Home / Browse projects / Palghar, Maharashtra / SUNSHINE MEADOWS

Registered No litigation declared Others project

SUNSHINE MEADOWS

By SHANTEE GLOBAL REALTY LLP

RG-MH-17627 · RERA P99000056159 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 17.50 crore secured on the land, in favour of MOTILAL OSWAL HOME FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
6 of 33Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 95%
247 of 315Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

SUNSHINE MEADOWS is a Others project by SHANTEE GLOBAL REALTY LLP in Palghar, Maharashtra, registered with MahaRERA as P99000056159 on 16 May 2024. Possession is promised by 31 Dec 2030. 68 of the 315 units on this registration are recorded sold or booked, and 6 of 33 construction stages are filed complete.

At a glance

Project

  • NameSUNSHINE MEADOWS
  • TypeOthers
  • Location
    • VILL DHOULI
    • TAL-VASAI
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401207
  • Pincode401207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000056159
  • ReraGenie IDRG-MH-17627

Builder

  • NameSHANTEE GLOBAL REALTY LLP
  • Entity typePartnership
  • PartnersNIYAZ ABDUL SAMAD PATHAN, RAAZ MOHAMMED ABDUL SAMAD PATHAN
  • Declared earlier projects7 →

Key dates

this monthRegisteredMay 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 May 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings3 building records
  • Documents filed96 files

Current status

22%68 of 315 units booked
42.1%Work done, per cost certificate

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUNSHINE MEADOWS A WINGNA20191490149
SUNSHINE MEADOWS B WINGNA16139612108
SUNSHINE MEADOWS C WINGNA161354458

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 95%.

SUNSHINE MEADOWS A WING15%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SUNSHINE MEADOWS B WING53%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
SUNSHINE MEADOWS C WING52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered30
Open Space22
BuildingClosed/CoveredOpen SpaceTotal
SUNSHINE MEADOWS A WING8715
SUNSHINE MEADOWS B WING16824
SUNSHINE MEADOWS C WING6713

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,813 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofMOTILAL OSWAL HOME FINANCE LIMITED
Secured amountRs 17.50 crore
CERSAI search filedYes
Declared on30 Nov 2025

