Home / Browse projects / Ratnagiri, Maharashtra / KSP ALEXA - wing B
KSP ALEXA - wing B
RG-MH-12752 · RERA P52800022354 · Last updated on MahaRERA portal: 27 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KSP ALEXA - wing B is a Others project by KRISHNAT SHAHU POWAR in Ratnagiri, Maharashtra, registered with MahaRERA as P52800022354 on 16 Sep 2019. Possession was promised by 26 Dec 2024 and is now 22 months past that date.
At a glance
Project
- NameKSP ALEXA - wing B
- TypeOthers
- Location
- Ratnagiri Kolhapur Road
- Maruti Mandir
- Zadgaon CT
- Ratnagiri
- 415612
- Pincode415612
- RERA no.P52800022354
- ReraGenie IDRG-MH-12752
Builder
- NameKRISHNAT SHAHU POWAR
- Entity typeIndividual
- Other registrations5 more →
- Completed2 of 6
- No longer live4 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on16 Sep 2019
- Promised completion26 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed82 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B - WING | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.
B - WING: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities16
As on 27 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 90% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Land Development | Yes | 70% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Krishnat Shahu Powar | Nachane (CT) | Ratnagiri |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Geetanjali V Mote |
| Engineer | Sandeep S Shetye |
| Chartered Accountant | Prasad S Acharekar & Company |
| Chartered Accountant | Pawan Landage & Company |
| Chartered Accountant | Dhanashri Karmarkar & Associates |
| Chartered Accountant | Kedar Karambelkar & Company |
| Partner | Role in project |
|---|---|
| KRISHNAT SHAHU POWAR | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Sep 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Dec 2024
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B wing.pdf | 27 Dec 2024 |
| Other - LegalFile: From 4 B Wing.pdf | 27 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 30112024 B W Sold Inventory.pdf | 27 Dec 2024 |
| Layout approvalFile: Sheet No 01 05092024.pdf | 24 Dec 2024 |
| Layout approvalFile: Sheet No 02 05092024.pdf | 24 Dec 2024 |
| Layout approvalFile: Sheet No 03 05092024.pdf | 24 Dec 2024 |
| Layout approvalFile: Sheet No 04 05092024.pdf | 24 Dec 2024 |
| Layout approvalFile: Sheet No 05 05092024.pdf | 24 Dec 2024 |
| Layout approvalFile: Sheet No 06 05092024.pdf | 24 Dec 2024 |
| Layout approvalFile: Sheet No 07 05092024.pdf | 24 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Sheet No 02 05092024.pdf | 24 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Sheet No 03 05092024.pdf | 24 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Sheet No 04 05092024.pdf | 24 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Sheet No 05 05092024.pdf | 24 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Sheet No 06 05092024.pdf | 24 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Sheet No 07 05092024.pdf | 24 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Sheet No 01 05092024.pdf | 24 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: From 4 B Wing.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B W 31032024.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B W 30112024.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B W 30092024.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B W 30062024.pdf | 24 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 B wing 22-23_Signed.pdf | 24 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 B wing 1 23-24_Signed.pdf | 24 Dec 2024 |
| Building plan approvalFile: BUILDING PERMISSION.pdf | 13 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: N A Order New.pdf | 13 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PERMISSION.pdf | 13 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's certificate B wing.pdf | 12 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf | 15 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 02.pdf | 15 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory.pdf | 15 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 B WING upload.pdf | 15 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3B310320.pdf | 16 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3B310321.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5B1920.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5B2122.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1B31320.pdf | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1B31321.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2B31320.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2B31321.pdf | 15 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: B W (1).pdf | 11 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 B Wing.pdf | 11 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No - 03 B W.pdf | 31 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form NO - 1 B Wing.pdf | 19 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No - 2 BW 01.pdf | 19 May 2022 |
| Disclosure of sold/ booked inventoryFile: B 01.pdf | 19 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form No 01 - B W - 1-converted_compressed.pdf | 14 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: B 1-converted_compressed.pdf | 14 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: alexa b wing form 3_compressed.pdf | 14 Apr 2022 |
| Declaration about Commencement CertificateFile: 1.pdf | 15 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2.pdf | 15 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 7.pdf | 15 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: 5.pdf | 15 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 10.pdf | 15 Aug 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B W 01 20.pdf | 15 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No - 01 B Wing.pdf | 13 Oct 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate B Wing.pdf | 9 Oct 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: chartered accountant's certificate B Wing.pdf | 9 Oct 2020 |
| Layout approvalFile: KSP 1 OF 6.pdf | 8 Sep 2019 |
| Layout approvalFile: KSP 2 OF 6.pdf | 8 Sep 2019 |
| Layout approvalFile: KSP 3 OF 6.pdf | 8 Sep 2019 |
| Layout approvalFile: KSP 4 OF 6.pdf | 8 Sep 2019 |
| Layout approvalFile: KSP 5 OF 6.pdf | 8 Sep 2019 |
| Layout approvalFile: KSP 6 OF 6.pdf | 8 Sep 2019 |
| Building plan approvalFile: Permission.pdf | 8 Sep 2019 |
| PAN CardFile: Pan Card.pdf | 8 Sep 2019 |
| Copy of the legal title reportFile: Search Report.pdf | 8 Sep 2019 |
| Details of encumbrancesFile: Encumbrance.pdf | 8 Sep 2019 |
| Copy of Layout Approval (in case of layout)File: KSP 1 OF 6.pdf | 8 Sep 2019 |
| Copy of Layout Approval (in case of layout)File: KSP 2 OF 6.pdf | 8 Sep 2019 |
| Copy of Layout Approval (in case of layout)File: KSP 3 OF 6.pdf | 8 Sep 2019 |
| Copy of Layout Approval (in case of layout)File: KSP 4 OF 6.pdf | 8 Sep 2019 |
| Copy of Layout Approval (in case of layout)File: KSP 5 OF 6.pdf | 8 Sep 2019 |
| Copy of Layout Approval (in case of layout)File: KSP 6 OF 6.pdf | 8 Sep 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Permission.pdf | 8 Sep 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Permission.pdf | 8 Sep 2019 |
| Declaration in FORM BFile: Bwing.pdf | 8 Sep 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 8 Sep 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 Sep 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep KSP ALEXA - wing B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Maruti Mandir1,100+ in Ratnagiri
Navkar Enclave
Evergreen Associates
Kalpavriksha Heritage
Kalpavriksha Builders & Developers
LAXMI KEHSAV NAGAR PHASE II
DEEPAK YASHWANT SALVI
THE WIND
Arihant Vastu Nirman Pvt. Ltd
THE WOODLAND
Siddhivinayak Realty
AKAR VANAJU ESTATE
AKAR INFRASTRUCTURE
See every Ratnagiri project, with the district possession charts
Builder: KRISHNAT SHAHU POWAR
KRISHNAT SHAHU POWAR has 6 registrations on MahaRERA, including KSP RESIDENCY and KSP ALEXA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What does it mean that KSP ALEXA - wing B shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KSP ALEXA - wing B is delayed beyond 26 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KSP ALEXA - wing B?
The registered promoter entity is KRISHNAT SHAHU POWAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KSP ALEXA - wing B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KSP ALEXA - wing B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KSP ALEXA - wing B?
The professionals named in the filing: Architect: Geetanjali V Mote; Engineer: Sandeep S Shetye; Chartered Accountant: Prasad S Acharekar & Company; Chartered Accountant: Pawan Landage & Company; Chartered Accountant: Dhanashri Karmarkar & Associates; Chartered Accountant: Kedar Karambelkar & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KSP ALEXA - wing B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback