Home / Browse projects / Pune, Maharashtra / Kumar Pratham - D E G

Completed No litigation declared Residential / Group Housing project

Kumar Pratham - D E G

By Kumar Agro Products Pvt Ltd

RG-MH-22457 · RERA P52100031354 · Last updated on MahaRERA portal: 18 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
28 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 90%
27 of 132Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Kumar Pratham - D E G is a Residential / Group Housing project by Kumar Agro Products Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100031354 on 23 Oct 2021. The registration is recorded completed; possession was promised by 30 Jun 2025. 105 of the 132 units on this registration are recorded sold or booked, and 28 of 33 construction stages are filed complete.

At a glance

Project

  • NameKumar Pratham - D E G
  • TypeResidential / Group Housing
  • Location
    • Moshi Road
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031354
  • ReraGenie IDRG-MH-22457

Builder

  • NameKumar Agro Products Pvt Ltd
  • Entity typeCompany
  • CINU45100PN1991PTC064416
  • DirectorsKewalkumar Kesarimal Jain, Ameya Inderkumar Jain, Hitesh Jain
  • Other registrations8 more →
  • Completed8 of 9
  • Declared earlier projects9 →

Key dates

this monthRegisteredOct 2021PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Oct 2021
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed97 files

Current status

80%105 of 132 units booked

Figures as on 18 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DNA131144044
ENA131144044
GNA131144044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 90%.

D99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
E81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
G99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 18 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes75%
Street LightingYes75%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes75%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes75%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed153

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots153
Closed/Covered153
BuildingClosed/CoveredTotal
D6565
E4444
G4444

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,328 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Oct 2024

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI15567.98
Proposed, not sanctioned15,568 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEast Street Camp Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas Achalkar
EngineerDharitri Roy
Chartered AccountantSupriya Abhijit Mundada
Chartered AccountantGMKS & Co Chartered Accountant
PartnerRole in project
Kumar Agro Products Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: 250331_OC_D, E_merged.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form 2A.pdf19 Apr 2025
Proforma of Agreement for saleFile: 250217_Pratham D E G_Agreement for Sale_R2.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: 5_Disclosure of Sold Inventory.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: 6_Disclosure of Sold Inventory.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_Signed.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_Signed.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Ar Certificate.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Pratham DEG_compressed.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Jul 2024
Copy of the legal title reportFile: 240607_Continuation Title opinion.pdf25 Jun 2024
Details of encumbrancesFile: 640624_Encumbrance Certificate_Finance.pdf24 Jun 2024
Copy of the legal title reportFile: 240607_Continuation Title opinion.pdf12 Jun 2024
Disclosure of sold/ booked inventoryFile: 6_Disclosure of sold inventory_R1.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5_Form 2A.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: 27_Kumar Pratham - D E G.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf20 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: 240313_Decl about Grievance Redressal Cell_R1.pdf13 Mar 2024
Home Buyer /Allottee Grievance Redressal CellFile: 240308_Decl about Grievance Redressal Cell.pdf8 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: 5_Disclosure of sold inventory.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: 27_Kumar Pratham - D E G.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 44_Kumar Pratham - D E G.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: 27_Kumar Pratham - D E G.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf19 Jul 2023
Declaration in FORM BFile: 230704_Form B_Declaration.pdf4 Jul 2023
Copy of the legal title reportFile: 230629_Legal Title Report.pdf29 Jun 2023
Details of encumbrancesFile: 230629_No Encumbrances_Finance_R1.pdf29 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: 25_Kumar Pratham - D E G.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf17 Jan 2023
Disclosure of sold/ booked inventoryFile: 25_Kumar Pratham - D E G.pdf13 Jan 2023
Disclosure of sold/ booked inventoryFile: 25_Kumar Pratham - D E G.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 44_Kumar Pratham - D E G.pdf13 Oct 2022
Disclosure of sold/ booked inventoryFile: 25_Kumar Pratham - D E G_Disclosure of Sold Inventory.pdf22 Jul 2022
PAN CardFile: 220721_Pan Card.PDF21 Jul 2022
Copy of the legal title reportFile: 220721_Legal Title Report.pdf21 Jul 2022
Declaration in FORM BFile: 220721_New Declaration Form B.pdf21 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 220721_New Architect Form 1.pdf21 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 220721_New Engineers Form 2.pdf21 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 220721_New CA Form 3.pdf21 Jul 2022
Proforma of Allotment letterFile: 220721_Allotment and Agreement.pdf21 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate_compressed.pdf18 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg Certificate.pdf18 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 5_Form 2A_Quality.pdf18 Apr 2022
Disclosure of sold/ booked inventoryFile: 25_Kumar Pratham - D E G_Disclosure of Sold Inventory.pdf18 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate.pdf18 Apr 2022
Disclosure of sold/ booked inventoryFile: 25_Kumar Pratham - D E G_Disclosure of Sold Inventory.pdf2 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Arch Certificate.pdf22 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engg certificate.pdf22 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_CA Certificate_compressed (1).pdf22 Jan 2022
Details of encumbrancesFile: 3_Encumbrance Certificate.pdf13 Oct 2021

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Kumar Pratham - A B C and ShopsP52100022486Moshi - Borhadewadi, Pune222Sep 2019CompletedFeb 2025Mar 2024
Peninsula CP52100028012Pashan, Pune44Jan 2021CompletedOct 2024Feb 2024
Kumar Pratham - F MhadaP52100049685Moshi, Pune53Feb 2023CompletedMar 2024Mar 2024
Priyadarshan - JP52100029119Jai Bhavani Nagar, Pune28Apr 2021CompletedJan 2024Late, Feb 2024
Princeville - A2, C2 and Conv Shop 2P52100018603Moshi, Pune93Nov 2018CompletedJun 2023Jun 2022
Princeville - B4 and B5P52100015685Borhadewadi, Pune92Mar 2018CompletedFeb 2022Jun 2021
Primus - AP52100004518Hadapsar Industrial Estate, Pune-Aug 2017CompletedDec 2021Registered original: Dec 2019Aug 2021
Picasso Phase IIP52100000104Sade Satra Nali, Hadapsar, Pune88Jul 2017CompletedDec 2019Sep 2018
Princeville - B3 and C1P52100000755Pimpri Chinchawad (M Corp.), Pune94Jul 2017CompletedMay 2019Mar 2019

How this compares with Pune

80%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kumar Pratham - D E G on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi13,700+ in Pune

2 kmKumar Pratham - D E GCompleted 80Lapsed / revoked 43Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 209 registered projects within 2 km.

Builder: Kumar Agro Products Pvt Ltd

Kumar Agro Products Pvt Ltd has 9 registrations on MahaRERA, including Princeville - A2, C2 and Conv Shop 2 and Kumar Pratham - A B C and Shops. Its filings disclose 9 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kumar Pratham - D E G is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kumar Pratham - D E G?

The registered promoter entity is Kumar Agro Products Pvt Ltd, a company as per the filing. Its CIN U45100PN1991PTC064416 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kumar Pratham - D E G?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kumar Pratham - D E G?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kumar Pratham - D E G?

The professionals named in the filing: Architect: Vikas Achalkar; Engineer: Dharitri Roy; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: GMKS & Co Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kumar Pratham - D E G?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kumar Pratham - D E G. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kumar Pratham - D E G to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.