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI19900.52
Proposed, not sanctioned9,570 sq m
Buildings approved5
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAURYA SHOPPING CENTRE AMBADI ROAD S NO 16 VASAI 401202
Estimated costRs 41.10 cr
Cost incurredRs 17.30 cr
Work done42.09%
BuildingWingEstimatedIncurred
SUNSHINE MEADOWS A WINGNARs 20.00 crRs 3.00 cr
SUNSHINE MEADOWS B WINGNARs 12.80 crRs 7.65 cr
SUNSHINE MEADOWS C WINGNARs 8.00 crRs 6.65 cr
-NARs 30.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY MALOO & ASSOCIATES
ArchitectMufaddal Merchant
EngineerMohammed shoeb bhati
EngineerSUJIT GHOROI
Chartered AccountantJINESH JOSHI
Chartered AccountantHARESH MEHTA AND ASSOCIATES
PartnerRole in project
SHANTEE GLOBAL REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1- SUNSHINE MEADOWS.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM 2- SUNSHINE MEADOWS.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM-03 SHANTEE GLOBAL REALTY LLP.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM 1 SUNSHINE MEADOWS.pdf28 Jan 2026
Withdrawal Update Form 2File: FORM 2 SUNSHINE MEADOWS.pdf28 Jan 2026
Withdrawal Update Form 3File: FORM 3 SUNSHINE MEADOWS.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5 MEADOWS.pdf28 Jan 2026
Withdrawal Update Form 1File: FORM 1 SUNSHINE MEADOWS.pdf2 Dec 2025
Withdrawal Update Form 2File: FORM 2 SUNSHINE MEADOWS.pdf2 Dec 2025
Withdrawal Update Form 3File: FORM 3 SUNSHINE MEADOWS_compressed.pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 SUNSHINE MEADOWS.pdf23 Nov 2025
Withdrawal Update Form 2File: FORM 2 SUNSHINE MEADOWS.pdf23 Nov 2025
Withdrawal Update Form 3File: FORM 3 SUNSHINE MEADOWS_compressed.pdf23 Nov 2025
Form 2A (FY 2024-2025)File: FORM 2A-GLOBAL ENG. CERT FOR QUALITY.pdf19 Nov 2025
Form 1File: FORM 1 SUNSHINE MEADOWS.pdf13 Nov 2025
Form 2File: FORM 2 SUNSHINE MEADOWS.pdf13 Nov 2025
Form 3File: FORM 3 SUNSHINE MEADOWS..pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SUNSHINE MEADOWS.pdf13 Nov 2025
Form 1File: FORM 1 SUNSHINE MEADOWS.pdf13 Nov 2025
Form 2File: FORM 2 SUNSHINE MEADOWS.pdf13 Nov 2025
Form 3File: FORM 3 SUNSHINE MEADOWS A-B-C WING.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MEADOWS 30092024_compressed.pdf13 Nov 2025
Form 1File: FORM 1 SUNSHINE MEADOWS.pdf13 Nov 2025
Form 2File: FORM 2 MEADOWS.pdf13 Nov 2025
Form 3File: FORM 3 SUNSHINE MEADOWS.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MEADOWS 31122024_compressed.pdf13 Nov 2025
Form 1File: FORM 1 MEADOWS MAR 25.pdf13 Nov 2025
Form 2File: FORM 2 MEADOWS MAR 25.pdf13 Nov 2025
Form 3File: FORM-3 SUNSHINE MEADOWS.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MEADOWS 31032025_compressed (1).pdf13 Nov 2025
Form 1File: FORM 1 SUNSHINE MEADOWS.pdf9 Nov 2025
Form 2File: FORM 2 SUNSHINE MEADOWS.pdf9 Nov 2025
Form 3File: FORM 3 SUNSHINE MEADOWS_compressed.pdf9 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MEADOWS 30092025_compressed.pdf9 Nov 2025
Form 1File: FORM-1 SUNSHINE MEADOWS.pdf15 Aug 2025
Form 2File: FORM-2 SUNSHINE MEADOWS.pdf15 Aug 2025
Form 3File: FORM-3 SUNSHINE MEADOWS.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: MEADOWS SOLD AND UNSOLD JUN 25_compressed.pdf15 Aug 2025
FORM 1 MEADOWS MAR 2529 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SUNSHINE MEADOWS.pdf29 Apr 2025
FORM 2 MEADOWS MAR 2529 Apr 2025
Layout approvalFile: SUNSHINE MEADOWS LAYOUT.pdf20 Apr 2025
Building plan approvalFile: SUNSHINE MEADOWS PLAN1.pdf20 Apr 2025
Copy of Layout Approval (in case of layout)File: SUNSHINE MEADOWS LAYOUT.pdf20 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SUNSHINE MEADOWS PLAN1.pdf20 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf30 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MEADOWS FORM 1.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SUNSHINE MEADOWS FORM 3 REDUCE.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MEADOWS FORM 2.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SUNSHINE MEADOWS A WING.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SUNSHINE MEADOWS B WING.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SUNSHINE MEADOWS C WING.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SUNSHINE MEADOWS A-B-C WING.pdf27 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SUNSHINE MEADOWS A WING.pdf27 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SUNSHINE MEADOWS B WING.pdf27 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SUNSHINE MEADOWS C WING.pdf27 Nov 2024
Other - TechnicalFile: FINAL SHANTEE GLOBAL REALTY LLP SIGNED AGREE_compressed.pdf11 May 2024
Other - LegalFile: SELF DECLARATION STORE.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SUNSHINE MEADOWS.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SUNSHINE MEADOWS REVISED.pdf26 Apr 2024
Other - LegalFile: DECLARATION ANNEXURE A.pdf26 Apr 2024
Other - LegalFile: DECLARATION CUM UNDERTAKING-SUNSHINE MEADOWS.pdf26 Apr 2024
Other - TechnicalFile: BUILDING APPROVAL.pdf26 Apr 2024
Proforma of Agreement for saleFile: SALES AGREEMENT DHAVLI.pdf5 Apr 2024
Deviation Report with respect to model copy of AgreementFile: deviation to sales agreement.pdf5 Apr 2024
Other - LegalFile: SUNSHINE MEADOWS CC AUTHENTICATION SCREENSHOT.pdf3 Apr 2024
Layout approvalFile: LAYOUT DHOWLI.pdf27 Mar 2024
Building plan approvalFile: A WING FLOOR PLAN.pdf27 Mar 2024
Building plan approvalFile: B WING FLOOR PLAN.pdf27 Mar 2024
Building plan approvalFile: B WING ELEVATION.pdf27 Mar 2024
Building plan approvalFile: C WING FLOOR PLAN.pdf27 Mar 2024
Layout approvalFile: LAYOUT DHOWLI HIGHLIGHTED.pdf27 Mar 2024
Details of encumbrances concerned to FinanceFile: FREE FROM ALL ENCUMBRANCE SUNSHINE MEADOWS.pdf27 Mar 2024
Details of encumbrances concerned to LegalFile: FREE FROM ALL ENCUMBRANCE SUNSHINE MEADOWS.pdf27 Mar 2024
Copy of Layout Approval (in case of layout)File: LAYOUT DHOWLI.pdf27 Mar 2024
Copy of Layout Approval (in case of layout)File: LAYOUT DHOWLI HIGHLIGHTED.pdf27 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: A WING FLOOR PLAN.pdf27 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: B WING FLOOR PLAN.pdf27 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: B WING ELEVATION.pdf27 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: C WING FLOOR PLAN.pdf27 Mar 2024

