Home / Browse projects / Palghar, Maharashtra / SHRIPAL SATTVA - BLDG. 1
SHRIPAL SATTVA - BLDG. 1
RG-MH-89866 · RERA P99000052272 · Last updated on MahaRERA portal: 17 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 35.00 crore secured on the land, in favour of Bajaj Housing Finance Limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHRIPAL SATTVA - BLDG. 1 is a Others project by SHRIPAL SATTVA LLP in Palghar, Maharashtra, registered with MahaRERA as P99000052272 on 9 Aug 2023. Possession is promised by 31 Dec 2027. 310 of the 431 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.
At a glance
Project
- NameSHRIPAL SATTVA - BLDG. 1
- TypeOthers
- Location
- DHOVALI
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401207
- Pincode401207
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000052272
- ReraGenie IDRG-MH-89866
Builder
- NameSHRIPAL SATTVA LLP
- Entity typeOthers
- GSTIN27AALFJ3190K1ZY
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Named personsPRADIP BASTIMAL CHOPRA, ANKIT PRADIP CHOPRA
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Aug 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed98 files
Current status
Figures as on 17 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHRIPAL SATVA BLDG 1 WING A | NA | 23 | 22 | 213 | 0 | 213 |
| SHRIPAL SATTVA BLDG 1 WING B | NA | 23 | 22 | 212 | 6 | 218 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 60%.
SHRIPAL SATVA BLDG 1 WING A45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 35% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SHRIPAL SATTVA BLDG 1 WING B51%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 55% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed268
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SHRIPAL SATVA BLDG 1 WING A | 20 | 113 | 133 |
| SHRIPAL SATTVA BLDG 1 WING B | 21 | 114 | 135 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHRIPAL SATVA BLDG 1 WING A | NA | Rs 51.25 cr | Rs 30.75 cr |
| SHRIPAL SATTVA BLDG 1 WING B | NA | Rs 51.25 cr | Rs 38.44 cr |
| - | NA | Rs 11.00 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MEGHA URBANSCAPES |
| Engineer | COMPUTER HELP STRUCTURAL ENGINNER AND SOFTWARE DEVLEOPES |
| Engineer | Santosh Futak |
| Engineer | FOUNTAINHEAD ENGINEERS CIVIL & STRUCTUAL CONSULTANTS |
| Chartered Accountant | S B JAIN AND ASSOCIATES |
| Chartered Accountant | SDK & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHRIPAL SATTVA LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 May 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1_compressed.pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3_compressed.pdf | 17 Jul 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3_compressed.pdf | 21 Apr 2026 |
| Form 2A (FY 2024-2025)File: Sattva Engg Certificate Mar25.pdf | 11 Apr 2026 |
| Form 2A (FY 2023-2024)File: Form 2A Shripal Sattva Bldg1 Mar 24.pdf | 8 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Shripal Sattva Bldg No1 Mar 26.pdf | 8 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 REVISED.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_compressed (3).pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: FORM1.pdf | 26 Nov 2025 |
| Withdrawal Update Form 1File: FORM1.pdf | 26 Nov 2025 |
| Withdrawal Update Form 2File: FORM2.pdf | 26 Nov 2025 |
| Withdrawal Update Form 2File: FORM2.pdf | 26 Nov 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 26 Nov 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 26 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 5 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 5 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3_compressed.pdf | 5 Sep 2025 |
| Copy of the legal title reportFile: title with ferfar_compressed.pdf | 13 May 2025 |
| Proforma of Agreement for saleFile: AFS building No 1 Final.pdf | 13 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed - converted.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: FORM 3_compressed - converted.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3 .pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Bldg No.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_unsold_Booked .pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate dated 22072024 .pdf | 24 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Building No 1 A B Wing 15072024.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Building No 1 A B Wing 15072024.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 18072024.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate dtd 15072024.pdf | 19 Jul 2024 |
| Proforma of Agreement for saleFile: Draft Agreement For Sale.pdf | 24 Jun 2024 |
