Home / Browse projects / Pune, Maharashtra / KRUSHNAKUNJ

Registration lapsed No litigation declared Residential / Group Housing project

KRUSHNAKUNJ

By PRAVIN KESHAV BADHEKAR

RG-MH-91235 · RERA P52100050407 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
8 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

KRUSHNAKUNJ is a Residential / Group Housing project by PRAVIN KESHAV BADHEKAR in Pune, Maharashtra, registered with MahaRERA as P52100050407 on 12 Apr 2023. Possession was promised by 21 Dec 2025 and is now 10 months past that date. 4 of the 12 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameKRUSHNAKUNJ
  • TypeResidential / Group Housing
  • Location
    • RIGHT BHUSARI COLONY
    • KOTHRUD
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050407
  • ReraGenie IDRG-MH-91235

Builder

  • NamePRAVIN KESHAV BADHEKAR
  • Entity typeIndividual
  • GSTIN27AEPPB8899F1ZU
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations14 more →
  • Completed2 of 15
  • No longer live4 lapsed, de-registered or revoked
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

10 months past promisethis monthRegisteredApr 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Apr 2023
  • Promised completion21 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Current status

33%4 of 12 units booked
68.8%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KRUSHNAKUNJNA6612012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

KRUSHNAKUNJ: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered13
Open Space13

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area477 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Nov 2025
LandownerVillageDistrict
NUTAN BHIMRAO PADWALKothrudPune
SANGEETA SUDHAKAR PADWALKothrudPune
BADHEKAR DEVELOPERSKothrudPune