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHAMROCK RESIDENCYS NO 41 H NO 161 181 19 MANICKPUR VASAI PALGHAR30CompletedApr 2023Sep 2021
MEERA AVENUES no 278 Bldg no 6 sector no 1 at Vasai Palghar 401208205CompletedDec 2022Oct 2021
SARGAM RESIDENCYCHANDRAPADA NAIGAON EAST203CompletedDec 2021Mar 2021
ROMAN RESIDENCYWADAVALI VASAI WEST62CompletedAug 2019Late, Sep 2021
SUNSHINE PALACENAVGHAR VASAI EAST46CompletedMar 2018Late, Apr 2018
SUNSHINE GREEN PARK PH-1S no 226 228 227 H no 2 3 4 5 GOKHIVARE VASAI EAST343CompletedMar 2018Late, Jul 2018
SARGAM AVENUECHANDRAPADA NAIGAON EAST TAL VASAI DIST PALGHAR132CompletedMar 2016Late, Jun 2018

How this compares with Palghar

22%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUNSHINE MEADOWS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TAL-VASAI3,200+ in Palghar

2 kmSUNSHINE MEADOWSCompleted 36Lapsed / revoked 15Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 82 registered projects within 2 km.

Builder: SHANTEE GLOBAL REALTY LLP

SHANTEE GLOBAL REALTY LLP has 1 registration on MahaRERA, including SUNSHINE MEADOWS. Its filings disclose 7 earlier MahaRERA projects: declares 3 of 7 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SUNSHINE MEADOWS is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUNSHINE MEADOWS?

The registered promoter entity is SHANTEE GLOBAL REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUNSHINE MEADOWS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUNSHINE MEADOWS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUNSHINE MEADOWS?

The professionals named in the filing: Architect: SANJAY MALOO & ASSOCIATES; Architect: Mufaddal Merchant; Engineer: Mohammed shoeb bhati; Engineer: SUJIT GHOROI; Chartered Accountant: JINESH JOSHI; Chartered Accountant: HARESH MEHTA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNSHINE MEADOWS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNSHINE MEADOWS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNSHINE MEADOWS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.