ReraGenieLog inGet a buyer report

Home / Browse projects / KRYPTON TWIN TOWER BUILDING B WING II

Completed No litigation declared Residential / Group Housing project

KRYPTON TWIN TOWER BUILDING B WING II

By KRYPTON CONSTRUCTION PRIVATE LIMITED

RG-MH-11676 · RERA P51900003096 · Last updated on MahaRERA portal: 28 Jun 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: .
Apr 2019Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 22 documents Report an error

KRYPTON TWIN TOWER BUILDING B WING II is a Residential / Group Housing project by KRYPTON CONSTRUCTION PRIVATE LIMITED in 400015, registered with MahaRERA as P51900003096 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Apr 2019.

At a glance

Project

  • NameKRYPTON TWIN TOWER BUILDING B WING II
  • TypeResidential / Group Housing
  • Location
    • 400015
  • Pincode400015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900003096
  • ReraGenie IDRG-MH-11676

Builder

  • NameKRYPTON CONSTRUCTION PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorSANJAY BHAWARLAL JAIN

Key dates

this monthRegisteredAug 2017PromisedApr 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion30 Apr 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed22 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING B WING IINA290000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jun 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BUILDING B WING II: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Jun 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed49

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots49
Closed/Covered26
Open Space23

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,011 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2728.4
Proposed, not sanctioned2,728 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHESHWARI MANSION,NAPEANSEA ROAD,MUMBAI-400036

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB R GANDHI & ASSOCIATES
EngineerDEEPAK KRISHNA SINGH
Chartered AccountantASHOK PERIWAL & ASSOCIATES
Chartered AccountantT R SHAH & CO
PartnerRole in project
KRYPTON CONSTRUCTION PRIVATE LIMITED-

Litigation declared3

CaseCourtStatus
369/2017BOMBAY HIGH COURTDISPOSED
3408/2016BOMBAY HIGH COURTPENDING
3034/2017BOMBAY HIGH COURTWITHDRAWN

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Nov 2019

Documents filed22

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Untitled-27-compressed.pdf28 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Kcpl FORM 5 18-19-1.pdf7 Nov 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf7 Nov 2019
Certificates of CA (Form 5)File: Kcpl FORM 5 18-19-1.pdf30 Sep 2019
Certificates of Architect (Form 4)File: form-4.pdf4 Feb 2019
Certificates of Architect (Form 4)File: OC.pdf4 Feb 2019
OtherFile: occupation certificate wing ii.pdf21 Dec 2018
Certificates of CA (Form 5)File: KCPL.pdf24 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 KCPL.pdf3 May 2018
Proforma of Allotment letterFile: agg kcpl final.pdf28 Jul 2017
Layout approvalFile: layout.pdf24 Jul 2017
Copy of Layout Approval (in case of layout)File: layout.pdf24 Jul 2017
Building plan approvalFile: IOD KCPL SALE BLDG(1).pdf21 Jul 2017
PAN CardFile: PAN CARD KCPL.pdf21 Jul 2017
Copy of the legal title reportFile: KCPL TITLE CERTIFICATE.pdf21 Jul 2017
Details of encumbrancesFile: KCPL ENCUMBRANCES.pdf21 Jul 2017
Building Plan Approval (IOD)File: IOD KCPL SALE BLDG(1).pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: KCPL CC.pdf21 Jul 2017
Declaration in FORM BFile: KCPL AFFIDAVIT.pdf21 Jul 2017
Certificates of CA (Form 3)File: KCPL CA CERT.pdf21 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH CERT.PDF20 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERTIFICATE.PDF20 Jul 2017

Keep KRYPTON TWIN TOWER BUILDING B WING II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmKRYPTON TWIN TOWER BUILDCompleted 3Lapsed / revoked 6Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: KRYPTON CONSTRUCTION PRIVATE LIMITED

KRYPTON CONSTRUCTION PRIVATE LIMITED has 1 registration on MahaRERA, including KRYPTON TWIN TOWER BUILDING B WING II. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if KRYPTON TWIN TOWER BUILDING B WING II is delayed beyond 30 Apr 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRYPTON TWIN TOWER BUILDING B WING II?

The registered promoter entity is KRYPTON CONSTRUCTION PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRYPTON TWIN TOWER BUILDING B WING II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRYPTON TWIN TOWER BUILDING B WING II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRYPTON TWIN TOWER BUILDING B WING II?

The professionals named in the filing: Architect: B R GANDHI & ASSOCIATES; Engineer: DEEPAK KRISHNA SINGH; Chartered Accountant: ASHOK PERIWAL & ASSOCIATES; Chartered Accountant: T R SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRYPTON TWIN TOWER BUILDING B WING II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRYPTON TWIN TOWER BUILDING B WING II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRYPTON TWIN TOWER BUILDING B WING II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.