ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / SHRIPAL SATTVA - BLDG. 1

Registered No litigation declared Others project

SHRIPAL SATTVA - BLDG. 1

By SHRIPAL SATTVA LLP

RG-MH-89866 · RERA P99000052272 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Rs 35.00 crore secured on the land, in favour of Bajaj Housing Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 60%
121 of 431Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

SHRIPAL SATTVA - BLDG. 1 is a Others project by SHRIPAL SATTVA LLP in Palghar, Maharashtra, registered with MahaRERA as P99000052272 on 9 Aug 2023. Possession is promised by 31 Dec 2027. 310 of the 431 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameSHRIPAL SATTVA - BLDG. 1
  • TypeOthers
  • Location
    • DHOVALI
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401207
  • Pincode401207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000052272
  • ReraGenie IDRG-MH-89866

Builder

  • NameSHRIPAL SATTVA LLP
  • Entity typeOthers
  • GSTIN27AALFJ3190K1ZY
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Named personsPRADIP BASTIMAL CHOPRA, ANKIT PRADIP CHOPRA
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed98 files

Current status

72%310 of 431 units booked
61.0%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRIPAL SATVA BLDG 1 WING ANA23222130213
SHRIPAL SATTVA BLDG 1 WING BNA23222126218

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 60%.

SHRIPAL SATVA BLDG 1 WING A45%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHRIPAL SATTVA BLDG 1 WING B51%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed268

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots268
Closed/Covered41
Open Space227
BuildingClosed/CoveredOpen SpaceTotal
SHRIPAL SATVA BLDG 1 WING A20113133
SHRIPAL SATTVA BLDG 1 WING B21114135

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area14,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBajaj Housing Finance Limited
Secured amountRs 35.00 crore
CERSAI search filedYes
Declared on4 Sep 2025