Approvals and building plan

Sanctioning authorityPune Muncipal Corporation
Permissible FSI1526.4
Proposed, not sanctioned839 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTHRUD
Estimated costRs 5.71 cr
Cost incurredRs 3.93 cr
Work done68.82%
BuildingWingEstimatedIncurred
KRUSHNAKUNJNARs 4.77 crRs 3.67 cr
-NARs 94.09 lakhRs 26.26 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPI CONSULTANTS
EngineerStructus Consultantss Pvt. Ltd.
EngineerDipali Amit Kulkarni
Chartered AccountantD.B.GANDHI & ASSOCIATES
Chartered AccountantShrikant Mantri
Chartered AccountantSHRIKANT MANTRI AND CO.
PartnerRole in project
BADHEKAR DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate Krushnakunj Dec 25.pdf15 Apr 2026
Withdrawal Update Form 2File: Engineers certificate Krushankunj Dec -25.pdf15 Apr 2026
Withdrawal Update Form 3File: Krushnkunj RERA Form 3 upto Dec-25 Scan copy.pdf15 Apr 2026
Building plan approvalFile: 1.pdf13 Apr 2026
Building plan approvalFile: 2.pdf13 Apr 2026
Building plan approvalFile: 3.pdf13 Apr 2026
Commencement certificateFile: PADWAL PLOT REVISED SANCTION PLAN - CC.pdf13 Apr 2026
Withdrawal Update Form 1File: Architect certificate Krushnakunj site Jun-25..pdf13 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Krushnakunj 30 Sept 25.pdf13 Apr 2026
Withdrawal Update Form 2File: Engineers certificate Krushankunj Jun-25.pdf13 Apr 2026
Withdrawal Update Form 2File: Engineers certificate Krushankunj Site Sept-25.pdf13 Apr 2026
Withdrawal Update Form 3File: Krushnkunj RERA Form 3 upto Jun-25 Scan copy.pdf13 Apr 2026
Withdrawal Update Form 3File: Krushnkunj RERA Form 3 upto Sep-25 Scan copy.pdf13 Apr 2026
Form 5 (FY 2024-2025)File: Krushnakunja FY 24-25 RERA 5 Scan.pdf26 Mar 2026
Form 2A (FY 2025-2026)File: Form 2A Krushnakunj 25-26.pdf22 Jan 2026
Form 1File: Engineer’s Certificate - Krushnakunj Nov 2022.pdf27 Nov 2025
Form 2File: Engineer’s Certificate - Krushnakunj Nov 2022.pdf27 Nov 2025
Form 3File: Engineer’s Certificate - Krushnakunj Nov 2022.pdf27 Nov 2025
Disclosure of Sold and Booked InventoryFile: Engineer’s Certificate - Krushnakunj Nov 2022.pdf27 Nov 2025
Building plan approvalFile: 2.pdf25 Nov 2025
Building plan approvalFile: 1.pdf25 Nov 2025
Building plan approvalFile: 3.pdf25 Nov 2025
Form 1File: Architect certificate Krushnakunj site Mar-25..pdf24 Nov 2025
Form 2File: Architect certificate Krushnakunj site Mar-25..pdf24 Nov 2025
Form 3File: Architect certificate Krushnakunj site Mar-25..pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect certificate Krushnakunj site Mar-25..pdf24 Nov 2025
Form 1File: Architect’s Certificate - Krushnakunj Dec 24.pdf24 Nov 2025
Form 2File: Engineer Cert Form 2 Krushnakunj site Dec-24.pdf24 Nov 2025
Form 3File: Krushnakunj RERA Form 3 CA Certificates Dec-24.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Krushnakunj Dec 24.pdf24 Nov 2025
Form 1File: Architect’s Certificate - Krushnakunj Sep 24.pdf24 Nov 2025
Form 2File: Engineers certificate Krushnakunj - Sep 24.pdf24 Nov 2025
Form 3File: Krushnakunj RERA Form 3 CA Certificates Sep-24.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Krushnakunj Sep 24.pdf24 Nov 2025
Form 1File: Architect’s Certificate - Krushnakunj Jun 24.pdf24 Nov 2025
Form 2File: Engineers certificate Krushnakunj - Jun 24.pdf24 Nov 2025
Form 3File: Krushnakunj RERA Form 3 CA Certificates Jun-24.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Krushnakunj Jun 24.pdf24 Nov 2025
Form 1File: Architect’s Certificate - Krushnakunj Mar 24.pdf24 Nov 2025
Form 2File: Architect’s Certificate - Krushnakunj Mar 24.pdf24 Nov 2025
Form 3File: CA Certificates Krushnakunj Mar-24.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Krushnakunj Mar 24.pdf24 Nov 2025
Form 1File: Architect’s Certificate - Krushnakunj Dec 2023.pdf24 Nov 2025
Form 2File: Architect’s Certificate - Krushnakunj Dec 2023.pdf24 Nov 2025
Form 3File: Architect’s Certificate - Krushnakunj Dec 2023.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Krushnakunj Dec 2023.pdf24 Nov 2025
Form 1File: Architect’s Certificate - Krushnakunj Sep 2023.pdf24 Nov 2025
Form 2File: Architect’s Certificate - Krushnakunj Sep 2023.pdf24 Nov 2025
Form 3File: Architect’s Certificate - Krushnakunj Sep 2023.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Architect’s Certificate - Krushnakunj Sep 2023.pdf24 Nov 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf15 Jul 2025
Form 2A (FY 2023-2024)File: Form 2 A QAC Krushnakunj site 23-24.pdf11 Jul 2025
Form 2A (FY 2024-2025)File: Form 2 A QAC Krushnakunj site 24-25..pdf11 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Krushnakunja FY 23-24 RERA 5 Scan.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Krushnakunj Form 1 RERA Architect's.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Krushnakunj Form 1 Architect's certificate.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Krushnakunj Form 1 RERA Architect's application-June 24.pdf12 Aug 2024
Building plan approvalFile: KRUSHNAKUNJ PADWAL PLOT REVISE SANCTION PLAN 1_3_compressed.pdf17 May 2024
Building plan approvalFile: KRUSHNAKUNJ PADWAL PLOT REVISE SANCTION PLAN 2_3_compressed.pdf17 May 2024
Building plan approvalFile: KRUSHNAKUNJ PADWAL PLOT REVISE SANCTION PLAN 3_3_compressed.pdf17 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KRUSHNAKUNJ PADWAL PLOT REVISE SANCTION PLAN 1_3_compressed.pdf17 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KRUSHNAKUNJ PADWAL PLOT REVISE SANCTION PLAN 2_3_compressed.pdf17 May 2024
Building Plan Approval / NA Order for plotted developmentFile: KRUSHNAKUNJ PADWAL PLOT REVISE SANCTION PLAN 3_3_compressed.pdf17 May 2024
Commencement Certificates / NA Order for plotted developmentFile: KRUSHNAKUNJ PADWAL PLOT REVISE SANCTION CC.pdf17 May 2024
Declaration about Commencement CertificateFile: Declaration about CC Krushnakunj-060524.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Krushnakunj_Form 1 Architect's certificate.pdf17 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in REO-BPP.pdf17 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in REO-SP.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sanjeevan-Dec 23.pdf19 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Krushnakunj site Form 2A QAC.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Krushnakunj-Sep 23.pdf22 Oct 2023
Other - LegalFile: DA 1.pdf1 Apr 2023
Other - LegalFile: DA 2.pdf1 Apr 2023
Copy of the legal title reportFile: Padwal_compressed.pdf16 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in REO-BP.pdf14 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in REO-ES.pdf14 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in REO-PPI.pdf14 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in REO-SP.pdf14 Mar 2023
Proforma of Agreement for saleFile: R3 Agreement for Sale-14_03_23.pdf14 Mar 2023
Layout approvalFile: SANCTION PLAN 1_2 PADWAL PLOT BHUSARI COLONY_compressed.pdf28 Nov 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SAMRUDDHI RESIDENCYP52100006236Warje, Pune15Aug 2017CompletedFeb 2023Registered original: Jul 2019Late, Feb 2024
VINAYAK15P52100007478Rambaug Colony, Pune14Aug 2017CompletedNov 2021Dec 2019

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRUSHNAKUNJ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOTHRUD13,700+ in Pune

2 kmKRUSHNAKUNJCompleted 53Lapsed / revoked 33Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 181 registered projects within 2 km.

Builder: PRAVIN KESHAV BADHEKAR

PRAVIN KESHAV BADHEKAR has 15 registrations on MahaRERA, including SAMRUDDHI RESIDENCY and VINAYAK15. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that KRUSHNAKUNJ shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KRUSHNAKUNJ is delayed beyond 21 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRUSHNAKUNJ?

The registered promoter entity is PRAVIN KESHAV BADHEKAR, an individual as per the filing. Its GSTIN 27AEPPB8899F1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRUSHNAKUNJ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRUSHNAKUNJ?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRUSHNAKUNJ?

The professionals named in the filing: Architect: PI CONSULTANTS; Engineer: Structus Consultantss Pvt. Ltd.; Engineer: Dipali Amit Kulkarni; Chartered Accountant: D.B.GANDHI & ASSOCIATES; Chartered Accountant: Shrikant Mantri; Chartered Accountant: SHRIKANT MANTRI AND CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRUSHNAKUNJ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRUSHNAKUNJ. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRUSHNAKUNJ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.