Kuteer construction
RG-MH-29135 · RERA P99000028174 · Last updated on MahaRERA portal: 17 Sep 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kuteer construction is a Residential / Group Housing project by Kuteer Construction in Palghar, Maharashtra, registered with MahaRERA as P99000028174 on 10 Feb 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 5 of the 8 units on this registration are recorded sold or booked, and 18 of 88 construction stages are filed complete.
At a glance
Project
- NameKuteer construction
- TypeResidential / Group Housing
- Location
- Dhovli
- Vasai
- Vasai-Virar City (M Corp)
- Palghar
- 401207
- Pincode401207
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000028174
- ReraGenie IDRG-MH-29135
Builder
- NameKuteer Construction
- Entity typePartnership
- PartnersPritam Patil, Pranita Raut, Prajwal Patil, Sanjay Raut, Sameer Patil
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 Feb 2021
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings8 building records
- Documents filed54 files
Current status
Figures as on 17 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Row House No 1 | NA | 2 | 2 | 1 | 0 | 1 |
| Row House No 2 | NA | 2 | 2 | 1 | 0 | 1 |
| Row House No 3 | NA | 2 | 0 | 1 | 0 | 1 |
| Row House No 4 | NA | 2 | 0 | 1 | 0 | 1 |
| Bunglow 1 | NA | 2 | 2 | 1 | 0 | 1 |
| Bunglow 2 | NA | 2 | 2 | 1 | 0 | 1 |
| Bunglow 3 | NA | 2 | 2 | 1 | 0 | 1 |
| Bunglow 4 | NA | 2 | 0 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 17 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 80%.
Row House No 136%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 100% |
| Podiums (if any) | 50% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Row House No 218%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Row House No 318%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Row House No 418%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bunglow 152%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bunglow 239%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bunglow 367%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bunglow 418%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Row House No 1 | 1 | 1 |
| Row House No 2 | 1 | 1 |
| Row House No 3 | 1 | 1 |
| Row House No 4 | 1 | 1 |
| Bunglow 1 | 1 | 1 |
| Bunglow 2 | 1 | 1 |
| Bunglow 3 | 1 | 1 |
| Bunglow 4 | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Vishal Janardan Mhatre | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Encon Sanjay Narang |
| Engineer | Sanjay Narang Sanjay Narang |
| Chartered Accountant | A V Bhase and co Vishnu Bhase |
| Chartered Accountant | Akshay Mahtre |
| Partner | Role in project |
|---|---|
| Kuteer Construction | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jan 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1.pdf | 17 Sep 2025 |
| Form 2File: form 2.pdf | 17 Sep 2025 |
| Form 3File: form 3 new.pdf | 17 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold list.pdf | 17 Sep 2025 |
| Form 1File: form 1 31122024_compressed.pdf | 17 Jun 2025 |
| Form 2File: form 2 31122024_compressed.pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold list.pdf | 17 Jun 2025 |
| Form 3File: form 3 new.pdf | 17 Jun 2025 |
| Form 1File: form 1 31032025_compressed.pdf | 17 Jun 2025 |
| Form 2File: form 2 31032025_compressed.pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold list.pdf | 17 Jun 2025 |
| Form 3File: form 3 new.pdf | 17 Jun 2025 |
| Form 5 (FY 2024-2025)File: form 5 (23-24).pdf | 17 Jun 2025 |
| Form 5 (FY 2023-2024)File: form 5 (23-24).pdf | 17 Jun 2025 |
| Form 5 (FY 2022-2023)File: form 5 (22-23).pdf | 17 Jun 2025 |
| Form 5 (FY 2021-2022)File: form 5 (21-22).pdf | 17 Jun 2025 |
| Form 5 (FY 2020-2021)File: form 5 (20-21).pdf | 17 Jun 2025 |
| Form 2A (FY 2024-2025)File: Form 2A24-25.pdf | 9 Jun 2025 |
| Form 2A (FY 2022-2023)File: Form 2A 23-24.pdf | 9 Jun 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 22-23.pdf | 6 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 (23-24).pdf | 22 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 (23-24).pdf | 22 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold list.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 11 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 22-23.pdf | 29 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 new.pdf | 2 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2021.pdf | 12 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2022.pdf | 12 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 new_compressed.pdf | 6 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 new_compressed.pdf | 6 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: eng certi form new form 1_compressed.pdf | 5 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate form 2 new_compressed.pdf | 5 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 architects licence engineer certificate.pdf | 27 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate.pdf | 27 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5.pdf | 27 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: img20220319_15290252.pdf | 19 Mar 2022 |
| Layout approvalFile: LAYOUT.pdf | 21 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 21 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED CC.pdf | 16 Nov 2021 |
| Declaration in FORM BFile: FORM B.pdf | 28 Jan 2021 |
| Proforma of Allotment letterFile: Allotment letter-converted.pdf | 28 Jan 2021 |
| Copy of the legal title reportFile: TITLE CERTIFICATE.pdf | 25 Jan 2021 |
| Building plan approvalFile: NA.pdf | 23 Dec 2020 |
| Layout approvalFile: LAYOUT PLAN.pdf | 23 Dec 2020 |
| PAN CardFile: kuteer construction pancard.pdf | 23 Dec 2020 |
| Details of encumbrancesFile: Title certificate.pdf | 23 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 23 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: NA.pdf | 23 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf | 23 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kuteer Construction CA certificate.pdf | 23 Dec 2020 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE Bunglow DHOVALI WITH CC.pdf | 23 Dec 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Pawan KuteerP99000029122 | Vasai, Palghar | Apr 2021 | Certificate Signed | Dec 2023 | Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Kuteer construction on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vasai3,200+ in Palghar
Filed coordinates, straight-line distance. 134 registered projects within 2 km.
SHRIPAL SATTVA - BLDG. 1
SHRIPAL SATTVA LLP
SUNSHINE MEADOWS
SHANTEE GLOBAL REALTY LLP
Mangeshi Gemini
Mangesh Dashrath Gaikar
SKY VISTA
M/s. Divine Construction
Miracle Tower
Modernscape Infra LLP
PREMIER ELEGANCE
PREMEAR LANDMARK DEVELOPERS LLP
See every Palghar project, with the district possession charts
Builder: Kuteer Construction
Kuteer Construction has 1 registration on MahaRERA, including Kuteer construction. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that Kuteer construction shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Kuteer construction is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kuteer construction?
The registered promoter entity is Kuteer Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kuteer construction?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Kuteer construction?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kuteer construction?
The professionals named in the filing: Architect: Encon Sanjay Narang; Engineer: Sanjay Narang Sanjay Narang; Chartered Accountant: A V Bhase and co Vishnu Bhase; Chartered Accountant: Akshay Mahtre. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kuteer construction?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback