Home / Browse projects / Pune, Maharashtra / Kumar Prospera - A1 and A2

Completed No litigation declared Residential / Group Housing project

Kumar Prospera - A1 and A2

By Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV

RG-MH-84873 · RERA P52100014951 · Last updated on MahaRERA portal: 7 Jun 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Feb 2023Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Kumar Prospera - A1 and A2 is a Residential / Group Housing project by Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV in Pune, Maharashtra, registered with MahaRERA as P52100014951 on 15 Jan 2018. The registration is recorded completed; possession was promised by 9 Feb 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKumar Prospera - A1 and A2
  • TypeResidential / Group Housing
  • Location
    • Hadapsar - Mundhwa Road
    • Magarpatta
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014951
  • ReraGenie IDRG-MH-84873

Builder

  • NameKumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV
  • Entity typeOthers
  • DirectorsManish Vimalkumar Jain, Rajiv Shyamlal Khiani, Bhavinkumar Nagraj Jain
  • Named personsM/s Kumar Company, Smt Pushpa Vimalkumar Jain, Manish Vimalkumar Jain, Mr. Rajas Vimalkumar Jain, Mr. Ameya Inderkumar Jain, Ms. Apurva Inderkumar Jain, Mrs. Rashmi Ritesh Chandalia ( Jain), Smt. Ranjana Inderkumar Jain, Mr. Kewalkumar Kesarimal Jain, M/S Kumar Agro Products Pvt. Ltd.
  • Other registrations3 more →
  • Completed3 of 4

Key dates

this monthRegisteredJan 2018PromisedFeb 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jan 2018
  • Promised completion9 Feb 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA210000
A2NA210000
Club HouseNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 7 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

A1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Club House100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed228

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots228
Closed/Covered146
Open Space82
BuildingClosed/CoveredOpen SpaceTotal
A17341114
A27341114

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,189 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI14279.26
Proposed, not sanctioned14,278 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKP Housing Society, Generel Thimayya Road, East Street, Camp, Pune - 411001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJagadish P Deshpande
EngineerSamir Patil
Chartered AccountantSupriya Abhijit Mundada
Chartered AccountantRSVA & Co
PartnerRole in project
Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV-

Litigation declared1

CaseCourtStatus
325/2011Civil Court Senior DivisionPending for Hearing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12604060Shahu Soudagar BhangeKumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV30/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Feb 2023

