTIFICATE (1).pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: PProm LLP-Kutumb-Form-5-Annual Certificate-FY22-23.pdf30 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kutumb Architect Certifiacte June 2023.pdf28 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE JUNE 2023 (1).pdf28 Jul 2023
Certificates of CA (Form 3)File: KUTUMB FORM 3 JUNE 2023.pdf28 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kutumb Architect Certifiacte March 2023.pdf19 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kutumb Engineer Certificate March 2023.pdf19 Apr 2023
Certificates of CA (Form 3)File: CA CERTIFICATE MARCH 2023 KUTUMB.pdf19 Apr 2023
Certificates of CA (Form 3)File: Pprom LLPRera Form3 CA Certificate Dec22.pdf24 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LLP Architect's Certificate DEC'22.pdf22 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERT DEC 2022 KUTUMB.pdf22 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: PProm LLP-Kutumb-Form-5-Annual Certificate-FY21-22.pdf9 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KUTUMB SEPT 2022 ARCHITECT CERT.pdf11 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTificate sept 2022 kutumb.pdf11 Oct 2022
Certificates of CA (Form 3)File: Pprom-Kutumb RERA CertificateSept22.pdf11 Oct 2022
Certificates of CA (Form 3)File: Pprom-Kutumb RERA CertificateSept22.pdf11 Oct 2022
Building plan approvalFile: K32.pdf19 Aug 2022
Building plan approvalFile: K34.pdf19 Aug 2022
Building plan approvalFile: K14A.pdf19 Aug 2022
Building plan approvalFile: K48B.pdf19 Aug 2022
Building plan approvalFile: K14B.pdf19 Aug 2022
Building plan approvalFile: K48A.pdf19 Aug 2022
Building plan approvalFile: K11A.pdf19 Aug 2022
Building plan approvalFile: K11B.pdf19 Aug 2022
Building Plan Approval (IOD)File: K32.pdf19 Aug 2022
Building Plan Approval (IOD)File: K34.pdf19 Aug 2022
Building Plan Approval (IOD)File: K14A.pdf19 Aug 2022
Building Plan Approval (IOD)File: K48B.pdf19 Aug 2022
Building Plan Approval (IOD)File: K14B.pdf19 Aug 2022
Building Plan Approval (IOD)File: K48A.pdf19 Aug 2022
Building Plan Approval (IOD)File: K11A.pdf19 Aug 2022
Building Plan Approval (IOD)File: K11B.pdf19 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LLP Architect's Certificate June'22-compressed.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LLP Engineers's Certificate (Apr'22 to June'22) Final .pdf7 Jul 2022
Certificates of CA (Form 3)File: Pprom-Kutumb-RERA Certificate.pdf7 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_compressed.pdf6 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: final Engineer's Certificate Mar'22.pdf6 Apr 2022
Certificates of CA (Form 3)File: C A CERTIFICATE MARCH 2022_compressed.pdf6 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate dec21.pdf10 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: E C D 21_compressed.pdf10 Jan 2022
Certificates of CA (Form 3)File: ca cert dec21.pdf7 Jan 2022
Certificates of CA (Form 3)File: cert ca s21.pdf14 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ac sept2021.pdf8 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC SPT 2021.pdf8 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert june21.pdf8 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: current eng cet june21.pdf8 Jul 2021
Certificates of CA (Form 3)File: current CA CERT JUNE21.pdf8 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rera cert a.pdf22 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: rera cert e.pdf22 Jun 2021
Certificates of CA (Form 3)File: RERA cert c.pdf22 Jun 2021
Disclosure of sold/ booked inventoryFile: Scanned Documents curicular.pdf25 May 2021
OtherFile: Scanned Documents.pdf25 May 2021
Building plan approvalFile: Scanned Documents 5.pdf21 May 2021
Building plan approvalFile: Scanned Documents 4.pdf21 May 2021
Building plan approvalFile: Scanned Documents 3.pdf21 May 2021
Building plan approvalFile: Scanned Documents 2.pdf21 May 2021
Building plan approvalFile: Scanned Documents (1).pdf21 May 2021
Building Plan Approval (IOD)File: Scanned Documents 5.pdf21 May 2021
Building Plan Approval (IOD)File: Scanned Documents 4.pdf21 May 2021
Building Plan Approval (IOD)File: Scanned Documents 3.pdf21 May 2021
Building Plan Approval (IOD)File: Scanned Documents 2.pdf21 May 2021
Building Plan Approval (IOD)File: Scanned Documents (1).pdf21 May 2021
Details of Restarting of Construction work post lockdownFile: prant permission-lockdown.pdf7 Apr 2021

Keep KUTUMB on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GAVTALE

Builder: PPROM CONSTRUCTIONS LLP

PPROM CONSTRUCTIONS LLP has 2 registrations on MahaRERA, including JANAK JAMBHA NAGARI and KUTUMB. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What does it mean that KUTUMB shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KUTUMB is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUTUMB?

The registered promoter entity is PPROM CONSTRUCTIONS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUTUMB?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KUTUMB?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUTUMB?

The professionals named in the filing: Architect: JOSHI SAIGAONKAR ASSOCIATES; Engineer: GNR Consulting Engineers; Chartered Accountant: Gadre & Bal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUTUMB?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUTUMB. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUTUMB to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.