Home / Browse projects / Pune, Maharashtra / KUMAR PARTH TOWER C1
KUMAR PARTH TOWER C1
By KUMAR & POTNIS CONSTRUCTIONS LLP
RG-MH-72006 · RERA P52100047987 · Last updated on MahaRERA portal: 23 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 305.00 crore secured on the land, in favour of PIRAMAL FINANCE LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KUMAR PARTH TOWER C1 is a Residential / Group Housing project by KUMAR & POTNIS CONSTRUCTIONS LLP in Pune, Maharashtra, registered with MahaRERA as P52100047987 on 7 Dec 2022. Possession is promised by 31 Dec 2027. 193 of the 193 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameKUMAR PARTH TOWER C1
- TypeResidential / Group Housing
- Location
- MUNMBAI BANGLORE HIGHWAY
- BANER
- Haveli
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047987
- ReraGenie IDRG-MH-72006
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Dec 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed183 files
Current status
Figures as on 23 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KUMAR PARTH TOWER C1 | NA | 30 | 25 | 193 | 0 | 193 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 49%.
KUMAR PARTH TOWER C1: 60% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 49% |
| Sanitary Fittings within the flats / premises | 1% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 11% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed193
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| MOHANNAGAR CO-OPERATIVE HOUSING SOCIETY LIMITED | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| KUMAR PARTH TOWER C1 | NA | Rs 71.25 cr | Rs 49.89 cr |
| - | NA | Rs 16.87 cr | Rs 5.03 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AVINASH NAWATHE |
| Architect | MR AVINASH NAWATHE |
| Engineer | BHAVANA G DHAS |
| Engineer | Mr Abhijeet Shekhar |
| Engineer | MR ABHIJEET SHEKAR |
| Chartered Accountant | SUPRIYA ABHIJIT MUNDADA |
| Chartered Accountant | MRS SUPRIYA ABHIJIT MUNDADA |
| Chartered Accountant | Shivraj Uttamrao Patil |
| Partner | Role in project |
|---|---|
| KUMAR & POTNIS CONSTRUCTIONS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Sep 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed183
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 183 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 K.Parth Towers C1 Bldg..PDF | 23 Apr 2026 |
| Withdrawal Update Form 2File: Parth C1 Engineering Certificate.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 KPCLLP Kumar Parth Tower C1.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Parth C1 Arch Certificate.PDF | 25 Mar 2026 |
| Withdrawal Update Form 2File: Parth C1 Engineers Certificate.pdf | 25 Mar 2026 |
| Withdrawal Update Form 3File: Kumar Parth Tower C1 CA Certificate_compressed.pdf | 25 Mar 2026 |
| Form 5 (FY 2022-2023)File: Form 5 - Parth Tower C1 - 2022-23.PDF | 8 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form 5 - Parth Tower C1 - 2023-24.pdf | 8 Jan 2026 |
| Form 5 (FY 2024-2025)File: KPCLLP Form-5 KPT-C1 .pdf | 8 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Certificate Kumar Parth Towers C1 Bldg.PDF | 9 Nov 2025 |
| Withdrawal Update Form 2File: Parth C1 Engineer Certificate.pdf | 9 Nov 2025 |
| Withdrawal Update Form 3File: Kumar Parth Tower C1.PDF | 9 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kumar Parth Towers C1 Bldg.PDF | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KPCLLP Parth Tower C1.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Parth C1 Engineer's Certificate.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: KUMAR PARTH TOWER C1.PDF | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 K Parth Towers C1 Bldg.PDF | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kumar Parth Tower C1.PDF | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Parth C1 Engineers Certificate.pdf | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: KUMAR PARTH TOWER - C1.PDF | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Kumar Parth Tower C1_compressed.pdf | 27 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 KPT C1 Bldg_.PDF | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Parth Tower C1.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Kumar Parth Tower C1.PDF | 20 Oct 2024 |
| PAN CardFile: KUMAR And POTNIS CONSTRUCTIONS LLP PAN.pdf | 30 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Parth Tower C1.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Parth Tower C1.pdf | 15 Jul 2024 |
| Other - TechnicalFile: Declaration - Final CC - Verification - Kumar Parth Tower C1.pdf | 10 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Declaration - Final CC - Verification - Kumar Parth Tower C1.pdf | 8 Jul 2024 |
| Other - TechnicalFile: Declaration - Final CC - Verification - Kumar Parth Tower C1.pdf | 8 Jul 2024 |
| Layout approvalFile: Layout.pdf | 18 Jun 2024 |
| Layout approvalFile: Layout 2.pdf | 18 Jun 2024 |
| Building plan approvalFile: Gr Flor and Basement.pdf | 18 Jun 2024 |
| Building plan approvalFile: P1 and P2 Floor 4.pdf | 18 Jun 2024 |