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: 230220_Prospera - A1 and A2.pdf7 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: 230218_Form 4_Arch Certificate.pdf13 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2330218_A1 A2_Completion Certificate.pdf18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5).pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 12_Kumar Prospera - A1 and A2.pdf12 Oct 2022
Disclosure of sold/ booked inventoryFile: 2_Kumar Prospera - A1 and A2_Disclosure of Sold Inventory.pdf2 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg certificate.pdf22 Jan 2022
Disclosure of sold/ booked inventoryFile: 2_Kumar Prospera - A1 and A2_Disclosure of Sold Inventory.pdf22 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf8 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf8 Oct 2021
Certificates of CA (Form 3)File: 3_CA Certificate_compressed.pdf8 Oct 2021
Declaration about Commencement CertificateFile: 13_Kumar Prospera - A1 and A2.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Prospera - A1 and A2.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 12_Kumar Prospera - A1 A2.pdf11 Mar 2021
Copy of the legal title reportFile: 200624_Continuation Title Opinion_compressed.pdf14 Sep 2020
Proforma of Allotment letterFile: 200909_Agreement for Sale_R4.pdf14 Sep 2020
Layout approvalFile: 12_200318_Sheet 1 of 5_Layout.pdf18 Mar 2020
Building plan approvalFile: 12_200318_Sheet 2 of 5_Odd Floor Plan_A1 A2.pdf18 Mar 2020
Building plan approvalFile: 12_200318_Sheet 3 of 5_Even Floor Plan_A1 A2.pdf18 Mar 2020
Building plan approvalFile: 12_200318_Sheet 4 of 5_Refuge Floor Plan_A1 A2.pdf18 Mar 2020
Copy of Layout Approval (in case of layout)File: 12_200318_Sheet 1 of 5_Layout.pdf18 Mar 2020
Building Plan Approval (IOD)File: 12_200318_Sheet 2 of 5_Odd Floor Plan_A1 A2.pdf18 Mar 2020
Building Plan Approval (IOD)File: 12_200318_Sheet 3 of 5_Even Floor Plan_A1 A2.pdf18 Mar 2020
Building Plan Approval (IOD)File: 12_200318_Sheet 4 of 5_Refuge Floor Plan_A1 A2.pdf18 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: 12_200318_Commencement Certificate.pdf18 Mar 2020
Declaration in FORM BFile: 11_191224_Form B_Declaration_R1.pdf24 Dec 2019
Layout approvalFile: 6_191210_Sheet 1 of 5_Layout.pdf10 Dec 2019
Layout approvalFile: 7_191210_Sheet 1 of 1_Full Potential Layout.pdf10 Dec 2019
Building plan approvalFile: 6_191210_Sheet 2 of 5_Floor Plan_A1 A2.pdf10 Dec 2019
Building plan approvalFile: 6_191210_Sheet 3 of 5_Floor Plan_A1 A2.pdf10 Dec 2019
Building plan approvalFile: 6_191210_Sheet 4 of 5_Floor Plan_A1 A2.pdf10 Dec 2019
Copy of the legal title reportFile: 10_191210_Legal Title Report_3.pdf10 Dec 2019
Copy of Layout Approval (in case of layout)File: 6_191210_Sheet 1 of 5_Layout.pdf10 Dec 2019
Copy of Layout Approval (in case of layout)File: 7_191210_Sheet 1 of 1_Full Potential Layout.pdf10 Dec 2019
Building Plan Approval (IOD)File: 6_191210_Sheet 2 of 5_Floor Plan_A1 A2.pdf10 Dec 2019
Building Plan Approval (IOD)File: 6_191210_Sheet 3 of 5_Floor Plan_A1 A2.pdf10 Dec 2019
Building Plan Approval (IOD)File: 6_191210_Sheet 4 of 5_Floor Plan_A1 A2.pdf10 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: 6_191210_Commencement Certificate.pdf10 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: 7_191210_Commencement Certificate.pdf10 Dec 2019
Proforma of Allotment letterFile: 6_191210_A1 A2_Agreement for Sale_R3.pdf10 Dec 2019
Certificates of CA (Form 5)File: 4_190928_Form 5_Annual Audit Report_compressed.pdf28 Sep 2019
Certificates of CA (Form 5)File: 181017_Form 5_Annual Report by CA.pdf17 Oct 2018
Copy of the legal title reportFile: 2_Prospera_Legal Title Report_2.pdf3 Jul 2018
Proforma of Allotment letterFile: 5_Prospera_Revised Allotment and Agreement for Sale_R2.pdf3 Jul 2018
Proforma of Allotment letterFile: 5_Prospera_Revised Allotment and Agreement for Sale_R2.pdf3 Jul 2018
Proforma of Allotment letterFile: 5_Prospera_Revised Allotment and Agreement for sale.pdf11 Jun 2018
Building plan approvalFile: 13_Building Plans2.pdf8 Jan 2018
Layout approvalFile: 4_Prospera_Sanctioned Layout.pdf8 Jan 2018
Copy of the legal title reportFile: 2_Prospera_Legal Title Report.pdf8 Jan 2018
Details of encumbrancesFile: 3_Prospera_Encumbrances.pdf8 Jan 2018
Copy of Layout Approval (in case of layout)File: 4_Prospera_Sanctioned Layout.pdf8 Jan 2018
Building Plan Approval (IOD)File: 13_Building Plans2.pdf8 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: 12_Commencement Certificate.pdf8 Jan 2018
Declaration in FORM BFile: 6_ Prospera_Form B.pdf8 Jan 2018
Proforma of Allotment letterFile: 5_Prospera_Allotment Letter and AGreement for Sale.pdf8 Jan 2018
Building plan approvalFile: 13_Building Plans1.pdf4 Jan 2018
PAN CardFile: 1_Pan Card.PDF4 Jan 2018
Building Plan Approval (IOD)File: 13_Building Plans1.pdf4 Jan 2018
Certificates of CA (Form 3)File: 8_CA Certificate.pdf4 Jan 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kumar Prospera - A1 and A2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Magarpatta13,700+ in Pune

2 kmKumar Prospera - A1 and Completed 71Lapsed / revoked 22Other 90Dot size: filed unitsN

Filed coordinates, straight-line distance. 183 registered projects within 2 km.

Builder: Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV

Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV has 4 registrations on MahaRERA, including Kumar Prospera - A1 and A2 and Kumar Prospera - A3, A4 and A5. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kumar Prospera - A1 and A2 is delayed beyond 9 Feb 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kumar Prospera - A1 and A2?

The registered promoter entity is Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kumar Prospera - A1 and A2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kumar Prospera - A1 and A2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kumar Prospera - A1 and A2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kumar Prospera - A1 and A2?

The professionals named in the filing: Architect: Jagadish P Deshpande; Engineer: Samir Patil; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: RSVA & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kumar Prospera - A1 and A2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kumar Prospera - A1 and A2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kumar Prospera - A1 and A2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.