ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / KSHITIJ 23

Completed No litigation declared Residential / Group Housing project

KSHITIJ 23

By GANGOTREE HOMES (Previously known as Gangotree Greenbuild)

RG-MH-79663 · RERA P52100049832 · Last updated on MahaRERA portal: 19 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

KSHITIJ 23 is a Residential / Group Housing project by GANGOTREE HOMES (Previously known as Gangotree Greenbuild) in Pune, Maharashtra, registered with MahaRERA as P52100049832 on 6 Mar 2023. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameKSHITIJ 23
  • TypeResidential / Group Housing
  • Location
    • Chintamaninagar
    • Sahkaranagar 2
    • Parvati
    • Haveli
    • Pune
    • 411009
  • Pincode411009
  • RERA no.P52100049832
  • ReraGenie IDRG-MH-79663

Builder

  • NameGANGOTREE HOMES (Previously known as Gangotree Greenbuild)
  • Entity typePartnership
  • PartnersMakarand Vasant Kelkar, Ganesh Dnyanoba Jadhav, Rajendra Dnyaneshwar Awate
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KSHITIJ 23NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

KSHITIJ 23: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes80%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area512 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Kshitij Bank of India staff co-op Housing Soc. ltdParvatiPune

Approvals and building plan

Permissible FSI1725.02
Proposed, not sanctioned964 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchErandwane Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR AJAY AMLE
EngineerMr Tushar Shivarkar
Chartered AccountantChandorkar & Limaye
PartnerRole in project
GANGOTREE HOMES (Previously known as Gangotree Greenbuild)-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Nov 2024

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: KS23-Form 4.pdf19 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: KS23-Form 4.pdf19 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: KSHITIJ - Soc Reg Cert.pdf9 Nov 2024
Status of ConveyanceFile: PR card plot 23.pdf9 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate - Plot 23.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: KS23.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KS23.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert - KS23.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_KS23.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KS-23.pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: KS-23.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KS-23.pdf26 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Kshitij 23.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: Kshitij23.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kshitij 23_CA Cert.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate-KS23.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cer - KS23.pdf16 Jan 2024
Building plan approvalFile: 1 (2).pdf10 Nov 2023
Building plan approvalFile: 2.pdf10 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 (2).pdf10 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf10 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf10 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT 23 - Architect Certificate - 19-10-2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Kshitij-23 -16-10-23.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jun 23 CA Certificate KT 15 21-07-23.pdf27 Sep 2023
Building plan approvalFile: 1_compressed.pdf15 Sep 2023
Building plan approvalFile: 2_compressed.pdf15 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 1_compressed.pdf15 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 2_compressed.pdf15 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf15 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT 23 - Architect Certificate - 16-11-2022.pdf12 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT 23 - Architect Certificate - 19-04-2023.pdf12 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT 23 - Architect Certificate - 19-07-2023.pdf12 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate KS-23-2-11-22.pdf12 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Kshitij-23-10-1-23.pdf12 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Kshitij-23-19-4-23.pdf12 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Kshitij23-19-07-23.pdf12 Aug 2023
Disclosure of sold/ booked inventoryFile: K23.pdf12 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kshitij 23 form 3 march 2023.pdf12 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Kshitij 23.pdf2 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report_200261542085_For_Asset_Based_Search_28_02_2023_11_22_39_347.pdf28 Feb 2023
Details of encumbrances concerned to FinanceFile: Declaration of Encumrance - Finanace.pdf27 Feb 2023
Details of encumbrances concerned to LegalFile: Declaration of Encumrance - Finanace.pdf27 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank ac_page-0001.pdf27 Feb 2023
Proforma of Agreement for saleFile: Agreement - KSHITIJ - PLOT 23.pdf4 Feb 2023
Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER.pdf4 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of interest.pdf1 Feb 2023
Deviation Report with respect to Allotment letterFile: No deviation Allotment-23.pdf1 Feb 2023
Deviation Report with respect to model copy of AgreementFile: No deviation Agreement-23.pdf1 Feb 2023
Building plan approvalFile: Sanctioned Plan Plot No 23.pdf2 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan Plot No 23.pdf2 Jan 2023
Copy of the legal title reportFile: Format A and Search Title report.pdf28 Dec 2022
Declaration in FORM BFile: Form B - Plot 23.pdf28 Dec 2022
Details of encumbrances concerned to FinanceFile: Declaration of Encumrance - legal.pdf6 Dec 2022
Details of encumbrances concerned to LegalFile: Declaration of Encumrance - legal.pdf6 Dec 2022
Declaration about Commencement CertificateFile: Declaration about Commencement.pdf6 Dec 2022
Layout approvalFile: Sanctioned Plan Plot No 23.pdf2 Dec 2022
PAN CardFile: Pan Card GH.pdf2 Dec 2022
Copy of Layout Approval (in case of layout)File: Sanctioned Plan Plot No 23.pdf2 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: CC - 23.pdf2 Dec 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SUHRUDCTS No 1367 Mehendale Garage Road Erandawane Pune73CompletedNov 2021Nov 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KSHITIJ 23 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sahkaranagar 213,700+ in Pune

Builder: GANGOTREE HOMES (Previously known as Gangotree Greenbuild)

GANGOTREE HOMES (Previously known as GANGOTREE GREENBUILD) has 3 registrations on MahaRERA, including AABHA and KSHITIJ 15. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KSHITIJ 23 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KSHITIJ 23?

The registered promoter entity is GANGOTREE HOMES (Previously known as Gangotree Greenbuild), a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KSHITIJ 23?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KSHITIJ 23?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KSHITIJ 23?

The professionals named in the filing: Architect: AR AJAY AMLE; Engineer: Mr Tushar Shivarkar; Chartered Accountant: Chandorkar & Limaye. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KSHITIJ 23?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KSHITIJ 23. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KSHITIJ 23 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.