| Building plan approvalFile: P3 and P4 Floor 5.pdf | 18 Jun 2024 |
| Building plan approvalFile: C1 Bldg Floor Paln 6.pdf | 18 Jun 2024 |
| Building plan approvalFile: C1 Bldg Refuge Plan 7.pdf | 18 Jun 2024 |
| Building plan approvalFile: C1 Elevation 8.pdf | 18 Jun 2024 |
| Building plan approvalFile: C1 Elevation AA 9.pdf | 18 Jun 2024 |
| Building plan approvalFile: C1 Elevation BB 10.pdf | 18 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 18 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Layout 2.pdf | 18 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Gr Flor and Basement.pdf | 18 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: P1 and P2 Floor 4.pdf | 18 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: P3 and P4 Floor 5.pdf | 18 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: C1 Bldg Floor Paln 6.pdf | 18 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: C1 Bldg Refuge Plan 7.pdf | 18 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: C1 Elevation 8.pdf | 18 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: C1 Elevation AA 9.pdf | 18 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: C1 Elevation BB 10.pdf | 18 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 18 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2023-24 - Kumar Parth Tower C1 - P52100047987.pdf | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Parth Tower C1.pdf | 4 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Parth Tower C1 - 2023-24.pdf | 4 Jun 2024 |
| Proforma of Agreement for saleFile: Final Draft of C1 Building after Conveyance.pdf | 15 May 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation - New - AFS - Kumar Parth Tower C1.pdf | 15 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Parth Tower C1.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Parth Tower C 1.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Parth Tower C 1.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Kumar Parth Tower C 1.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Parth Tower C1.pdf | 8 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Parth Tower C1 - 22-23.PDF | 22 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.PDF | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Kumar Parth Tower C1.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Parth_C1_Engineer's Certificate.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Kumar Parth Tower C1.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sold Unsold Inventory - Kumar Parth Tower C1.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Parth Tower C1.pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - KPT C1.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - KPT C1.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Parth_C1_Engineer's Certificate.pdf | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - KPT C1.PDF | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Parth Tower C1 Latest_compressed.pdf | 8 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Parth Tower C1 Latest.PDF | 29 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: KPT C1 - Declaration Finance.pdf | 3 Aug 2023 |
| Details of encumbrances concerned to LegalFile: KPT C1 - Declaration Finance.pdf | 3 Aug 2023 |
| Declaration about Commencement CertificateFile: KPT C1 - Form D.PDF | 3 Aug 2023 |
| Declaration in FORM BFile: KPT C1 - Declaration cum Undertaking.pdf | 3 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kumar Parth Tower C1.pdf | 3 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: KPT C1 - Self Declaration transfer of bank account.pdf | 3 Aug 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| KUMAR PARTH TOWER C 2P52100052945 | BANER, Pune | 191 | Oct 2023 | Ongoing | Mar 2028 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 183 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KUMAR PARTH TOWER C1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BANER13,700+ in Pune
Filed coordinates, straight-line distance. 302 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: KUMAR & POTNIS CONSTRUCTIONS LLP
KUMAR & POTNIS CONSTRUCTIONS LLP has 3 registrations on MahaRERA, including KUMAR PARTH TOWER C1 and KUMAR PARTH TOWER C 2. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if KUMAR PARTH TOWER C1 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KUMAR PARTH TOWER C1?
The registered promoter entity is KUMAR & POTNIS CONSTRUCTIONS LLP, a partnership as per the filing. Its GSTIN 27AAAFK6674L1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KUMAR PARTH TOWER C1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KUMAR PARTH TOWER C1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KUMAR PARTH TOWER C1?
The professionals named in the filing: Architect: AVINASH NAWATHE; Architect: MR AVINASH NAWATHE; Engineer: BHAVANA G DHAS; Engineer: Mr Abhijeet Shekhar; Engineer: MR ABHIJEET SHEKAR; Chartered Accountant: SUPRIYA ABHIJIT MUNDADA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KUMAR PARTH TOWER C1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback