Home / Browse projects / Thane, Maharashtra / KULSWAMINI

Completed No litigation declared Others project

KULSWAMINI

By SHREE SAI BUILDERS

RG-MH-66383 · RERA P51700048200 · Last updated on MahaRERA portal: 12 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
25 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

KULSWAMINI is a Others project by SHREE SAI BUILDERS in Thane, Maharashtra, registered with MahaRERA as P51700048200 on 15 Dec 2022. The registration is recorded completed; possession was promised by 31 Dec 2026. 33 of the 58 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NameKULSWAMINI
  • TypeOthers
  • Location
    • SHIRGAON
    • BADLAPUR EAST
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700048200
  • ReraGenie IDRG-MH-66383

Builder

  • NameSHREE SAI BUILDERS
  • Entity typePartnership
  • PartnersSURJEET J PRAJAPATI, TEJAS VIJAY MANDAVKAR, Rupesh Balu Gaikwad, Raju Mandavkar
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2022PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Dec 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed98 files

Current status

57%33 of 58 units booked
100.0%Work done, per cost certificate

Figures as on 12 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KULSWAMINI A WINGNA77211031
KULSWAMINI B WINGNA8727027

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

KULSWAMINI A WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
KULSWAMINI B WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Open Space70
BuildingOpen SpaceTotal
KULSWAMINI A WING1414
KULSWAMINI B WING5656

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,033 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Feb 2026
LandownerVillageDistrict
SURENDRA VAMAN SARAFDOMBIVLIThane
KISHOR WAMAN SARAFBadlapur (M Cl)Thane
HOWARD WALTER SYMSSBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKBMC
Permissible FSI2520.75
Proposed, not sanctioned2,521 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCOMMERCIAL PREMISES , A WING,MANDAVAKAR COMPLEX,SANEWADI,BADLAPUR WEST
Estimated costRs 13.04 cr
Cost incurredRs 13.04 cr
Work done100.0%
BuildingWingEstimatedIncurred
KULSWAMINI A WINGNARs 6.35 crRs 6.35 cr
KULSWAMINI B WINGNARs 6.35 crRs 6.35 cr
-NARs 33.44 lakhRs 33.44 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwastik Creation
EngineerAtul Kudtarkar & Associates
Chartered AccountantNILESH A PATKI & ASSOCIATES
Chartered AccountantRaviraj Dange
PartnerRole in project
SHREE SAI BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Apr 25.pdf12 Mar 2026
Withdrawal Update Form 1File: FORM 1 Apr 25.pdf12 Mar 2026
Withdrawal Update Form 1File: FORM 1 Apr 25.pdf12 Mar 2026
Withdrawal Update Form 2File: FORM-2 Apr 25.pdf12 Mar 2026
Withdrawal Update Form 2File: FORM-2 Apr 25.pdf12 Mar 2026
Withdrawal Update Form 2File: FORM-2 Apr 25.pdf12 Mar 2026
Withdrawal Update Form 3File: FORM 3 Apr 25.pdf12 Mar 2026
Withdrawal Update Form 3File: FORM 3 Apr 25.pdf12 Mar 2026
Withdrawal Update Form 3File: FORM 3 Apr 25.pdf12 Mar 2026
Occupational CertificateFile: Occupancy Certificate 30-04-25.pdf12 Mar 2026
Withdrawal Update Form 1File: FORM 1 Apr 25.pdf14 Feb 2026
Withdrawal Update Form 1File: FORM 1 Apr 25.pdf14 Feb 2026
Withdrawal Update Form 2File: FORM-2 Apr 25.pdf14 Feb 2026
Withdrawal Update Form 2File: FORM-2 Apr 25.pdf14 Feb 2026
Withdrawal Update Form 3File: FORM 3 Apr 25.pdf14 Feb 2026
Withdrawal Update Form 3File: FORM 3 Apr 25.pdf14 Feb 2026
Withdrawal Update Form 1File: FORM 1 Apr 25.pdf15 Jan 2026
Withdrawal Update Form 1File: FORM 1 Apr 25.pdf15 Jan 2026
Withdrawal Update Form 1File: FORM 1 Apr 25.pdf15 Jan 2026
Withdrawal Update Form 2File: FORM-2 Apr 25.pdf15 Jan 2026
Withdrawal Update Form 2File: FORM-2 Apr 25.pdf15 Jan 2026
Withdrawal Update Form 2File: FORM-2 Apr 25.pdf15 Jan 2026
Withdrawal Update Form 3File: FORM 3 Apr 25.pdf15 Jan 2026
Withdrawal Update Form 3File: FORM 3 Apr 25.pdf15 Jan 2026
Withdrawal Update Form 3File: FORM 3 Apr 25.pdf15 Jan 2026
Withdrawal Update Form 1File: FORM 1 Apr 25.pdf14 Jan 2026
Withdrawal Update Form 2File: FORM-2 Apr 25.pdf14 Jan 2026
Withdrawal Update Form 3File: FORM 3 Apr 25.pdf14 Jan 2026
Form 1File: Form 1 ARCHITEC CERTIFICATE MAR 25.pdf27 Sep 2025
Form 2File: Form 2 ENGINEER CERTIFICATE MAR 25.pdf27 Sep 2025
Form 3File: FORM 3 MAR 25.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold & Unsold Mar 25.pdf27 Sep 2025
Form 5 (FY 2024-2025)File: FORM 5 2024-25.pdf25 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold And Unsold Inventory.pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold And Unsold Inventory -DEC 24.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 compressed.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 KULSWAMINI 01 JULY 23.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 KULSWAMINI 01 OCT 23.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf28 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf28 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf28 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVNETORY.pdf28 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf28 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Shree Sai Builders .pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Mar 23.pdf14 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Mar 23.pdf14 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Mar 23.pdf14 Jun 2023
Building plan approvalFile: BLUE PRINT-NEW_compressed (2).pdf3 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT-NEW_compressed (2).pdf3 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2-Archtect's Certificate_compressed.pdf17 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 22.pdf17 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3-Engineers' Certificate.pdf17 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 22.pdf17 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf17 Mar 2023
Layout approvalFile: 14-BLUE PRINT3.pdf21 Nov 2022
Building plan approvalFile: 14-BLUE PRINT3.pdf21 Nov 2022
Copy of Layout Approval (in case of layout)File: 14-BLUE PRINT3.pdf21 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: 14-BLUE PRINT3.pdf21 Nov 2022
Proforma of Agreement for saleFile: RERA Agreement-15-11-2022.pdf16 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Points Agreement to sales.pdf16 Nov 2022

How this compares with Thane

57%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KULSWAMINI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BADLAPUR EAST7,600+ in Thane

2 kmKULSWAMINICompleted 149Lapsed / revoked 53Other 107Dot size: filed unitsN

Filed coordinates, straight-line distance. 309 registered projects within 2 km.

Builder: SHREE SAI BUILDERS

SHREE SAI BUILDERS has 5 registrations on MahaRERA, including SAI SHRADHA and Shree Sai Avenue. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if KULSWAMINI is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KULSWAMINI?

The registered promoter entity is SHREE SAI BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KULSWAMINI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KULSWAMINI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KULSWAMINI?

The professionals named in the filing: Architect: Swastik Creation; Engineer: Atul Kudtarkar & Associates; Chartered Accountant: NILESH A PATKI & ASSOCIATES; Chartered Accountant: Raviraj Dange. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KULSWAMINI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KULSWAMINI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KULSWAMINI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.