Approvals and building plan

Sanctioning authorityVasai Virar City Muncipal Corporation
Permissible FSI24865.26
Proposed, not sanctioned22,302 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5TH FLOOR, TOWER B, PENINSULA BUSINESS PARK, SENAPATI BAPAT MARG, LOWER PAREL, MUMBAI - 400013
Estimated costRs 113.51 cr
Cost incurredRs 69.19 cr
Work done60.96%
BuildingWingEstimatedIncurred
SHRIPAL SATVA BLDG 1 WING ANARs 51.25 crRs 30.75 cr
SHRIPAL SATTVA BLDG 1 WING BNARs 51.25 crRs 38.44 cr
-NARs 11.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMEGHA URBANSCAPES
EngineerCOMPUTER HELP STRUCTURAL ENGINNER AND SOFTWARE DEVLEOPES
EngineerSantosh Futak
EngineerFOUNTAINHEAD ENGINEERS CIVIL & STRUCTUAL CONSULTANTS
Chartered AccountantS B JAIN AND ASSOCIATES
Chartered AccountantSDK & ASSOCIATES
PartnerRole in project
SHRIPAL SATTVA LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 May 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_compressed.pdf17 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf17 Jul 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf17 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf21 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf21 Apr 2026
Form 2A (FY 2024-2025)File: Sattva Engg Certificate Mar25.pdf11 Apr 2026
Form 2A (FY 2023-2024)File: Form 2A Shripal Sattva Bldg1 Mar 24.pdf8 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A Shripal Sattva Bldg No1 Mar 26.pdf8 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf22 Jan 2026
Withdrawal Update Form 2File: FORM 2 REVISED.pdf22 Jan 2026
Withdrawal Update Form 3File: FORM 3_compressed (3).pdf22 Jan 2026
Withdrawal Update Form 1File: FORM1.pdf26 Nov 2025
Withdrawal Update Form 1File: FORM1.pdf26 Nov 2025
Withdrawal Update Form 2File: FORM2.pdf26 Nov 2025
Withdrawal Update Form 2File: FORM2.pdf26 Nov 2025
Withdrawal Update Form 3File: FORM 3.pdf26 Nov 2025
Withdrawal Update Form 3File: FORM 3.pdf26 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf5 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf5 Sep 2025
Withdrawal Update Form 3File: FORM 3_compressed.pdf5 Sep 2025
Copy of the legal title reportFile: title with ferfar_compressed.pdf13 May 2025
Proforma of Agreement for saleFile: AFS building No 1 Final.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed - converted.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: FORM 3_compressed - converted.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3 .pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Bldg No.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold_unsold_Booked .pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Architect Certificate dated 22072024 .pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Building No 1 A B Wing 15072024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Building No 1 A B Wing 15072024.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 18072024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate dtd 15072024.pdf19 Jul 2024
Proforma of Agreement for saleFile: Draft Agreement For Sale.pdf24 Jun 2024
Building plan approvalFile: Typical- Refuge Flr-Bldg 1.pdf24 May 2024
Building plan approvalFile: Ground -1st Flr-Bldg 1.pdf24 May 2024
Building plan approvalFile: Cross Sec 22nd Floor-Terrace Flr-Bldg 1.pdf24 May 2024
Building plan approvalFile: Typical-Refuge Flr-building 1_compressed.pdf24 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Ground -1st Flr-Bldg 1.pdf24 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Cross Sec 22nd Floor-Terrace Flr-Bldg 1.pdf24 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Typical-Refuge Flr-building 1_compressed.pdf24 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Typical- Refuge Flr-Bldg 1.pdf24 May 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Arch Cert-Shripal Sattva.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engg Cert - Shripa Sattva.pdf24 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Shripal Sattva.pdf24 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf6 Feb 2024
Details of encumbrances concerned to FinanceFile: RERA Encumbrance Letter.pdf10 Jan 2024
Details of encumbrances concerned to LegalFile: RERA Encumbrance Letter.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA UPLOAD.pdf4 Aug 2023
Building plan approvalFile: Bldg 1AB-(2) Podium 1.pdf24 Jul 2023
Building plan approvalFile: Bldg 1AB-(3) Podium 2.pdf24 Jul 2023
Building plan approvalFile: Bldg 1AB-(4) Typical Flr Plan.pdf24 Jul 2023
Building plan approvalFile: Bldg 1AB-(5) Refuge.pdf24 Jul 2023
Building plan approvalFile: Bldg 1AB-(6) Elevation.pdf24 Jul 2023
Building plan approvalFile: Bldg 1AB-(7) Terrece Flr.pdf24 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(2) Podium 1.pdf24 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(3) Podium 2.pdf24 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(4) Typical Flr Plan.pdf24 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(5) Refuge.pdf24 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(6) Elevation.pdf24 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(7) Terrece Flr.pdf24 Jul 2023
Layout approvalFile: Layout Plan.pdf19 Jul 2023
Building plan approvalFile: Bldg 1AB-(1) Grd Flr.pdf19 Jul 2023
Building plan approvalFile: RDP CC UPLOAD.pdf19 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf19 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Bldg 1AB-(1) Grd Flr.pdf19 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: RDP CC UPLOAD.pdf19 Jul 2023
Declaration about Commencement CertificateFile: Declaration CC revised Compressed.pdf19 Jul 2023
Declaration about Commencement CertificateFile: Declaration for Area and Phase.pdf19 Jul 2023
Details of encumbrances concerned to FinanceFile: Declaration - Details of encumbrances concern to financial.pdf9 Jun 2023
Details of encumbrances concerned to LegalFile: Declaration - Details of encumbrances concern to financial.pdf9 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf9 Jun 2023

How this compares with Palghar

72%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRIPAL SATTVA - BLDG. 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHOVALI3,200+ in Palghar

2 kmSHRIPAL SATTVA - BLDG. 1Completed 38Lapsed / revoked 17Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 95 registered projects within 2 km.

Builder: SHRIPAL SATTVA LLP

SHRIPAL SATTVA LLP has 2 registrations on MahaRERA, including SHRIPAL SATTVA - BLDG. 1 and SHRIPAL SATTVA BLDG. 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHRIPAL SATTVA - BLDG. 1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRIPAL SATTVA - BLDG. 1?

The registered promoter entity is SHRIPAL SATTVA LLP, an others as per the filing. Its GSTIN 27AALFJ3190K1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRIPAL SATTVA - BLDG. 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRIPAL SATTVA - BLDG. 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRIPAL SATTVA - BLDG. 1?

The professionals named in the filing: Architect: MEGHA URBANSCAPES; Engineer: COMPUTER HELP STRUCTURAL ENGINNER AND SOFTWARE DEVLEOPES; Engineer: Santosh Futak; Engineer: FOUNTAINHEAD ENGINEERS CIVIL & STRUCTUAL CONSULTANTS; Chartered Accountant: S B JAIN AND ASSOCIATES; Chartered Accountant: SDK & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRIPAL SATTVA - BLDG. 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRIPAL SATTVA - BLDG. 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRIPAL SATTVA - BLDG. 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.