| Building plan approvalFile: Typical- Refuge Flr-Bldg 1.pdf | 24 May 2024 |
| Building plan approvalFile: Ground -1st Flr-Bldg 1.pdf | 24 May 2024 |
| Building plan approvalFile: Cross Sec 22nd Floor-Terrace Flr-Bldg 1.pdf | 24 May 2024 |
| Building plan approvalFile: Typical-Refuge Flr-building 1_compressed.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Ground -1st Flr-Bldg 1.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Cross Sec 22nd Floor-Terrace Flr-Bldg 1.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Typical-Refuge Flr-building 1_compressed.pdf | 24 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Typical- Refuge Flr-Bldg 1.pdf | 24 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 24 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Arch Cert-Shripal Sattva.pdf | 24 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engg Cert - Shripa Sattva.pdf | 24 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Shripal Sattva.pdf | 24 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 6 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: RERA Encumbrance Letter.pdf | 10 Jan 2024 |
| Details of encumbrances concerned to LegalFile: RERA Encumbrance Letter.pdf | 10 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA UPLOAD.pdf | 4 Aug 2023 |
| Building plan approvalFile: Bldg 1AB-(2) Podium 1.pdf | 24 Jul 2023 |
| Building plan approvalFile: Bldg 1AB-(3) Podium 2.pdf | 24 Jul 2023 |
| Building plan approvalFile: Bldg 1AB-(4) Typical Flr Plan.pdf | 24 Jul 2023 |
| Building plan approvalFile: Bldg 1AB-(5) Refuge.pdf | 24 Jul 2023 |
| Building plan approvalFile: Bldg 1AB-(6) Elevation.pdf | 24 Jul 2023 |
| Building plan approvalFile: Bldg 1AB-(7) Terrece Flr.pdf | 24 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(2) Podium 1.pdf | 24 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(3) Podium 2.pdf | 24 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(4) Typical Flr Plan.pdf | 24 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(5) Refuge.pdf | 24 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(6) Elevation.pdf | 24 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(7) Terrece Flr.pdf | 24 Jul 2023 |
| Layout approvalFile: Layout Plan.pdf | 19 Jul 2023 |
| Building plan approvalFile: Bldg 1AB-(1) Grd Flr.pdf | 19 Jul 2023 |
| Building plan approvalFile: RDP CC UPLOAD.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 19 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(1) Grd Flr.pdf | 19 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: RDP CC UPLOAD.pdf | 19 Jul 2023 |
| Declaration about Commencement CertificateFile: Declaration CC revised Compressed.pdf | 19 Jul 2023 |
| Declaration about Commencement CertificateFile: Declaration for Area and Phase.pdf | 19 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration - Details of encumbrances concern to financial.pdf | 9 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Declaration - Details of encumbrances concern to financial.pdf | 9 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf | 9 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHRIPAL SATTVA - BLDG. 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHOVALI3,200+ in Palghar
Filed coordinates, straight-line distance. 95 registered projects within 2 km.
SUNSHINE MEADOWS
SHANTEE GLOBAL REALTY LLP
Mangeshi Gemini
Mangesh Dashrath Gaikar
SKY VISTA
M/s. Divine Construction
Miracle Tower
Modernscape Infra LLP
PREMIER ELEGANCE
PREMEAR LANDMARK DEVELOPERS LLP
PALACIA
M/s. Sagar Developers
See every Palghar project, with the district possession charts
Builder: SHRIPAL SATTVA LLP
SHRIPAL SATTVA LLP has 2 registrations on MahaRERA, including SHRIPAL SATTVA - BLDG. 1 and SHRIPAL SATTVA BLDG. 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if SHRIPAL SATTVA - BLDG. 1 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHRIPAL SATTVA - BLDG. 1?
The registered promoter entity is SHRIPAL SATTVA LLP, an others as per the filing. Its GSTIN 27AALFJ3190K1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHRIPAL SATTVA - BLDG. 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHRIPAL SATTVA - BLDG. 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHRIPAL SATTVA - BLDG. 1?
The professionals named in the filing: Architect: MEGHA URBANSCAPES; Engineer: COMPUTER HELP STRUCTURAL ENGINNER AND SOFTWARE DEVLEOPES; Engineer: Santosh Futak; Engineer: FOUNTAINHEAD ENGINEERS CIVIL & STRUCTUAL CONSULTANTS; Chartered Accountant: S B JAIN AND ASSOCIATES; Chartered Accountant: SDK & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHRIPAL SATTVA - BLDG. 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback