Registered No litigation declared Others project

KUBER HEIGHTS

By UNITED CONSTRUCTION CO.

RG-MH-21765 · RERA P51800023657 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 36 months from the original
12 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
28 of 136Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 162 documents Report an error

KUBER HEIGHTS is a Others project by UNITED CONSTRUCTION CO. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800023657 on 24 Dec 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 36 months from the original filing. 108 of the 136 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NameKUBER HEIGHTS
  • TypeOthers
  • Location
    • VILLAGE OF MULUND EAST
    • PATILWADI
    • NEAR HARIOM NAGAR
    • MULUND EAST
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400081
  • Pincode400081
  • RERA no.P51800023657
  • ReraGenie IDRG-MH-21765

Builder

  • NameUNITED CONSTRUCTION CO.
  • Entity typePartnership
  • PartnersNANDKUMAR SEOOMAL TILWANI, NITIN SACHIDANAND MIRWANKAR, RONEY PRAKASH TILWANI, Ajay Kalyan Kedare, Gordon Monteiro, Jason James Samuel
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2019First promiseDec 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Dec 2019
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2024)
  • Buildings2 building records
  • Documents filed162 files

Current status

79%108 of 136 units booked
58.7%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA15151150115
ASHTAVINAYAKCHS LTD WING B REHAB BUILDINGNA202021021

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

WING A63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ASHTAVINAYAKCHS LTD WING B REHAB BUILDING80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered75
BuildingClosed/CoveredTotal
WING A5353
ASHTAVINAYAKCHS LTD WING B REHAB BUILDING2222

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,806 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI10714.15
Proposed, not sanctioned8,789 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEMERALD PLAZA,G-6,BLOCK -4,HIRANANDANI MEADOWS,GLADYS ALWARYS ROAD,,OFF POKHRAN ROAD NO-2,VASANT VIHAR
Estimated costRs 40.00 cr
Cost incurredRs 23.49 cr
Work done58.73%
BuildingWingEstimatedIncurred
WING ANARs 25.00 crRs 9.49 cr
ASHTAVINAYAKCHS LTD WING B REHAB BUILDINGNARs 15.00 crRs 14.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Crest
EngineerJay Kamble
Chartered AccountantShripati Gandhi Choudhari & Co.
Chartered AccountantT M R & Associates LLP
PartnerRole in project
UNITED CONSTRUCTION CO.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013724Dec 2024 → Dec 2025

Reason as filed by the promoterWe are making the application to Extend the completion date of our above project to 30/12/2025 as there is shortage of material and labour further there is financial Crunch also. Request you to Extend the date as early as possible and We are applying for Extension for the First time and hence 51% consent is not required.

EXT51800025094Dec 2024 → Dec 2027

Reason as filed by the promoterKuber Heights Project is a SRA Project and project work was stuck for a year and so because of financial crisis and now we have revamped the project and have started the construction activity from last one month and Financial planning is also done for next 6-8 months so that construction activity is not hampered and after that we are hoping that revenue from new sale will start flowing. Project Work Status and Further Course of Action :- Wing-B i.e., ASHTAVINAYAKCHS LTD WING B REHAB BUILDING has 21 flats for sale and current status of Rehab wing is that 10th slab is casted out of 21 slabs and

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed162

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 162 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE.pdf12 May 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 Kuber Heights Mar 26.pdf12 May 2026
Withdrawal Update Form 1File: Form 1 - Kuber Heights - Dec 25.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2 - Kuber Heights - Dec 25.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3 - Kuber Heights - Dec 25_compressed.pdf4 Feb 2026
Withdrawal Update Form 1File: Form 1 - Sept 25.pdf24 Dec 2025
Withdrawal Update Form 2File: Form 2 - Sept 25.pdf24 Dec 2025
Withdrawal Update Form 3File: Form 3 - Sept 25_compressed.pdf24 Dec 2025
Withdrawal Update Form 1File: Architect Certificate.pdf12 Sep 2025
Withdrawal Update Form 2File: Engineers Certificate (1).pdf12 Sep 2025
Withdrawal Update Form 3File: Form 3 - Kuber Heights.pdf12 Sep 2025
Form 1File: Architect Certificate.pdf19 Jul 2025
Form 2File: Form 2 - Kuber Heights_compressed.pdf19 Jul 2025
Form 3File: CA Certificate.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - March 25 - Kuber.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Dec 24.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure.pdf21 Jan 2025
Proforma of Allotment letterFile: Allotment Letter.pdf13 Dec 2024
Declaration in FORM BFile: Form B to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-22112024 to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-02072024 to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 02042024 to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -04012024 to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 01102023 to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 05072023 to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31122022 to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 050722 to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 08042022 to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 22012022 to be uploaded.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 05042023 to be uploaded.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-25042022 pages to be uploaded.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Kuber heights 300924 Final.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-12042023 to be uploaded.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-08072022 to be uploaded.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-05022022 to be uploaded.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 5 FY 2023-24 to be uploaded.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-14112024 to be uploaded (11).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-05072024 to be uploaded (10).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-03042024 to be uploaded (9).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-09012024 to be uploaded (8).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-05102023 to be uploaded (7).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-07072022 to be uploaded (3).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-07072023 to be uploaded (6).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 04012023 to be uploaded (4).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-07072022 to be uploaded (3).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 11042022 to be uploaded (2).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -25012022 to be uploaded (1).pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-10042023 to be uploaded (5).pdf13 Dec 2024
CERSAI detailsFile: CERSAI to be uploaded.pdf13 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaration-Done.pdf13 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf13 Dec 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION SHEET of AFS.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22 to be uploaded.pdf13 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021-22 to be uploaded.pdf13 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf13 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23 to be uploaded.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2021-22 to be uploaded.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23 to be uploaded.pdf13 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24 to be uploaded.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Kuber heights 300924 Final.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate_Compressed.pdf28 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Form-3 Kuber heights 300924 Final.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Kuber Heights.pdf26 Nov 2024
Other - TechnicalFile: Partnership Deed COMPRESSES.pdf26 Nov 2024
Declaration in FORM BFile: Form-B Kuber Heights.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold unsold 30092024.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold unsold 15112024.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Kuber Heights 23-24.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 300624-pages merge.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold unsold 31122023.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 310324.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_compressed.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure sold books inventory 31032022.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Kuber Heights 30062024.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf12 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Kuber Heights 31032023_compressed.pdf15 Apr 2024

How this compares with Mumbai Suburban

79%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KUBER HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR HARIOM NAGAR, MULUND EAST6,700+ in Mumbai Suburban

Builder: UNITED CONSTRUCTION CO.

UNITED CONSTRUCTION CO has 2 registrations on MahaRERA, including RAHMAT ARCADE and KUBER HEIGHTS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KUBER HEIGHTS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KUBER HEIGHTS?

The registered promoter entity is UNITED CONSTRUCTION CO., a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KUBER HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KUBER HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KUBER HEIGHTS?

The professionals named in the filing: Architect: Design Crest; Engineer: Jay Kamble; Chartered Accountant: Shripati Gandhi Choudhari & Co.; Chartered Accountant: T M R & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KUBER HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KUBER HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KUBER HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.